Skip to main content
PermitBase

Plumbing Permit in Rexburg, Idaho

Required for plumbing installation, alteration, or repair work in Rexburg, governed by the 2017 Idaho Plumbing Code as adopted by the City. The Rexburg Building Department issues and inspects plumbing permits directly through its own Plumbing Program — not the Idaho Division of Building Safety.

Verified 2026-07-04 · Source

When you need this permit

  • Plumbing permit required for installation, alteration, or repair of plumbing systems
  • Governed by the 2017 Idaho Plumbing Code as adopted by the City of Rexburg
  • Charged as a separate per-discipline fee alongside building/electrical/mechanical fees on new residential and multi-family projects
  • Backflow prevention rules apply per the City's published backflow-prevention document
  • For duplex conversions and short-term rentals: separate water shut-off required per dwelling unit and a licensed (non-owner) plumber required for rental-property work
  • Apply through the City's Public Portal (apply.rexburg.org/publicapp) or the Mechanical/Electrical/Plumbing Misc. Project application for standalone plumbing work

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential Plumbing Fee (per discipline) — less than 1,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator; charged per trade based on sq ft of living space
$130.00
Residential Plumbing Fee (per discipline) — 1,500 to 2,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$195.00
Residential Plumbing Fee (per discipline) — 2,500 to 3,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$260.00
Residential Plumbing Fee (per discipline) — 3,500 to 4,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$325.00
Residential Plumbing Fee (per discipline) — 4,500 to 5,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$390.00
Residential Plumbing Fee (per discipline) — 5,500 to 6,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$455.00
Multi-Family Plumbing Fee formulaCity of Rexburg Multi Family Residence Fee Estimator
$65.00 per unit + $130.00 per building
Multi-Family Water Meter — 3/4 inchCity of Rexburg Multi Family Residence Fee Estimator
$732.00
Multi-Family Water Meter — 1 inchCity of Rexburg Multi Family Residence Fee Estimator
$936.00
Multi-Family Water Meter — 1.5 inch (outside)City of Rexburg Multi Family Residence Fee Estimator
$1,489.00
Multi-Family Water Meter — 1.5 inch (inside)City of Rexburg Multi Family Residence Fee Estimator
$1,217.00
Multi-Family Water Meter — 2 inch (outside)City of Rexburg Multi Family Residence Fee Estimator
$3,269.00
Multi-Family Water Meter — 2 inch (inside)City of Rexburg Multi Family Residence Fee Estimator
$2,927.00
Standalone / Misc. Plumbing Project FeeNo standalone flat fee schedule for miscellaneous plumbing-only projects (not tied to new construction) was found published; contact the Building Department at (208) 372-2166 or building@rexburg.org.
Not published — contact the department

Review timeline

Plan review
Not published — contact the department

How long did your Plumbing Permit permit actually take in Rexburg?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Plumbing Underground

    Any plumbing under slab/concrete floor, inspected before concrete is poured; includes radon piping where applicable

  2. 2

    Plumbing Water & Sewer

    Checks city water and city sewer connections to the structure

  3. 3

    Plumbing Rough-In

    Made prior to covering or concealment, before framing inspection

  4. 4

    Plumbing Final

    All systems in place, fixtures set, ready for occupancy

See the full Rexburg inspection guide — scheduling & re-inspection fees →

Tips

  • The Building Department, not the Idaho Division of Building Safety, issues and inspects plumbing permits directly within Rexburg city limits.
  • Backflow prevention rules and current code amendments are published as separate reference documents on the City's Laserfiche repository, linked from the Plumbing Information page.
  • Multi-family projects are charged both a per-unit/per-building MEP fee and a separate water-meter fee scaled by meter size.

Frequently asked questions

Rexburg requires a plumbing permit for: Plumbing permit required for installation, alteration, or repair of plumbing systems; Governed by the 2017 Idaho Plumbing Code as adopted by the City of Rexburg; Charged as a separate per-discipline fee alongside building/electrical/mechanical fees on new residential and multi-family projects; Backflow prevention rules apply per the City's published backflow-prevention document; For duplex conversions and short-term rentals: separate water shut-off required per dwelling unit and a licensed (non-owner) plumber required for rental-property work; Apply through the City's Public Portal (apply.rexburg.org/publicapp) or the Mechanical/Electrical/Plumbing Misc. Project application for standalone plumbing work. If your project isn't listed, confirm with City of Rexburg Building Department at (208) 372-2166 before starting work.

In Rexburg, the published Residential Plumbing Fee (per discipline) — less than 1,500 sq ft is: $130.00. Additional published fees: Residential Plumbing Fee (per discipline) — 1,500 to 2,500 sq ft — $195.00; Residential Plumbing Fee (per discipline) — 2,500 to 3,500 sq ft — $260.00; Residential Plumbing Fee (per discipline) — 3,500 to 4,500 sq ft — $325.00; Residential Plumbing Fee (per discipline) — 4,500 to 5,500 sq ft — $390.00; Residential Plumbing Fee (per discipline) — 5,500 to 6,500 sq ft — $455.00; Multi-Family Plumbing Fee formula — $65.00 per unit + $130.00 per building; Multi-Family Water Meter — 3/4 inch — $732.00; Multi-Family Water Meter — 1 inch — $936.00; Multi-Family Water Meter — 1.5 inch (outside) — $1,489.00; Multi-Family Water Meter — 1.5 inch (inside) — $1,217.00; Multi-Family Water Meter — 2 inch (outside) — $3,269.00; Multi-Family Water Meter — 2 inch (inside) — $2,927.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Rexburg does not publish a plan-review timeline for this permit. Contact City of Rexburg Building Department at (208) 372-2166 for current turnaround.

You'll need: Mechanical/Electrical/Plumbing Misc. Project Application. See the required-documents checklist on this page for details on each.

Rexburg requires 4 inspection(s) for a plumbing permit, in order: Plumbing Underground, Plumbing Water & Sewer, Plumbing Rough-In, Plumbing Final. Schedule each through City of Rexburg Building Department ((208) 372-2166).

Apply through City of Rexburg Building Department at 35 N 1st East, Rexburg, ID 83440. Phone: (208) 372-2166, email: building@rexburg.org. Office hours: City Hall Open Hours: M-Th 7:30 am - 5:30 pm, F 7:30 am - 12:30 pm. Main City switchboard: (208) 359-3020; Building Department direct line: (208) 372-2166.. Official information: https://www.rexburg.org/o/cor/page/building.

Rexburg, Idaho has adopted: The City of Rexburg operates its own Building Department, which handles ALL trade permitting (building, mechanical, electrical, plumbing, and fire) in-house — it is not a DOPL-administered jurisdiction for permit issuance. The Building Official 'enforces and interprets the building code,' 'supervises the mechanical, electrical, plumbing, and fire inspectors,' and the Building Department's stated scope explicitly covers mechanical, electrical, and plumbing programs as sub-programs of the Building Department itself, each with dedicated per-discipline permit fees. Source: City of Rexburg Building page (rexburg.org/o/cor/page/building).; 2018 International Building Code (IBC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page (rexburg.org/o/cor/page/codes-standards).; 2018 International Residential Code (IRC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2023 National Electrical Code (NEC / NFPA 70), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page; also referenced on the Electrical Information page.; 2018 International Mechanical Code (IMC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2017 Idaho Plumbing Code (IAPMO), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2018 International Fuel Gas Code (IFGC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2018 International Energy Conservation Code (IECC) — both the Commercial and Residential chapters, adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2018 International Existing Building Code (IEBC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2018 International Fire Code (IFC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2016 NFPA 72 (National Fire Alarm and Signaling Code), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; Plans submitted for commercial projects must be stamped by a licensed Idaho architect or engineer. Source: City of Rexburg Codes & Standards page.; The permitting process takes up to 10 business days from initial application to issuance of the permit; the process can be longer depending on backlog; the permit process is on a first-come, first-served basis. Source: City of Rexburg Codes & Standards page.; Rexburg Development Code (Title/Code 1200) governs zoning, including short-term rental registration and duplex-conversion zoning eligibility (density-based lot-size minimums by zone). Source: Rexburg Development Code online, rexburg.municipalcodeonline.com/book?type=development.. Local amendments apply — see the Rexburg overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rexburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.