Skip to main content
PermitBase

Residential Building Permit (Single Family Home / Townhome) in Rexburg, Idaho

Required for new single-family residence and townhome construction in Rexburg, reviewed against the 2018 IRC and 2018 IECC as adopted by the City. Applications are submitted through the City's online Public Portal (apply.rexburg.org/publicapp).

Verified 2026-07-04 · Source

When you need this permit

  • Building permit required for new single-family residence and townhome construction
  • Plans reviewed against the 2018 IRC and 2018 IECC (Residential) as adopted by the City of Rexburg
  • Plan submittals must meet the City's Digital Plan Submission Standards (vector-based PDF, no scans/images, no passwords, bookmarked pages, version-numbered filenames, scale/north-arrow/stamps on plans)
  • Create an account on the City's Public Portal (apply.rexburg.org/publicapp) to submit the application online
  • Townhome projects: total fee is multiplied by the number of units per the Single Family Residence/Townhomes Fee Estimator

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee (estimate) — 0 to 1,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator (average, building fees only) — estimates only, may not fully reflect actual permit cost
$2,000.00
Building Permit Fee (estimate) — 1,501 to 2,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$3,000.00
Building Permit Fee (estimate) — 2,501 to 3,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$3,800.00
Building Permit Fee (estimate) — 3,501 to 4,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$4,500.00
Building Permit Fee (estimate) — 4,501 to 5,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$5,500.00
Building Permit Fee (estimate) — 5,501 to 6,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$6,000.00
Plan Review FeeCity of Rexburg Single Family Residence/Townhomes Fee Estimator
10% of the calculated Building Permit fee
Mechanical / Electrical / Plumbing Fee (each discipline) — less than 1,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator; fee based on sq ft of living space (upper/main/bonus/basement, not garage), charged separately per trade
$130.00 per discipline
Mechanical / Electrical / Plumbing Fee (each discipline) — 1,500 to 2,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$195.00 per discipline
Mechanical / Electrical / Plumbing Fee (each discipline) — 2,500 to 3,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$260.00 per discipline
Mechanical / Electrical / Plumbing Fee (each discipline) — 3,500 to 4,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$325.00 per discipline
Mechanical / Electrical / Plumbing Fee (each discipline) — 4,500 to 5,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$390.00 per discipline
Mechanical / Electrical / Plumbing Fee (each discipline) — 5,500 to 6,500 sq ftCity of Rexburg Single Family Residence/Townhomes Fee Estimator
$455.00 per discipline
Impact Fees (streets, parks/trails, police, fire) and Capacity Fees (water, sewer)Determined by Public Works; not published as a static figure on the Building Department's fee estimator pages ('IMPACT FEES TO BE DETERMINED BY PUBLIC WORKS'). Contact Public Works or the Chief Finance Officer (finance@rexburg.org, (208) 372-2343) for current amounts.
Not published — contact the department

Review timeline

Plan reviewRexburg’s published plan-review target
Up to 10 business days

How long did your Residential Building Permit (Single Family Home / Townhome) permit actually take in Rexburg?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Layout & Footing

    Lot corners staked before excavation; footing made after poles/piers set or trenched/basement excavated; forms and reinforcing in place

  2. 2

    Foundation

    Excavations for thickened slabs supporting bearing walls/partitions/structural supports/equipment; all forms and reinforcing steel in place

  3. 3

    Plumbing Underground

    Any plumbing under slab/concrete floor, inspected before concrete is poured; includes radon piping where applicable

  4. 4

    Plumbing Water & Sewer

    Checks city water and city sewer connections to the house

  5. 5

    Sheeting

    Inspected for nail separation, prior to plumbing/electrical/mechanical work

  6. 6

    Plumbing Rough-In

    Made prior to covering or concealment, before framing inspection

  7. 7

    HVAC (Mechanical) Rough-In & Gas Pressure Test

    Made prior to covering or concealment, before framing inspection

  8. 8

    Electrical Service

    Conductors/equipment delivering energy from the serving utility to the premises wiring system (not applicable to all projects)

  9. 9

    Electrical Rough-In

    Made prior to covering or concealment, before framing inspection

  10. 10

    Framing

    After roof, masonry, all framing, fire stopping, draft stopping, bracing, and house wrap are in place

  11. 11

    Insulation

    Outside envelope inspection for energy code compliance

  12. 12

    Drywall

    After interior wallboard is in place, before texture is applied and joints/fasteners are taped and finished

  13. 13

    Sidewalk

    6 inches of gravel fill in valley locations, 12 inches on hill locations; standard 5 ft width with broom finish; expansion joint filler at driveways and max 50 ft spacing

  14. 14

    Electrical Final

    Fixtures and wall covers in place, appliances in place, panel directory completed, ready for occupancy

  15. 15

    Plumbing Final

    All systems in place, fixtures set, ready for occupancy

  16. 16

    HVAC (Mechanical) Final

    All systems in place, fixtures set, ready for occupancy

  17. 17

    Building Final

    Made after all other finals have passed; building completed and ready for occupancy

See the full Rexburg inspection guide — scheduling & re-inspection fees →

Tips

  • The City publishes an average building-fee estimate table by square footage, but explicitly states these are estimates only and may not reflect the final permit cost.
  • Mechanical, Electrical, and Plumbing (MEP) fees are each charged as a separate per-discipline fee, scaled to the same square-footage tiers as the building fee.
  • Impact fees (streets, parks/trails, police, fire) and capacity fees (water, sewer) are determined by Public Works separately from the Building Department's estimate and are not included in the published fee tables.
  • Applicants can view required inspections for their specific permit directly in the online Public Portal.

Frequently asked questions

Rexburg requires a residential building permit (single family home / townhome) for: Building permit required for new single-family residence and townhome construction; Plans reviewed against the 2018 IRC and 2018 IECC (Residential) as adopted by the City of Rexburg; Plan submittals must meet the City's Digital Plan Submission Standards (vector-based PDF, no scans/images, no passwords, bookmarked pages, version-numbered filenames, scale/north-arrow/stamps on plans); Create an account on the City's Public Portal (apply.rexburg.org/publicapp) to submit the application online; Townhome projects: total fee is multiplied by the number of units per the Single Family Residence/Townhomes Fee Estimator. If your project isn't listed, confirm with City of Rexburg Building Department at (208) 372-2166 before starting work.

In Rexburg, the published Building Permit Fee (estimate) — 0 to 1,500 sq ft is: $2,000.00. Additional published fees: Building Permit Fee (estimate) — 1,501 to 2,500 sq ft — $3,000.00; Building Permit Fee (estimate) — 2,501 to 3,500 sq ft — $3,800.00; Building Permit Fee (estimate) — 3,501 to 4,500 sq ft — $4,500.00; Building Permit Fee (estimate) — 4,501 to 5,500 sq ft — $5,500.00; Building Permit Fee (estimate) — 5,501 to 6,500 sq ft — $6,000.00; Plan Review Fee — 10% of the calculated Building Permit fee; Mechanical / Electrical / Plumbing Fee (each discipline) — less than 1,500 sq ft — $130.00 per discipline; Mechanical / Electrical / Plumbing Fee (each discipline) — 1,500 to 2,500 sq ft — $195.00 per discipline; Mechanical / Electrical / Plumbing Fee (each discipline) — 2,500 to 3,500 sq ft — $260.00 per discipline; Mechanical / Electrical / Plumbing Fee (each discipline) — 3,500 to 4,500 sq ft — $325.00 per discipline; Mechanical / Electrical / Plumbing Fee (each discipline) — 4,500 to 5,500 sq ft — $390.00 per discipline; Mechanical / Electrical / Plumbing Fee (each discipline) — 5,500 to 6,500 sq ft — $455.00 per discipline. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

The permitting process takes up to 10 business days from initial application to issuance of the permit; the process can take longer depending on backlog, and permits are processed first-come, first-served. Source: City of Rexburg Codes & Standards page.

You'll need: Single Family Home Permit Application; Full Construction Drawing Set. See the required-documents checklist on this page for details on each.

Rexburg requires 17 inspection(s) for a residential building permit (single family home / townhome), in order: Layout & Footing, Foundation, Plumbing Underground, Plumbing Water & Sewer, Sheeting, Plumbing Rough-In, HVAC (Mechanical) Rough-In & Gas Pressure Test, Electrical Service, Electrical Rough-In, Framing, Insulation, Drywall, Sidewalk, Electrical Final, Plumbing Final, HVAC (Mechanical) Final, Building Final. Schedule each through City of Rexburg Building Department ((208) 372-2166).

Apply through City of Rexburg Building Department at 35 N 1st East, Rexburg, ID 83440. Phone: (208) 372-2166, email: building@rexburg.org. Office hours: City Hall Open Hours: M-Th 7:30 am - 5:30 pm, F 7:30 am - 12:30 pm. Main City switchboard: (208) 359-3020; Building Department direct line: (208) 372-2166.. Official information: https://www.rexburg.org/o/cor/page/building.

Rexburg, Idaho has adopted: The City of Rexburg operates its own Building Department, which handles ALL trade permitting (building, mechanical, electrical, plumbing, and fire) in-house — it is not a DOPL-administered jurisdiction for permit issuance. The Building Official 'enforces and interprets the building code,' 'supervises the mechanical, electrical, plumbing, and fire inspectors,' and the Building Department's stated scope explicitly covers mechanical, electrical, and plumbing programs as sub-programs of the Building Department itself, each with dedicated per-discipline permit fees. Source: City of Rexburg Building page (rexburg.org/o/cor/page/building).; 2018 International Building Code (IBC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page (rexburg.org/o/cor/page/codes-standards).; 2018 International Residential Code (IRC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2023 National Electrical Code (NEC / NFPA 70), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page; also referenced on the Electrical Information page.; 2018 International Mechanical Code (IMC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2017 Idaho Plumbing Code (IAPMO), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2018 International Fuel Gas Code (IFGC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2018 International Energy Conservation Code (IECC) — both the Commercial and Residential chapters, adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2018 International Existing Building Code (IEBC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2018 International Fire Code (IFC), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; 2016 NFPA 72 (National Fire Alarm and Signaling Code), adopted by the City of Rexburg. Source: City of Rexburg Codes & Standards page.; Plans submitted for commercial projects must be stamped by a licensed Idaho architect or engineer. Source: City of Rexburg Codes & Standards page.; The permitting process takes up to 10 business days from initial application to issuance of the permit; the process can be longer depending on backlog; the permit process is on a first-come, first-served basis. Source: City of Rexburg Codes & Standards page.; Rexburg Development Code (Title/Code 1200) governs zoning, including short-term rental registration and duplex-conversion zoning eligibility (density-based lot-size minimums by zone). Source: Rexburg Development Code online, rexburg.municipalcodeonline.com/book?type=development.. Local amendments apply — see the Rexburg overview page for the full list.

The City of Rexburg Building Department issues and inspects all building, electrical, mechanical, and plumbing permits directly — the Building Official supervises dedicated mechanical, electrical, plumbing, and fire inspectors on staff. This is not routed through the Idaho Division of Building Safety (DBS) for permit issuance within city limits. Source: City of Rexburg Building page.

Sources & verification

Verified against official sources. Last reviewed 2026-07-04.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rexburg building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.