Rupert building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Rupert, Idaho.

Verified 2026-07-19 · Source

How to schedule

Inspections are requested through the building department below.

Address
715 G Street, Rupert, ID 83350 (P.O. Box 368, Rupert, ID 83350)
Phone
(208) 436-7183 (Building Department); (208) 436-7180 (Building & Zoning general line)
Office hours
Monday-Friday, 8:30 a.m. to 5:00 p.m., per the Minidoka County Building and Zoning page. Building Official: Rick Nay (also the City of Rupert's Zoning Administrator, per the Residential and Manufactured Home Building Permit Guides). Building Inspectors: Taylor Podunovich, Kortnie Kent.

Inspection sequence

Applies to: Solar PV Permit (Building Permit + State-Issued Electrical)

  1. 1

    Foundation/Roof-Mount Structural (Minidoka County)

    Verifies racking/mounting and any structural modification per the county-adopted 2018 IRC/IBC

  2. 2

    Electrical Rough-In (Idaho DOPL)

    Grounding and listing of all components verified before the system is covered or energized

  3. 3

    Electrical Final (Idaho DOPL)

    Wiring methods, labeling at the shut-off, working clearances, and system operation verified

  4. 4

    Building Final (Minidoka County)

    Final building inspection prior to occupancy/use of the completed installation

Applies to: Commercial / Multi-Family Building Permit

  1. 1

    Foundation

    Per the county-adopted 2018 IBC, including required structural steel reinforcing and special inspection criteria noted on the Foundation Plan.

  2. 2

    Framing/Structural

    Covers roof framing, floor framing, header/beam schedules, shear walls, and other structural elements per the submitted Structural Plans.

  3. 3

    Final

    Final inspection prior to issuance of a certificate of occupancy or completion, per IBC Section 111.1 as adopted.

Applies to: Residential Building Permit

  1. 1

    Footing/Foundation

    Per the county-adopted 2018 IRC; the Residential Application Packet's own itemized inspection sequence/checklist is not separately published online beyond the plan-review submittal requirements as of 2026-07-19.

  2. 2

    Framing

    Structural framing inspection consistent with the adopted 2018 IRC.

  3. 3

    Final

    Final building inspection prior to occupancy; a Certificate of Occupancy is required before use/occupancy per IRC R110.1 as adopted.

Applies to: Manufactured Home Permit

  1. 1

    Foundation/Blocking and Anchoring

    Verifies the foundation or blocking-and-anchoring design (spacing, sizing, locations) matches the submitted Foundation Plan.

  2. 2

    Final

    Final inspection prior to occupancy, including verification of landings/egress and skirting details.

Sources & verification

Verified against official sources. Last reviewed 2026-07-19.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Rupert building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Rupert building permits

Get alerts for Rupert

We'll email you when Rupert's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.