Solar PV Permit in Unincorporated Nez Perce County, Idaho
Nez Perce County has no dedicated solar or photovoltaic permit type or fee category. Its Building Permits page lists only Accessory Building, Blasting, Commercial Building, Manufactured Home, Mechanical, Single Family Residence, and Siting (Agricultural) permits, and the Residential Building Permit Fee Schedule (effective 10-1-2017) has no “solar” line item. A rooftop or ground-mounted PV installation is most likely processed as an Accessory Building Permit covering the structural and mounting work, using the schedule's per-square-foot categories and its own fallback rule that “the contract amount shall be used where it exceeds this table”. Electrical interconnection is expected to go through the Idaho Division of Occupational and Professional Licenses (DOPL), the statewide pattern for Idaho counties that have not separately adopted the NEC, but the county does not confirm this on its own site — settle the permit path with the Building Department before you order equipment.
Reviewed 2026-07-20 · Source
When you need this permit
- No distinct solar permit exists; a PV installation is expected to be processed as a standard Accessory Building Permit (structural/mounting/racking work) or, for larger new-construction projects, folded into the applicable Building Permit category
- Because no per-square-foot solar rate is published, the fee schedule's own stated fallback applies: 'the contract amount shall be used where it exceeds this table' — i.e., actual contract cost governs where the structure doesn't match a listed category
- Electrical interconnection — arrays, inverters and point of connection — is expected to require a separate Idaho DOPL Electrical Permit, since Nez Perce County's own Building Permits page lists no county Electrical Permit type. That follows the statewide DOPL pattern, but it is not confirmed on the county's own site, so verify before relying on it.
- Apply through Nez Perce County Planning and Building Department (Courthouse, 3rd Floor, 1230 Main Street, Lewiston) using the general Accessory Building Permit / Building Permit application
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Nez Perce County Residential Building Permit Fee Schedule, effective 10-1-2017 — no 'solar' line item exists among the published categories (Fixed Living Space $112.65/sq ft, Interior Finish &… Show full citationHide
Nez Perce County Residential Building Permit Fee Schedule, effective 10-1-2017 — no 'solar' line item exists among the published categories (Fixed Living Space $112.65/sq ft, Interior Finish & Remodel $56.33/sq ft, Garages $44.63/sq ft, Decks/Carports/Patio Covers $13.80/sq ft, Pole Buildings $14.06/sq ft, Manufactured Home Foundation/Slab $18.59/sq ft).Review timeline
Inspection process
- 1
Final Inspection
Mounting/structural work inspected per the approved accessory building permit
See the full Unincorporated Nez Perce County inspection guide — scheduling & re-inspection fees →
Tips
- Nez Perce County has no dedicated solar permit or fee — expect to be routed through the general Accessory Building Permit process, with the fee schedule's contract-amount fallback applying since no per-square-foot solar category is published.
- Call Building Services (208-799-3197) directly before applying to confirm exactly which permit category (Accessory Building, Mechanical, or Building Permit) the department will use for your specific installation, since the published permit-type list does not name solar explicitly.
- Budget for a separate Idaho DOPL Electrical Permit for the interconnection wiring, following the same statewide pattern as other Idaho counties, even though this was not independently confirmed on Nez Perce County's own site.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Nez Perce County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Nez Perce County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated Nez Perce County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated Nez Perce County lands. Privacy.
Other permits in Unincorporated Nez Perce County
Solar PV Permit in other cities
Compare solar pv permit fees across Idaho →
Look up this fee in a different city →