Unincorporated Power County building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Power County, Idaho.
Verified 2026-07-08 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- 73 Fort Hall Ave., Ste. A, American Falls, ID 83211
- Phone
- 208-226-7625
- Office hours
- Mon–Fri 8:00 AM – 5:00 PM
- Website
- Official site
Published scheduling rules
- Schedule inspection through the DOPL electrical inspection request line/portal; Power County is served by a state-assigned electrical inspector, not a county inspector (EV Charger / EVSE Permit)
Inspection sequence
Applies to: Residential Building Permit (New Construction / Addition)
- 1
Footing
After excavation for footings is complete and any required reinforcing steel is in place
- 2
Foundation
Once forms, reinforcing steel, and materials are on-site; all components must be ready before inspection for concrete foundations
- 3
Concrete Slab / Under-Floor
After all in-slab or under-floor building service equipment, conduit, piping accessories, and other ancillary equipment items are in place, but before any concrete is placed
- 4
Frame
After the roof, all framing, fire-blocking, and bracing are in, and all pipes, electric, and ducts are approved
- 5
Lath / Gypsum Board
After all lathing and/or gypsum board joints and fasteners are in place, but before it is taped and finished
- 6
Final
After finish grade and building is completed and ready for occupancy
Applies to: Solar PV Permit
- 1
Building Department Final Inspection
Mounting/structural work inspected per the approved building permit
- 2
State Electrical Inspection (DOPL)
Performed by Idaho DOPL, not the county — verifies wiring, combiners, disconnects, and point of connection
Final inspection only: Agricultural Structure Permit (Zoning Permit + Ag Certification), EV Charger / EVSE Permit
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Power County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Power County building permits
Get alerts for Unincorporated Power County
We'll email you when Unincorporated Power County's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.