Unincorporated Power County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Power County, Idaho.

Last verified 2026-08-02 · Source · Embed this page’s badge · Version history

Building department

Address
73 Fort Hall Ave., Ste. A, American Falls, ID 83211
Phone
208-226-7625
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Inspection guide

See how inspections work in Unincorporated Power County — sequence, scheduling & re-inspection fees.

Codes adopted

Idaho adopts a statewide baseline building code set under the Idaho Building Code Act (Idaho Code Title 39, Chapter 41) and IDAPA rules administered by the Idaho Division of Occupational and Professional Licenses (DOPL). Effective January 1, 2021, the statewide baseline includes the 2018 International Building Code (IBC), 2020 Idaho Residential Code (based on the 2018 IRC Parts I–III and IX with Idaho amendments), 2020 Idaho Energy Conservation Code (based on the 2018 IECC with Idaho amendments), 2018 International Existing Building Code (IEBC), 2018 International Mechanical Code (IMC), 2018 International Fuel Gas Code (IFGC), and 2018 International Fire Code (IFC). The National Electrical Code is adopted separately by the Idaho Electrical Board (IDAPA 24.39.10), not bundled with the building code: Idaho enforces the 2023 NEC, effective July 1, 2024 (the state used the 2017 NEC with amendments before that and skipped the 2020 edition). Local jurisdictions must enforce the state baseline and may adopt amendments only where those amendments are at least as stringent as the state-adopted editions; local amendments may not be less restrictive. Enforcement is local — each city or county issues permits and performs inspections. Always confirm the current adopted edition and any local amendments with your specific jurisdiction before submitting plans.

  • 2018 International Building Code (IBC) — adopted per Ord. 2017-03 (12-18-2017), amended to the 2018 edition and further amended by Ord. 2020-03 (9-14-2020); codified as Power County Code section 8-1-13, with local amendments at section 8-1-13-1
  • 2018 International Residential Code (IRC) — same adoption/amendment history (Ord. 2017-03; amd. Ord. 2020-03); parts I, II, III, IV, and IX, plus appendix G (swimming pools/spas/hot tubs), appendix H (patio covers), and accessibility appendices
  • 2018 International Energy Conservation Code (IECC) — same Ord. 2017-03/2020-03 adoption
  • 2018 International Fire Code (IFC) — same Ord. 2017-03/2020-03 adoption
  • 2018 International Existing Building Code (IEBC) — same Ord. 2017-03/2020-03 adoption
  • Per the live American Legal Publishing code page (codelibrary.amlegal.com/codes/powercountyid/latest/powercounty_id/0-0-0-1494, current version '2026 S-5'), section 8-1-13 explicitly lists all five codes at the 2018 edition, adopted by Ord. Show full text

    Per the live American Legal Publishing code page (codelibrary.amlegal.com/codes/powercountyid/latest/powercounty_id/0-0-0-1494, current version '2026 S-5'), section 8-1-13 explicitly lists all five codes at the 2018 edition, adopted by Ord. 2017-03 (12-18-2017) and amended by Ord. 2020-03 (9-14-2020). An archived 2018-recorded ordinance PDF citing 2015 IBC/IECC/IFC/IEBC and 2012 IRC editions is superseded; that ordinance is no longer hosted at its original live powercounty.us URL.

Permit types & fees

Unincorporated Power County's permit history isn't searchable here yet

This page covers what the permit requires. What we don't have for Unincorporated Power County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

Your email, and the place — never an address. We only use it to tell you when Unincorporated Power County lands. Privacy.

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-07)
0units

0 buildings · $0 valuation

Trailing 12 months
3units

12 of 12 months reported · #56 in Idaho coverage by units

Year to date (2026 YTD through 2026-07)
2units

2 buildings · $530,000 valuation

Full year 2025
5units

5 buildings · $1.7M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include incorporated cities (American Falls, Rockland)

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Idaho building activity

Tips & gotchas

  • Power County shares one Consolidated Building-Development Permit Application with the City of American Falls and the City of Rockland — always check 'Power County' as the work location on the form when the project is in the unincorporated area.
  • Power County does NOT issue electrical, plumbing, or HVAC/mechanical permits. These are regulated solely by the State of Idaho (IC 54-1001, IC 54-2601) — obtain them from the Idaho Division of Occupational and Professional Licenses (DOPL) (DOPL/DBS) at dopl.idaho.gov/permits or 1-800-955-3044.
  • A Power County Highway Permit (208-226-2661) and, where applicable, a septic permit from the State Health District (208-226-5094 or 208-478-6320) are prerequisites — secure these before submitting the building permit application.
  • Standard review is 10-14 days; re-roofing, re-siding, and sign permits can be issued same-day with complete information.
  • Permits lapse after 180 days; extensions require verified active work and meeting county criteria.
  • Starting work before a permit is issued triggers an investigative fee equal to the permit fee, in addition to the permit fee itself.
  • 80% of the building permit fee is refundable if no work has begun, but you must request the refund within 30 days of paying the fee.
  • Design criteria apply county-wide: 32-inch frost depth, 90 mph wind speed, Seismic Zone D-1, Climate Zone 5, and an elevation-based snow load table ranging from 35 lb (below 4,600 ft) to 100 lb ground load / 125 lb roof live load (6,800+ ft).
  • Six inspections are mandatory in sequence: Footing, Foundation, Concrete Slab/Under-Floor, Frame, Lath/Gypsum Board, and Final. Contact the Building Administrator to schedule each one before proceeding to the next phase.
  • Agricultural buildings need a notarized Agricultural Building Certification Statement that gets recorded against the property title — it only applies to structures used exclusively for farm implements/hay/grain/poultry/livestock storage, not habitation or public/commercial use.
  • Power County's building code ordinance (originally adopted 2017, recorded 2018) amended all five codes to the 2018 edition by Ord. 2020-03 (9-14-2020), per the live American Legal Publishing code library page. See codesAdopted above for the editions and citation.
  • There is no separate 'commercial building permit' or 'tenant improvement permit' product in unincorporated Power County — new commercial construction, additions, and remodels/TI all route through the same Building Permit and Consolidated Building-Development Permit Application as residential work, governed by the 2018 IBC. A tenant-space remodel that doesn't change occupant load/occupancy group/occupancy classification can get a Certificate of Completion instead of a full Certificate of Occupancy (IBC section 111.1.1, locally added by Ord. 2020-03) — see the Commercial Building Permit entry above.
  • The Building Administrator/Planning and Zoning office is located at 73 Fort Hall Ave., Ste. A, American Falls, ID 83211 (mailing/general county address also cited as 543 Bannock Ave.). Hours: Mon-Fri 8:00 AM - 5:00 PM. Phone: 208-226-7625.

Comparable nearby cities

American Falls
Both in Power County3 shared permit types
Compare fees →