EV Charger / EVSE Permit — Unincorporated Power County, Idaho · Requirements sheet
Verified 2026-07-20 · Source: https://dopl.idaho.gov/ele/ele-permits-and-inspections/
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Unincorporated Power County, Idaho
Power County's adopted Building Code Ordinance (Title 8) lists only the IBC, IRC, IECC, IFC, and IEBC — no county-adopted NEC edition — and the state's own Inspector List with Schedules assigns Power County electrical inspections to a State of Idaho electrical inspector (Shane Lott), confirming that electrical work in unincorporated Power County is regulated by the Idaho Division of Occupational and Professional Licenses (DOPL, formerly Division of Building Safety), not the county. An EV charger/EVSE installation therefore requires a State of Idaho Electrical Permit through DOPL, not a county permit. DOPL publishes no distinct EV charger/EVSE fee line; a residential EVSE circuit added to an existing home is billed under the homeowner (or contractor) electrical permit fee structure — a base fee plus a per-branch-circuit charge for existing-residence work.
Verified 2026-07-20 · Source
When you need this permit
- State of Idaho Electrical Permit (DOPL) required for EV charger/EVSE circuit installation in unincorporated Power County — apply online via the DOPL permit purchasing system, or by submitting the Homeowner or Contractor Electrical Permit Application
- Homeowners may self-perform EVSE wiring on their own primary or secondary residence and related outbuildings using a Homeowner Electrical Permit; work for others, or on commercial property, requires a licensed contractor Owner-builderContractor
- Installation must comply with the National Electrical Code edition adopted by the Idaho Electrical Board
- Schedule inspection through the DOPL electrical inspection request line/portal; Power County is served by a state-assigned electrical inspector, not a county inspector
- No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform was found published by DOPL as of this review
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Electrical Inspection
EVSE circuit, breaker, disconnect, and equipment mounting inspected by the DOPL-assigned state electrical inspector for Power County
See the full Unincorporated Power County inspection guide — scheduling & re-inspection fees →
Tips
- Power County has no county-adopted NEC edition and no county electrical permit — EV charger/EVSE installations go through Idaho DOPL, the same state process used for all electrical work here, not the county Building Administrator's office.
- Homeowners installing an EV charger on their own primary or secondary residence can self-permit for $65 plus $10 per branch circuit, without hiring a licensed electrician, per DOPL's homeowner electrical permit program. Contractor
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Power County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Power County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Idaho →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Power County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Power County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →