Manufactured Home Permit in Unincorporated Valley County, Idaho

Required for placement of new or used manufactured/mobile homes on land in unincorporated Valley County, whether set on blocks or on a permanent perimeter concrete or all-weather wood foundation. Processed through the same Building Permit Application and Valley County Building Department review pipeline as other building permits.

Reviewed 2026-07-13 · Source

When you need this permit

  • For new manufactured/mobile homes built after 1976: foundation plan and cross-section drawings (full perimeter concrete, all-weather wood, or block foundation) including marriage-line detail for multi-section homes and blocking/tie-down criteria
  • Foundation and standard-set plans must comply with current Idaho Manufactured Home Installation Standards
  • Stairway and landing detail drawings per current adopted codes; complete construction plans and an additional fee required for added decks, entries, or snow roofs
  • Elevation drawing for each side of the home; floor plan with room occupancy identification and roof snow loading
  • Home and foundation must be placed by an Idaho-licensed installer or by the homeowner; Vehicle Identification Number (VIN) provided upon request
  • For pre-1976 mobile homes: a certificate from the Idaho Division of Building Safety is required prior to building permit issuance
  • Home must be purchased/rated for the live snow load design required for its specific site (120 psf or 150 psf depending on location); used homes must meet snow loading or have a compliant snow roof built to current county code
  • Snow roofs, decks, entries, and other additions require a separate permit and must be freestanding, not relying on the manufactured home for structural support
  • Electrical, plumbing, and HVAC must be signed off by State (DOPL) inspectors before the county can final the home

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Manufactured Home — Single-Wide (set fee)Valley County Building Department Fees (Revised 11/12/2025)
$150.00
Manufactured Home — Double Plus (per additional section)
$50.00 per additional section
Permanent Perimeter Foundation
$5.00 per foot
Plan Review FeeAdded to all permits per Valley County's fee schedule
35% of the building permit fee (in-house) or greater of 65% / actual outside-consultant cost

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Valley County building department
~0–20 business days

How long did your Manufactured Home Permit permit actually take in Unincorporated Valley County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Excavation

    Required for both permanent-set and standard/block-set manufactured homes

  2. 2

    Footing / Foundation

    Required for permanent-set (perimeter concrete or all-weather wood foundation) manufactured homes

  3. 3

    Final

    Electrical, plumbing, and HVAC must be signed off by State DOPL inspectors before the county can final the home; required for both permanent-set and standard-set homes

See the full Unincorporated Valley County inspection guide — scheduling & re-inspection fees →

Tips

  • Standard (block) sets require fewer inspections (excavation and final only) than permanent-set homes (excavation, footing, foundation, and final).
  • Confirm the required live snow load rating for your specific site (120 psf or 150 psf) with the Building Department before purchasing — a used home not rated for the site's snow load must have a compliant, freestanding snow roof built to current county code.
  • Any deck, entry, porch, or snow roof attached to the home requires its own separate permit and must be freestanding, not relying on the manufactured home for structural support.

Frequently asked questions

Yes. Manufactured home placement uses the same Building Permit Application as other structures but with its own fee: $150.00 set fee for a single-wide (plus $50.00 per additional section for multi-section homes), plus $5.00/foot if a permanent perimeter foundation is used, plus the standard plan review fee. Source: Valley County Building Department Fees (Revised 11/12/2025) and Building Permit Application Information and Instructions (Rev. 5/20/2026), p.6.

In Unincorporated Valley County, the published Manufactured Home — Single-Wide (set fee) is: $150.00. Additional published fees: Manufactured Home — Double Plus (per additional section) — $50.00 per additional section; Permanent Perimeter Foundation — $5.00 per foot; Plan Review Fee — 35% of the building permit fee (in-house) or greater of 65% / actual outside-consultant cost. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a manufactured home permit in Unincorporated Valley County typically runs 0–20 business days. This is an estimate, not a published figure — confirm current review times with Valley County Building Department at 208-382-7114.

You'll need: Building Permit Application; Foundation Plan and Cross-Section Drawings; Elevation and Floor Plan Drawings. Depending on your project, Unincorporated Valley County may also ask for: Idaho Division of Building Safety Certificate. See the required-documents checklist on this page for details on each.

Unincorporated Valley County requires 3 inspection(s) for a manufactured home permit, in order: Excavation, Footing / Foundation, Final. Schedule each through Valley County Building Department (208-382-7114).

Apply through Valley County Building Department at 700 S. Main Street, PO Box 1350, Cascade, ID 83611. Phone: 208-382-7114, email: building@valleycountyid.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM (inspectors available for public assistance 8:00–10:00 AM; remainder of day governed by daily inspection schedule; after-hours/weekend calls go to voicemail). Official information: https://www.co.valley.id.us/departments/Building.

Unincorporated Valley County, Idaho has adopted: 2018 International Residential Code (IRC) — adopted effective January 1, 2021; 2018 International Building Code (IBC) — adopted effective January 1, 2021; 2018 International Energy Conservation Code (IECC) — adopted effective January 1, 2021; Valley County Code Title 6 — Building Codes, Regulations & Permits; Valley County Ordinance # 05-02 — Outdoor Lighting Ordinance; Valley County Ordinance # 6-1-9 — sanitary sewer/septic evidence requirement for habitable buildings; Valley County Flood Damage Prevention Ordinance (FIRM-mapped flood-prone areas); Valley County Best Management Practices (BMP) Ordinance — erosion/sediment control, required before excavation in Riparian Overlay areas. Local amendments apply — see the Unincorporated Valley County overview page for the full list.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-07-13.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Valley County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.