Residential Building Permit (New Construction / Addition / Alteration) in Unincorporated Valley County, Idaho
Required for new single-family residences, additions, alterations, repairs, manufactured/modular homes, moved structures, tiny homes, and most other structures on land in unincorporated Valley County (outside Cascade, Donnelly, McCall, and McCall's Area of Impact). Valley County Building Department reviews plans and performs all inspections directly for this territory. Applications are submitted by mail or drop-off at the Cascade office — not currently accepted by email.
Reviewed 2026-07-13 · Source
When you need this permit
- Completed Building Permit Application (numbered fields 1-17), signed by the property owner even if a contractor or authorized agent prepares it — no permit issued without owner signature (since November 7, 2022)
- All construction plans stamped by an Idaho-licensed engineer or architect, drawn to scale on 18x24" or 24x36" sheets only, 2 copies
- Structural engineering calculations with Idaho stamp, 2 copies — required on all plans since July 15, 2019
- REScheck energy compliance report (only required if plans do not reference the 2018 IECC/IRC climate zone 6 table directly)
- Fully dimensioned site plan, 2 copies, showing existing/proposed structures, well and septic locations, driveway alignment/grade/drainage, property lines, easements, and waterways
- Site plan showing outdoor lighting locations, type, and height per Ordinance #05-02
- Completed Road Department driveway permit for any new driveway off a public road (not required for private-road access)
- Evidence of septic/sanitary sewer approval (Central District Health or Northlake Recreational Sewer & Water District) for any habitable structure per Ordinance #6-1-9 — permit processing may begin before the septic permit is issued, but the building permit will not be issued until septic approval is received
- HOA/Architectural Review Committee approval, 1 copy, only if the property is in an active subdivision with a governing HOA/ARC
- FAA Form 7460-1 approval if the site is not exempt per the FAA's online prescreen tool
- Contractor registration number required before construction begins if a contractor performs the work Contractor
- Development Impact Fee collected at application if the property falls within the Cascade, Donnelly, or McCall Rural Fire Protection District
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 5 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Excavation / Soils
Valley County requires a soil/site inspection before placing forms for footings; required for all projects
- 2
Footing / Hole / Columns / Pads
After forms are set and reinforcing is tied in place, before placing concrete; property lines must be clearly marked. Pole structures require hole inspections; masonry inspections also required if applicable.
- 3
Foundation / Wall
After forms and reinforcing materials are in place but before placing concrete
- 4
Roof and Wall Sheathing
Before house wrap or siding is placed; wall and roof nailing pattern is checked
- 5
Frame
After roof/wall sheathing, all framing, fire blocking, bracing, draft stops, and resistive weather barrier are in place on exterior walls (no siding yet), and all electrical/plumbing/heating/gas pipes, chimneys, and vents are complete. Required before insulation and after state inspectors have signed off electrical/plumbing/HVAC rough-ins. Truss manufacturer specifications must be provided if engineered trusses are used.
- 6
Wood-Stove Insert (if applicable)
Required only for wood-stove insert installations, permitted and inspected directly by Valley County
- 7
Insulation
Before the interior is covered; insulation installer must certify type, manufacturer, and R-value of insulation installed in each thermal envelope element per 2018 IECC Sec. N1101.16
- 8
Final
After all code-related work is complete and before occupancy. Electrical, plumbing, and HVAC final inspections (performed by state DOPL inspectors) must be complete and approved before the Building Department will conduct its final. Propane tank installations require sign-off from the local fire department (Cascade, Donnelly, or McCall Fire, depending on district) before final/certificate of occupancy. Carpet, linoleum, and paint need not be complete before this inspection.
See the full Unincorporated Valley County inspection guide — scheduling & re-inspection fees →
Tips
- Applications are not currently accepted by email — mail to PO Box 1350, Cascade, ID 83611 or drop off at 700 S. Main Street, Cascade. If scanning for another purpose, submit a clean scan, not a photo — photos are not accepted for any document requiring legibility review.
- Electrical, plumbing, and HVAC/mechanical permits are issued and inspected by the Idaho Division of Occupational and Professional Licenses (DOPL), not Valley County. Obtain them at dopl.idaho.gov or 208-334-3233. The sole exception is wood-stove inserts, which Valley County itself permits and inspects for $65.
- Snow load varies by location: 120 psf for most of unincorporated Valley County, but 150 psf for the West Mountain area (Blackhawk south through and including Smith Ferry) and McCall-area sites. Confirm the exact site load with the Building Department before engineering begins.
- Valuation for the permit fee is based on the completed structure's value (not construction cost) using the county's per-square-foot Class 5-8 table (e.g., Class 5 new residential = $60.00/sq ft, attached garage = $26.40/sq ft, detached garage = $32.40/sq ft, finished basement = $30.00/sq ft, open deck = $7.68/sq ft) — land value is excluded.
- Development Impact Fees are collected only if the parcel falls within the Cascade, Donnelly, or McCall Rural Fire Protection District boundaries — not all unincorporated county land is inside one of these districts. Nonpayment delays permit issuance.
- Give at least 24 hours' notice for all inspection requests, made by phone to the office (not left in the field) — have the permit number, owner's name as shown on the application, and physical address ready.
- A re-inspection fee of $50.00 is charged starting with the 3rd visit for the same inspection type.
- FAA Form 7460-1 review (if required by the FAA's online prescreen tool) can take up to 6 months — check at least 45 days before submitting the building permit application.
- Permits become null and void if work is not commenced within 180 days of issuance, or if suspended/abandoned for 365 days after commencing.
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-07-13.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Valley County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Valley County
Residential Building Permit (New Construction / Addition / Alteration) in other cities
Compare residential building permit (new construction / addition / alteration) fees across Idaho →
Look up this fee in a different city →
Now live
Build your Unincorporated Valley County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Valley County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →