Do I Need a Permit to Install an EV Charger in Montana?

EV charger installation permit requirements. Level 1 vs Level 2, panel capacity, and available rebates.

Level 2 (240V) chargers yes. Level 1 (120V plug-in) no.

Level 1 vs Level 2

Level 1 chargers plug into a standard 120V outlet and do not require a permit. Level 2 chargers require a dedicated 240V circuit (usually 40-50 amps) and always require an electrical permit. Level 2 is what most EV owners install for practical daily charging speeds.

Panel Capacity

A Level 2 EV charger draws 40A and requires a 50A breaker. Many older homes have 100A or 150A panels that may not have capacity. If your panel is full, you'll need a sub-panel or panel upgrade ($1,500-$3,000 additional). An electrician can do a load calculation to determine if your current panel can handle it.

Installation Location

Most home EV chargers are installed in the garage, near the electrical panel. Longer runs from the panel to the charger increase wire cost. Outdoor installations require a weatherproof-rated charger (NEMA 4 or 4X enclosure).

Rebates and Incentives

Many utilities offer rebates for residential EV charger installations. Federal tax credits may also apply. Check current programs with your utility before installation — rebates often require pre-approval and may have specific equipment requirements.

Level 2 chargers need an electrical permit ($40-$75). Fast approval, one inspection. Check for utility rebates first.

Permit fees by city in Montana

Verified from each city’s published fee schedule. Where a city has no separate fee listed for this project, open the city page for the current requirements and amount.

40 rows

Permit fees by city in Montana
Permit feeSource
Anaconda-Deer Lodge$200VerifiedElectrical Permit →
Belgrade$45 up to $500, plus 6% of the balance of the project costVerifiedElectrical Permit →
Billings$130.00VerifiedElectrical Permit →
BozemanDetermined based on contractor valuation of the project, subject to Building Division approval of the valuation, applied against Table CVerifiedElectric Only Permit →
Butte-Silver BowSet by the State of Montana Building Codes Program, not by Butte-Silver BowVerifiedElectrical Permit →
ChoteauSee city page for the current Residential Building Permit (New Construction / Addition / Alteration) feeResidential Building Permit (New Construction / Addition / Alteration) →
City of Deer Lodge$200VerifiedElectrical Permit →
ColstripSee city page for the current Residential Building Permit (New Construction / Addition / Alteration / Repair / Move) feeResidential Building Permit (New Construction / Addition / Alteration / Repair / Move) →
Columbia Falls$200.00VerifiedElectrical Permit →
ConradSee city page for the current Zoning and Building Permit (New Construction / Addition / Alteration / Repair) feeZoning and Building Permit (New Construction / Addition / Alteration / Repair) →
Cut Bank$23.50 (subject to the $100.00 minimum permit fee)Verifiedvia Residential Building Permit (New Construction / Addition / Alteration)Residential Building Permit (New Construction / Addition / Alteration) →
Darby$45 for the first $500 plus 6.0% of the balance of construction valueVerifiedElectrical Permit →
East Helena$200VerifiedElectrical Permit (State-Issued) →
ForsythSee city page for the current Residential Building Permit (New Construction / Addition / Alteration) feeResidential Building Permit (New Construction / Addition / Alteration) →
GlasgowSee city page for the current Residential Building Permit (New Construction / Addition / Alteration) feeResidential Building Permit (New Construction / Addition / Alteration) →
Great Falls$34.39VerifiedElectrical Permit →
Hamilton$45 for the first $500 plus 6.0% of the balance of construction costVerifiedElectrical Permit →
HardinSee city page for the current Residential Building Permit (New Construction / Addition / Alteration / Re-Roof) feeResidential Building Permit (New Construction / Addition / Alteration / Re-Roof) →
Havre$200VerifiedResidential Electrical Permit →
Helena$35.00VerifiedElectrical Permit →
Kalispell$200.00VerifiedElectrical Permit →
Laurel$200VerifiedResidential Electrical Permit (State-Issued) →
LewistownSee city page for the current Residential Building Permit (New Construction / Additions) feeResidential Building Permit (New Construction / Additions) →
Libby$24Verifiedvia Residential Building Permit (New Construction / Addition / Alteration / Repair)Residential Building Permit (New Construction / Addition / Alteration / Repair) →
Livingston$200VerifiedElectrical Permit (State-Issued) →
ManhattanSee city page for the current Electrical Permit feeElectrical Permit →
Miles CitySet by City of Miles City fee schedule adopted by council resolution under City Code § 5-4; specific dollar-valuation table not independently locatable as a standalone published document as of the last verificationVerifiedResidential Electrical Permit →
Missoula$361.00VerifiedResidential Electrical Permit →
Missoula County (Unincorporated)$378.00VerifiedElectrical Permit (ME) →
Polson$220.00VerifiedElectrical Permit →
Red LodgeSee city page for the current Residential Building Permit (New Construction / Addition / Alteration) feeResidential Building Permit (New Construction / Addition / Alteration) →
Ronan$35.00 for up to $1,999Verifiedvia Building Permit (New Construction / Addition / Alteration / Repair)Building Permit (New Construction / Addition / Alteration / Repair) →
Shelby$23.50Verifiedvia Building Permit (New Construction / Addition / Structural Alteration)Building Permit (New Construction / Addition / Structural Alteration) →
Sidney$200VerifiedElectrical Permit →
Stevensville$200.00VerifiedElectrical Permit →
Townsend$200VerifiedElectrical Permit (State-Issued) →
Troy$24Verifiedvia Residential Building Permit (New Construction / Addition / Alteration / Repair)Residential Building Permit (New Construction / Addition / Alteration / Repair) →
Unincorporated Yellowstone County$200VerifiedElectrical Permit →
West YellowstoneSee city page for the current Residential Building Permit (New Construction / Addition / Alteration / Repair) feeResidential Building Permit (New Construction / Addition / Alteration / Repair) →
WhitefishBased on a percentage of the estimated project cost/valuation, consistent with the City's general building-permit valuation-based fee methodology; a deposit is required at time of permit submittalVerifiedElectrical Permit (Trade Permit) →

See the national overview for this permit →