PermitBaseMountain West

Residential Building Permit (New Construction) in Livingston, Montana

Verified

Required for new single-family and two-family dwelling construction within Livingston city limits. Issued by the City of Livingston Building & Planning Department under its DLI-certified local Building program (2021 IBC/IRC editions, locally effective September 23, 2022). Application is a single paper/fillable form covering Residential, Commercial, Sign, Well, and Demolition work categories.

Verified 2026-07-03 · Source

From$23.50Building Permit Fee — Total Valuation $1.00 to $500.00 — see all 12 fees below

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building Permit Fee — Total Valuation $1.00 to $500.00$23.50City of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026), Building Fees table
Building Permit Fee — Total Valuation $500.01 to $2,000.00$23.50 for the first $500 plus $3.05 for each additional $100, or fraction thereof, to and including $2,000City of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026)
Building Permit Fee — Total Valuation $2,000.01 to $25,000.00$69.25 for the first $2,000 plus $14.00 for each additional $1,000, or fraction thereof, to and including $25,000City of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026)
Building Permit Fee — Total Valuation $25,000.01 to $50,000.00$391.25 for the first $25,000 plus $10.10 for each additional $1,000, or fraction thereof, to and including $50,000City of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026)
Building Permit Fee — Total Valuation $50,000.01 to $100,000.00$643.75 for the first $50,000 plus $7.00 for each additional $1,000, or fraction thereof, to and including $100,000City of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026)
Building Permit Fee — Total Valuation $100,000.01 to $500,000.00$993.75 for the first $100,000 plus $5.60 for each additional $1,000, or fraction thereof, to and including $500,000City of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026)
Building Permit Fee — Total Valuation $500,000.01 to $1,000,000.00$3,233.75 for the first $500,000 plus $4.75 for each additional $1,000, or fraction thereof, to and including $1,000,000City of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026)
Building Permit Fee — Total Valuation over $1,000,000.00$5,608.75 for the first $1,000,000 plus $3.65 for each additional $1,000, or fraction thereofCity of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026)
Plan Review Fee (projects over $15,000)65% of the Building Permit Fee as determined by the fee scheduleCity of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026) and City of Livingston Building Department page
Impact Fee — Residential/Single FamilyPolice $106 + Fire $966 + Transportation $1,852 + Parks $1,385 (per unit)City of Livingston Impact Fee Schedule (Exhibit A, 2021); additional Water/Sewer impact fees apply based on meter size where new service is initiated (e.g., 5/8-3/4 inch: $3,542 water + $4,506 sewer)
Inspections outside normal business hours (minimum charge 2 hours)Overtime rate + benefits of assistant building inspector (currently $53.89/hour)City of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026), Other Building Inspection Fees table
Inspections with no fee specifically indicated (minimum charge 1/2 hour)Overtime rate + benefits of assistant building inspector (currently $53.89/hour)City of Livingston Fee Schedule (Resolution 5181, approved 2/03/2026)

Review timeline

110 business days

Livingston’s published plan-review target

Inspection process

  1. 1

    Footing/Foundation

    Required before concrete pour; verified against the approved foundation plan per the adopted 2021 IBC/IRC. A list of required inspections is provided to the permit holder at issuance per the City's FAQ.

  2. 2

    Framing

    Structural framing verified against approved plans before walls are closed

  3. 3

    Final

    Completed work verified against approved plans prior to occupancy

Tips

Frequently asked questions

Does the City of Livingston issue electrical, plumbing, or HVAC permits?
No. Per the City of Livingston Building Department page: 'The City of Livingston does not issue permits or conduct inspections for electrical, plumbing, or HVAC work. These services are regulated at the state level.' Contact the Montana DLI Building Codes Bureau for those permits.
What procedures must be followed before a building permit is issued in Livingston?
Two complete sets of plans (site plan, cross-sections, elevations, foundation plan, floor plan) must be submitted with a completed Permit Application. Plans are reviewed, deficiencies noted and corrected, then the permit may be issued. Residential projects are charged both a plan review fee and a permit fee; commercial projects are charged only a permit fee, at a higher rate. Source: City of Livingston FAQs page.

Sources & verification

Verified against official sources. Last reviewed 2026-07-03.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Livingston building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Livingston

Residential Building Permit (New Construction) in other cities

Compare residential building permit (new construction) fees across Montana

Project checklist — coming soon

Describe your project once and get every permit, document, and fee it triggers in Livingston — in one checklist. Leave your email and we'll tell you when it's ready.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.