Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) — Wells, Nevada · Requirements sheet
Verified 2026-07-20 · Source: https://cityofwellsnv.com/wp-content/uploads/2023/06/Resolution-19-04-Building-Valuations-and-Building-Permit-Fees.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) in Wells, Nevada
The City of Wells has no dedicated solar-PV application, checklist, or fee line — the city publishes only the single universal 'Building, Electrical, Plumbing & Mechanical Permit' application (see building-permit), which covers Building, Electrical, Mechanical, Plumbing, and Foundation permit types for Commercial, Residential, and Manufactured Home projects, classified New/Addition/Remodel/Repair, with no separate 'Solar' or 'Photovoltaic' checkbox. A residential rooftop or ground-mount PV installation is filed on this same universal form (selecting Building and/or Electrical as applicable) and billed under the City's general Building Permit Fee and Electrical Permit Fee tables adopted by City Council Resolution No. 19-04 ('A Resolution Establishing Building Valuations and Amending Building Permit Fees Pursuant to Wells City Code, Title 4, Building Codes, Chapter 4, Section 4-1-4'), which by its own terms remains in force 'until further action taken by the Wells City Council to amend, delete or otherwise change the same.' The resolution is not linked from any current top-level Building Department page but remains hosted live at https://cityofwellsnv.com/wp-content/uploads/2023/06/Resolution-19-04-Building-Valuations-and-Building-Permit-Fees.pdf, unchanged from its 2023 and 2025 archived captures — i.e. current. No PV-specific line item exists within it, so a solar installation is billed under the same valuation-based Building Permit Fee table plus the Electrical Permit processing/unit fees, same as any other electrical work.
Verified 2026-07-20 · Source
When you need this permit
- File the same universal Building, Electrical, Plumbing & Mechanical Permit application used for all other permit types, selecting Building and/or Electrical as applicable to the solar installation scope
- Nevada State Contractors Board C-2g (Photovoltaic) subclassification is required statewide for solar installation contractors (a state licensing requirement, not a city-specific one)
- NV Energy interconnection approval is required statewide before a grid-tied system can be activated — this is separate from, and in addition to, the city's building/electrical permit
- Applicable special approvals identified on the universal application (Nevada State Fire Marshal, Nevada State Health, Fire Sprinklers, Engineering, Addressing, and/or Contract Plan Review) should be confirmed with the Building Department for a solar project specifically
- No adopted-code edition or review-timeline SLA is published for ANY permit type at the City of Wells (confirmed by exhaustive chase across the current website, WordPress uploads, and Wayback Machine CDX search of all archived cityofwellsnv.com URLs) — but the Building Permit Fee and Electrical Permit Fee ARE published, in City Council Resolution No. 19-04 (see fees below), which was not previously located
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
City of Wells Resolution No. 19-04, Table 5, Electrical Unit Fees items 5 and 9 — no PV/inverter-specific line item exists in the 2019 resolution, so the Building Department classifies a solar… Show full citationHide
City of Wells Resolution No. 19-04, Table 5, Electrical Unit Fees items 5 and 9 — no PV/inverter-specific line item exists in the 2019 resolution, so the Building Department classifies a solar installation's electrical equipment under whichever of these general categories fits at intakeReview timeline
Inspection process
Tips
- Wells has no distinct solar permit application or PV-specific fee line, but it DOES have a real, currently-live fee resolution (No. 19-04) covering the Building Permit Fee and Electrical Permit Fee that a solar installation is billed under — it just isn't linked from the Building Department's main page; it's only reachable via a direct wp-content URL.
- Nevada statewide requirements still apply regardless of city-level publication gaps: a Nevada State Contractors Board C-2g (Photovoltaic) licensed contractor and NV Energy interconnection approval are both required for a grid-tied residential system. Contractor
- No review-timeline SLA is published for any permit type — call the Building Department directly, (775) 752-3355, before applying to set expectations on turnaround.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Applications & forms
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Wells building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Wells's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Wells yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Wells lands. Privacy.
Other permits in Wells
Solar PV Installation (Building, Electrical, Plumbing & Mechanical Permit) in other cities
Look up this fee in a different city →
Now live
Build your Wells project checklist
Describe your project once and get every permit, document, and fee it triggers in Wells — in one checklist. Free, for any city and any number of projects.
Get started →