Unincorporated Davis County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Davis County, Utah.

Verified 2026-06-30 · Source

How to schedule

Inspections are requested through the building department below.

Address
61 South Main Street, Suite 304, Farmington, UT 84025
Phone
(801) 451-3278
Office hours
Mon–Fri 8:00 AM – 5:00 PM

Published scheduling rules

  • Inspections are conducted by Shums Coda Associates. Schedule at least 24 hours in advance via email (ut@shumscoda.com) or phone (800-286-0374). (Residential Building Permit)
  • Inspections are conducted by Shums Coda Associates — schedule at least 24 hours in advance via email (ut@shumscoda.com) or phone (800-286-0374), same as for residential permits. (Commercial Building Permit)
  • Inspections are handled by Shums Coda Associates, not by county staff — schedule at least 24 hours in advance at ut@shumscoda.com or 800-286-0374. (General)

Inspection sequence

Applies to: Residential Building Permit

  1. 1

    Setback, Excavation & Forms, Footings

    Verify setbacks, excavation, formwork, and footing layout before concrete pour

  2. 2

    Foundation Reinforcing Steel / Fireplace Foundation

    Rebar and anchor bolts in foundation walls; fireplace foundation verification

  3. 3

    Underground Plumbing & Test / Underslab Ducts & Conduit

    All underground plumbing tested, underslab ducts and conduit in place before slab pour

  4. 4

    4-Way Rough (Framing, Mechanical, Electrical, Plumbing)

    After rough framing, rough mechanical, rough electrical, and rough plumbing — all must pass before insulation or wall cover

  5. 5

    Gas Line Air Test

    Gas piping pressure tested before wall cover

  6. 6

    Insulation

    Insulation installed, before drywall

  7. 7

    Lath or Drywall Nailing / Firewall (garage)

    Drywall nailing pattern and garage firewall verification

  8. 8

    Final

    All work complete — Final Electrical, Final Plumbing, Final Mechanical, Final Construction. Certificate of occupancy issued upon passing.

Applies to: Commercial Building Permit

  1. 1

    Setback, Excavation & Forms, Footings

    Verify setbacks, excavation, formwork, and footing layout before concrete pour.

  2. 2

    Foundation Reinforcing Steel

    Rebar and anchor bolts in foundation walls.

  3. 3

    4-Way Rough (Framing, Mechanical, Electrical, Plumbing)

    After rough framing, rough mechanical, rough electrical, and rough plumbing — all must pass before insulation or wall cover.

  4. 4

    Insulation

    Insulation installed, before drywall.

  5. 5

    Final

    All work complete — Final Electrical, Final Plumbing, Final Mechanical, Final Construction. Certificate of occupancy issued upon passing.

Applies to: Accessory Dwelling Unit (ADU)

  1. 1

    Foundation

    Footings, forms, rebar — before concrete pour

  2. 2

    4-Way Rough (Framing, MEP)

    Framing, fire separation between units, egress windows, and MEP rough-ins before walls closed

  3. 3

    Insulation

    Insulation and vapor barrier before drywall

  4. 4

    Final

    All work complete, smoke/CO detectors installed, address posted, ready for occupancy

Applies to: Basement Finish Permit

  1. 1

    Framing

    Wall framing, fire blocking, egress window wells and openings

  2. 2

    MEP Rough-In

    Electrical, plumbing, and HVAC rough-ins before walls closed

  3. 3

    Insulation

    Insulation on exterior walls, vapor barrier placement

  4. 4

    Final

    Drywall, fixtures, smoke/CO detectors, and all finishes complete

Applies to: Swimming Pool Permit

  1. 1

    Excavation/Steel

    Pool shell excavation, rebar, and plumbing before gunite/shotcrete

  2. 2

    Electrical/Bonding

    Pool bonding grid, equipment connections, GFCI protection per NEC Article 680

  3. 3

    Barrier

    Pool fence/barrier — minimum 48 inches high, self-closing/self-latching gates

  4. 4

    Final

    Pool complete, filled, equipment operational, all barriers in place

Applies to: Deck Permit

  1. 1

    Footings

    Verify footing depth (below frost line), diameter, and rebar before concrete pour

  2. 2

    Framing

    Posts, beams, joists, ledger connection, and hardware

  3. 3

    Final

    Decking, stairs, guards, and railings complete — 36-inch guard height required

Applies to: Fire Sprinkler and Fire Alarm System Permit

  1. 1

    Fire Alarm System Inspections (2 included)

    Two in-person inspections are included in the Fire Alarm System Permit fee; additional inspections billed at the same rate as the initial inspection.

  2. 2

    Fire Sprinkler System Inspections — flow, hydro, final (3 included)

    Three in-person inspections (flow test, hydrostatic test, and final) are included in the Fire Sprinkler System Permit fee across all square-footage tiers; additional inspections are $100.00 each.

  3. 3

    SDMF Suppression/Alarm Review Inspections (2 included each)

    In South Davis Metro Fire's service area, both the Suppression Review and Alarm Review fees each include 2 inspections. Final inspections will not be scheduled until SDMF's pre-check list is complete, per SDMF's Plan Review page.

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough Mechanical

    Ductwork and gas piping installed, before walls closed — verify clearances and support

  2. 2

    Gas Line Air Test

    Gas piping pressure tested (for gas appliances)

  3. 3

    Final Mechanical

    Equipment operational, combustion air verified, gas pressure tested, thermostat functional

Applies to: Plumbing Permit

  1. 1

    Underground Plumbing & Test

    Before slab/backfill — verify pipe slope, materials, and cleanouts

  2. 2

    Rough Plumbing & Test

    After pipes installed, before walls closed — pressure test required

  3. 3

    Final Plumbing

    All fixtures connected, water flowing, no leaks, proper venting verified

Applies to: Change of Use / Certificate of Occupancy

  1. 1

    Business License Inspection (health, building, zoning code conformance)

    License Deputies (who may include the County Building Inspector, Sheriff/Deputy Sheriffs, or Health Department staff) may inspect the licensed premises for health, building, and zoning code conformance, without prior notification, per County Code § 5.04.200.

  2. 2

    Building Permit Final Inspection (if construction/occupancy-classification change involved)

    If the change of use triggers a Commercial Building Permit or Tenant Improvement Permit, a Certificate of Occupancy is issued upon passing that permit's Final inspection -- see this file's separate building permit entries.

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Framing / Rough-In

    Wall framing and MEP rough-in inspection before wall cover.

  2. 2

    Final

    All finishes complete — Final Electrical, Final Plumbing, Final Mechanical, Final Construction, verified before occupancy.

Applies to: Demolition Permit

  1. 1

    Pre-Demolition

    Verify utility disconnects are complete and any required asbestos clearance is obtained before work begins

  2. 2

    Final / Site Clear

    Site cleared, foundation removed or capped, erosion control in place

Applies to: Electrical Permit

  1. 1

    Rough Electrical

    After wiring installed, before walls closed — verify box placement, wire sizing, proper support

  2. 2

    Final Electrical

    All devices installed, GFCI/AFCI protection verified, panel labeled

Applies to: Roofing Permit

  1. 1

    Deck/Substrate

    After tear-off — verify sheathing condition, replace damaged decking before proceeding

  2. 2

    Final

    Completed roof — verify ice and water shield, flashing, drip edge, ventilation, and nailing pattern

Applies to: Solar Panel Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final / Structural

    Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified

Final inspection only: EV Charger / EVSE Permit, Sign Permit

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Davis County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Unincorporated Davis County building permits

Get alerts for Unincorporated Davis County

We'll email you when Unincorporated Davis County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.