Electrical Permit in Unincorporated Davis County, Utah

Required for electrical work in Unincorporated Davis County. Davis County uses a unified building permit for all construction trades including electrical — a separate electrical-only permit is not listed; electrical scope is included in the building permit application. Simple electrical-only work such as panel upgrades and power-to-panel repairs use the minimum building permit fee. EV charger/EVSE installation is electrical work and falls under this general permit; neither the county's building permits page nor its fee schedule publish an EV-specific line item.

Verified 2026-07-01 · Source

When you need this permit

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or service changes
  • Power-to-panel repairs or upgrades
  • New meter installations
  • Generator or solar panel electrical connections
  • Any electrical work on gas, electrical, mechanical, or plumbing systems per Davis County Code § 15.01.330

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Power-to-Panel / Furnace / AC / New Meter (one inspection, no plan check, no bond)Grounded verbatim on the live Davis County Building Permits page (fetched 2026-07-01): 'Permits that require no plan check review, construction bond, and just one inspection; are the minimum $202. Examples of this include: furnaces & AC unit installations, power-to-panel repairs/upgrades, new meters, and any other item at the discretion of the Community & Economic Development Office.' The codified fee schedule PDF (§ 2.48.050, Ord. 4-2017) lists a $200.00 base minimum; the county's own current webpage publishes $202 as the applicable minimum for these no-plan-check/no-bond/one-inspection permits — treated as the current published figure. Source: daviscountyutah.gov/ced/planning/building-permits.
$202.00 minimum
Electrical scope included in building permit (new construction / major remodel)For projects that include electrical as part of a larger scope, include the electrical valuation in the total project valuation and apply the standard building permit fee table.
Valuation-based per the Davis County Building Permit Fee Schedule (§ 2.48.050, Ord. No. 4-2017)
Plan ReviewDavis County Code § 2.48.050(A), Ord. No. 4-2017. May not apply to simple one-inspection permits.
65% of the building permit fee, or actual cost, whichever is less

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Davis County building department
~1–10 business days

How long did your Electrical Permit permit actually take in Unincorporated Davis County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough Electrical

    After wiring installed, before walls closed — verify box placement, wire sizing, proper support

  2. 2

    Final Electrical

    All devices installed, GFCI/AFCI protection verified, panel labeled

See the full Unincorporated Davis County inspection guide — scheduling & re-inspection fees →

Tips

  • Davis County uses a unified building permit — for electrical-only work, apply for a building permit at daviscounty.portal.iworq.net and describe the electrical scope.
  • Simple work (power-to-panel upgrade, new meter) requires only one inspection and the minimum permit fee (~$202 per the county building page); no plan review or bond required.
  • All electrical work must comply with the 2023 NEC as adopted statewide by Utah Code § 15A-2-103(1)(g). Davis County's own page does not specify an NEC edition — the statewide 2023 NEC governs.
  • Utah allows homeowners to perform electrical work on their own primary residence but a permit and inspection are still required — use the Owner/Builder Certification Form. Owner-builder
  • A home EV charger install (power-to-panel style work, one inspection, no plan check) typically qualifies for the minimum ~$202 fee tier — the county does not publish a distinct EV-charger permit or fee.

Frequently asked questions

Yes. Davis County Code § 15.01.330 requires a permit for any work on electrical systems. Apply through the unified building permit at daviscounty.portal.iworq.net.

Simple electrical work (panel upgrade, power-to-panel, new meter) requiring no plan review and just one inspection uses the minimum fee — approximately $202 per the Davis County building permits page. Larger projects are valuation-based per County Code § 2.48.050 (Ord. 4-2017). Call (801) 451-3278 to confirm for your specific project.

Plan review for an electrical permit in Unincorporated Davis County typically runs 1–10 business days. This is an estimate, not a published figure — confirm current review times with Davis County Community & Economic Development — Planning & Zoning at (801) 451-3278.

You'll need: Building Permit Application (iworq). Depending on your project, Unincorporated Davis County may also ask for: Electrical Plan / Single-Line Diagram; Contractor DOPL License. See the required-documents checklist on this page for details on each.

Unincorporated Davis County requires 2 inspection(s) for an electrical permit, in order: Rough Electrical, Final Electrical. Schedule each through Davis County Community & Economic Development — Planning & Zoning ((801) 451-3278).

Apply through Davis County Community & Economic Development — Planning & Zoning at 61 South Main Street, Suite 304, Farmington, UT 84025. Phone: (801) 451-3278, email: planning@daviscountyutah.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM. Official information: https://www.daviscountyutah.gov/ced/planning/building-permits.

Unincorporated Davis County, Utah has adopted: 2024 International Building Code (IBC) — Utah Code § 15A-2-103(1)(a); effective July 1, 2026 (replaces 2021 IBC); 2021 International Residential Code (IRC) — Utah Code § 15A-2-103(1)(b); remains in force after July 1, 2026; 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); effective July 1, 2026 (replaces 2021 IPC); 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); effective July 1, 2026 (replaces 2021 IMC); 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); effective July 1, 2026 (replaces 2021 IFGC); 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force. NOTE: Davis County's own website does not list a specific NEC edition — the statewide 2023 NEC is the legally in-force edition.; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); effective July 1, 2026 (replaces 2021 IECC); Utah residential energy provisions effectively follow 2015 IECC residential; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); effective July 1, 2026 (replaces 2021 IEBC); 2024 International Swimming Pool and Spa Code (ISPSC), residential provisions — Utah Code § 15A-2-103(1)(n); effective July 1, 2026; NOTE: Through June 30, 2026, the 2021 editions of IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC are in force per Utah Code § 15A-2-103 (version effective through 6/30/2026). Local amendments apply — see the Unincorporated Davis County overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Davis County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.