Residential Building Permit — Unincorporated Davis County, Utah · Requirements sheet
Verified 2026-06-30 · Source: https://www.daviscountyutah.gov/ced/planning/building-permits
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Residential Building Permit in Unincorporated Davis County, Utah
Required for new residential construction, additions, structural alterations, and any work on gas, electrical, mechanical, or plumbing systems in Unincorporated Davis County. Per Davis County Code § 15.01.330, a permit is required for erection of any building or structure, any part thereof, or any alteration of any existing building that would permit the extension or enlargement of any use. All applications submitted through the Davis County online permit portal (iworq).
Verified 2026-06-30 · Source
When you need this permit
- New single-family home or multi-family construction
- Additions to existing structures
- Structural alterations (load-bearing wall removal, foundation changes)
- Accessory structures exceeding 200 square feet
- Any work on gas, electrical, mechanical, or plumbing systems (including furnace and AC unit installations)
- Basement finishes, pools, carports
- Any other work at the discretion of the Davis County Community & Economic Development Office
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 3 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Setback, Excavation & Forms, Footings
Verify setbacks, excavation, formwork, and footing layout before concrete pour
- 2
Foundation Reinforcing Steel / Fireplace Foundation
Rebar and anchor bolts in foundation walls; fireplace foundation verification
- 3
Underground Plumbing & Test / Underslab Ducts & Conduit
All underground plumbing tested, underslab ducts and conduit in place before slab pour
- 4
4-Way Rough (Framing, Mechanical, Electrical, Plumbing)
After rough framing, rough mechanical, rough electrical, and rough plumbing — all must pass before insulation or wall cover
- 5
Gas Line Air Test
Gas piping pressure tested before wall cover
- 6
Insulation
Insulation installed, before drywall
- 7
Lath or Drywall Nailing / Firewall (garage)
Drywall nailing pattern and garage firewall verification
- 8
Final
All work complete — Final Electrical, Final Plumbing, Final Mechanical, Final Construction. Certificate of occupancy issued upon passing.
See the full Unincorporated Davis County inspection guide — scheduling & re-inspection fees →
Tips
- Davis County uses a single building permit application for all construction types including electrical, plumbing, mechanical, and structural — submit one application through daviscounty.portal.iworq.net covering the full scope of work.
- Inspections are conducted by Shums Coda Associates. Schedule at least 24 hours in advance via email (ut@shumscoda.com) or phone (800-286-0374).
- If Davis County cannot complete a requested inspection within 3 business days, you may use a third-party inspector (Farmington City 801-451-2383, Kaysville City 801-544-1363, or Syracuse City 801-825-1477) — but you must notify Davis County before doing so (Utah Code § 15A-1-105).
- Valuation is the total combined cost of all work: foundation, structural and non-structural components, electrical, plumbing, mechanical, and interior finish materials including labor. Davis County uses the February 2021 ICC Building Valuation Data as a reference.
- A 2.5% credit card processing fee applies. Pay by check (mailed to 61 S Main St, Farmington UT 84025) or call (801) 451-3278 to avoid the surcharge.
- The statewide 2024 I-codes take effect July 1, 2026 — plans accepted for review before that date are reviewed under the codes in effect on submission date.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-30.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Davis County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Davis County
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Unincorporated Davis County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Davis County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →