Residential Building Permit in Unincorporated Davis County, Utah

Required for new residential construction, additions, and structural alterations in Unincorporated Davis County.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building Permit (valuation-based)$200 min (up to $7,500 valuation); $200 + $0.025/dollar over $7,500 (to $15k = $387.50 max); $387.50 + $0.0188/dollar over $15k (to $25k = $575.50 max); $575.50 + $0.0141/dollar over $25k (to $50k = $928 max); $928 + $0.0106/dollar over $50k (to $100k = $1,458 max); $1,458 + $0.008/dollar over $100k (to $250k = $2,658 max); $2,658 + $0.006/dollar over $250k (to $500k = $4,158 max); $4,158 + $0.0045/dollar over $500k (to $1M = $6,408 max); $6,408 + $0.0034/dollar over $1M (to $2M = $9,808 max); $9,808 + $0.0026/dollar over $2M (to $5M = $17,608 max); Over $5M: $17,608 min + $96/hr over 183 hrs
Plan Review65% of building permit fee (or actual cost, whichever is less)
Construction Bond (New Construction)$1,000 refundable on approved final inspection
State Surcharge1% of permit fee

Review timeline

~1021 business days

Typical estimate — confirm current times with the Unincorporated Davis County building department

Inspection process

  1. 1

    Foundation

    Before concrete pour — forms, rebar, anchor bolts

  2. 2

    Framing

    After framing, sheathing, and roof — before insulation

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete, ready for occupancy

Tips

Frequently asked questions

How much does a residential building permit cost in Unincorporated Davis County?
Davis County building permit fees are valuation-based: $200 minimum (up to $7,500 valuation), scaling up to $17,608+ for projects over $5M. Plan review is 65% of the permit fee. A $1,000 refundable construction bond is required for new construction. State surcharge of 1% applies.
How long does permit review take in Unincorporated Davis County?
Unincorporated Davis County does not publish a fixed plan-review turnaround. Across Utah jurisdictions, residential plan review typically runs about 2-4 weeks, but times vary with project scope and department workload — confirm current timelines with the Unincorporated Davis County building department before you submit.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-06-27.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Davis County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Unincorporated Davis County

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.