Skip to main content
PermitBase

Internal Accessory Dwelling Unit (IADU) Permit in Kanab, Utah

Permit for creating an Internal Accessory Dwelling Unit — an ADU located within the footprint of a primary single-family dwelling at the time it is created, intended for long-term rental. Billed under Kanab's Planning and Zoning fee schedule rather than the Building Inspection fee section.

Verified 2026-07-19 · Source

When you need this permit

  • Permitted only in the Residential R-1 Zone
  • Lot size must be greater than 6,000 square feet
  • One IADU maximum per lot
  • IADU must be located within the footprint of the primary dwelling unit at the time it is created
  • Rental period must be 30 consecutive days or longer (long-term rental only)
  • IADUs may be rented but not sold separately from the primary dwelling
  • Separate utility connections are not permitted; the lot owner is billed for two city utility connections regardless of a shared connection
  • An ADU permit application is required for all internal and external-attached ADUs

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Internal Accessory Dwelling Unit (IADU) PermitKanab City Adopted Consolidated Fee Schedule, Planning and Zoning fee section, p.4 of 5 — https://kanab.utah.gov/DocumentCenter/View/1995.
$50.00 flat fee

Review timeline

Plan review
Not published — contact the department

How long did your Internal Accessory Dwelling Unit (IADU) Permit permit actually take in Kanab?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    See the full Kanab inspection guide — scheduling & re-inspection fees →

    Tips

    • IADUs are restricted to the Residential R-1 Zone and to long-term rental (30+ consecutive days) — short-term/nightly rental of an IADU is not permitted under Kanab's ordinance.
    • An IADU does not get its own separate utility meter/connection; the property owner is billed for two city utility connections on a shared line.

    Frequently asked questions

    Kanab requires an internal accessory dwelling unit (iadu) permit for: Permitted only in the Residential R-1 Zone; Lot size must be greater than 6,000 square feet; One IADU maximum per lot; IADU must be located within the footprint of the primary dwelling unit at the time it is created; Rental period must be 30 consecutive days or longer (long-term rental only); IADUs may be rented but not sold separately from the primary dwelling; Separate utility connections are not permitted; the lot owner is billed for two city utility connections regardless of a shared connection; An ADU permit application is required for all internal and external-attached ADUs. If your project isn't listed, confirm with Kanab City Building Department at 435-644-2534 before starting work.

    In Kanab, the published Internal Accessory Dwelling Unit (IADU) Permit is: $50.00 flat fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Kanab does not publish a plan-review timeline for this permit. Contact Kanab City Building Department at 435-644-2534 for current turnaround.

    You'll need: ADU Permit Application (CityInspect). See the required-documents checklist on this page for details on each.

    Apply through Kanab City Building Department at Kanab City Office, 26 North 100 East, Kanab, UT 84741. Phone: 435-644-2534, email: building@kanab.utah.gov. Office hours: Monday - Thursday: 8:00 a.m. - 5:00 p.m.; Friday: 8:00 a.m. - 12:00 p.m.. Official information: https://kanab.utah.gov/2152/Building-Department.

    Kanab, Utah has adopted: 2024 International Building Code (IBC), including appendices C & J — effective July 1, 2026, per Kanab's Building Codes and Design Criteria page.; 2021 International Residential Code (IRC), including appendix AQ — effective July 1, 2026.; 2024 International Plumbing Code (IPC).; 2024 International Mechanical Code (IMC).; 2024 International Fuel Gas Code (IFGC).; 2023 National Electrical Code (NEC), issued by the NFPA.; 2024 International Energy Conservation Code (IECC).; 2024 International Existing Building Code (IEBC).; 2024 International Swimming Pool & Spa Code (residential).. Local amendments apply — see the Kanab overview page for the full list.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-19.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kanab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.