Internal Accessory Dwelling Unit (IADU) Permit — Kanab, Utah · Requirements sheet
Verified 2026-07-19 · Source: https://kanab.utah.gov/DocumentCenter/View/630/Chapter-04---Supplementary-Regulations
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Internal Accessory Dwelling Unit (IADU) Permit in Kanab, Utah
Permit for creating an Internal Accessory Dwelling Unit — an ADU located within the footprint of a primary single-family dwelling at the time it is created, intended for long-term rental. Billed under Kanab's Planning and Zoning fee schedule rather than the Building Inspection fee section.
Verified 2026-07-19 · Source
When you need this permit
- Permitted only in the Residential R-1 Zone
- Lot size must be greater than 6,000 square feet
- One IADU maximum per lot
- IADU must be located within the footprint of the primary dwelling unit at the time it is created
- Rental period must be 30 consecutive days or longer (long-term rental only)
- IADUs may be rented but not sold separately from the primary dwelling
- Separate utility connections are not permitted; the lot owner is billed for two city utility connections regardless of a shared connection
- An ADU permit application is required for all internal and external-attached ADUs
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
See the full Kanab inspection guide — scheduling & re-inspection fees →
Tips
- IADUs are restricted to the Residential R-1 Zone and to long-term rental (30+ consecutive days) — short-term/nightly rental of an IADU is not permitted under Kanab's ordinance.
- An IADU does not get its own separate utility meter/connection; the property owner is billed for two city utility connections on a shared line.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-19.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kanab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Kanab
Compare internal accessory dwelling unit (iadu) permit fees across Utah →
Look up this fee in a different city →
Now live
Build your Kanab project checklist
Describe your project once and get every permit, document, and fee it triggers in Kanab — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →