Solar / Solar-PV Installation Permit in Kanab, Utah
Kanab has no distinct solar or photovoltaic (PV) installation permit type or fee. A direct text search of the Kanab City Building Department page, all three Building FAQ entries (QID 179/182/183), the general Frequently Asked Questions page, Land Use Ordinance Chapter 4, the 2024 Adopted Consolidated Fee Schedule, and the July 2025 Consolidated Fee Schedule found zero mentions of 'solar' or 'photovoltaic' in any of them. Rooftop/ground-mount solar-PV installation, as electrical/construction work regulated by the city's adopted 2023 NEC and 2024 IBC, is understood to route through the same general Building Permit and CityInspect application documented elsewhere in this record, priced under the same ICC Building Valuation Data Tool formula (or, for smaller retrofit-scale installs on an existing structure, under the Renovation/Remodel line priced by number of required inspections) — no distinct solar fee has been published to confirm or contradict this.
Verified 2026-07-21 · Source
When you need this permit
- Installation of a rooftop or ground-mount solar photovoltaic (PV) system at a residential or commercial property within Kanab city limits
- Compliance with the city-adopted 2023 NEC (electrical) and 2024 IBC (structural/roof-mount attachment), per Kanab's Building Codes and Design Criteria page
- Complete application (see documents) submitted via the CityInspect online portal; review does not begin until the application is complete
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Kanab City FAQ QID=183 ("How much will my building permit cost?"); Show full citationHide
Kanab City FAQ QID=183 ("How much will my building permit cost?"); 2024 Adopted Consolidated Fee Schedule (https://kanab.utah.gov/DocumentCenter/View/1995) and the July 2025 Consolidated Fee Schedule (https://kanab.utah.gov/DocumentCenter/View/2118) — both fetched and searched directly 2026-07-21 — contain no distinct solar/photovoltaic fee line; solar-PV installation is valued and billed under this same general Building Permit fee formula. Note: the July 2025 schedule adds a new 'Residential Plan Review (1- & 2-Family Dwellings and Townhomes)' line at $150.00/unit not present in the 2024 schedule, which may also apply to a residential solar-PV permit submittal — confirm with the Building Department.Review timeline
Inspection process
- 1
Scheduled Inspection (Electrical / Structural)
Inspections require at least 24 hours' notice and are scheduled within 3 business days after the request is received. Scheduled by calling the Building Department at 435-644-2534. Kanab's own page does not itemize a solar-specific inspection checklist online as of 2026-07-21.
See the full Kanab inspection guide — scheduling & re-inspection fees →
Tips
- Kanab has no distinct solar/PV permit type or fee — the Building Department page, all Building FAQs, Land Use Ordinance Chapter 4, and both the 2024 and July 2025 Adopted Consolidated Fee Schedules contain zero mentions of 'solar' or 'photovoltaic.'
- Solar-PV installation is expected to route through the same general Building Permit and its ICC Building Valuation Data Tool fee formula (new-install-scale projects) or the Renovation/Remodel inspection-count-based fee (smaller retrofit-scale projects) as standard construction/electrical work; confirm directly with the Building Department (435-644-2534) before budgeting.
- The July 2025 Consolidated Fee Schedule adds a 'Residential Plan Review (1- & 2-Family Dwellings and Townhomes)' fee of $150.00/unit not present in the 2024 schedule — this may apply to a residential solar-PV submittal in addition to the general building permit fee; confirm with the Building Department.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-21.
Fee schedules
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kanab building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Property Access
Kanab's permit history is searchable by address
1 permits on record for Kanab, 2009–2009 — searchable by street address, with permit type, status, issued date and valuation where the city publishes them.
0% of Kanab's records carry a street address to match against, so a search that finds nothing here means we could not look — not that the property is clear.
Other permits in Kanab
Solar / Solar-PV Installation Permit in other cities
Compare solar / solar-pv installation permit fees across Utah →