Unincorporated Kane County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Kane County, Utah.

Verified 2026-07-08 · Source

How to schedule

Inspections are requested through the building department below.

Address
76 North Main Street, Kanab, UT 84741
Phone
(435) 644-4985
Office hours
Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 3:00 PM

Published scheduling rules

  • Kane County no longer accepts paper building permit applications — all submissions and inspection requests go through the Utah CityInspect portal (utah.cityinspect.com). (Residential Building Permit)
  • All Kane County Building Department applications and inspection requests are submitted online only via the Utah CityInspect portal — paper applications are no longer accepted. (General)

Inspection sequence

Applies to: Commercial Building Permit

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts against the PE-stamped engineered plans.

  2. 2

    Framing

    After framing and rough-in MEP, before insulation or wall cover.

  3. 3

    Insulation

    After insulation installed, before drywall.

  4. 4

    Final

    All work complete, ready for occupancy.

Applies to: Residential Building Permit

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts

  2. 2

    Framing

    After framing and rough-in MEP, before insulation or wall cover

  3. 3

    Insulation

    After insulation installed, before drywall

  4. 4

    Final

    All work complete, ready for occupancy — required before the $1,500 construction bond is refunded

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Framing / Structural

    Verified against the PE-stamped engineered plans before close-in, given Kane County's mandatory engineering requirement for remodels.

  2. 2

    Final

    All work complete, ready for occupancy.

Applies to: Solar PV / Solar Panel Installation Permit

  1. 1

    Electrical Inspection

    Verification of PV system wiring, disconnects, and grounding for NEC compliance, performed under the general Building Permit inspection process.

  2. 2

    Structural/Roof-Mount Inspection

    Verification of racking attachment and roof penetration flashing where a roof-mount system is installed.

Unincorporated Kane County building permits

Get alerts for Unincorporated Kane County

We'll email you when Unincorporated Kane County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.