How to schedule
Inspections are requested through the building department below.
- Address
- 76 North Main Street, Kanab, UT 84741
- Phone
- (435) 644-4985
- bldins@kane.utah.gov
- Office hours
- Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 3:00 PM
- Website
- Official site
Published scheduling rules
- Kane County no longer accepts paper building permit applications — all submissions and inspection requests go through the Utah CityInspect portal (utah.cityinspect.com). (Residential Building Permit)
- All Kane County Building Department applications and inspection requests are submitted online only via the Utah CityInspect portal — paper applications are no longer accepted. (General)
Inspection sequence
Applies to: Commercial Building Permit
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts against the PE-stamped engineered plans.
- 2
Framing
After framing and rough-in MEP, before insulation or wall cover.
- 3
Insulation
After insulation installed, before drywall.
- 4
Final
All work complete, ready for occupancy.
Applies to: Residential Building Permit
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Framing
After framing and rough-in MEP, before insulation or wall cover
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy — required before the $1,500 construction bond is refunded
Applies to: Commercial Tenant Improvement / Tenant Finish Permit
- 1
Framing / Structural
Verified against the PE-stamped engineered plans before close-in, given Kane County's mandatory engineering requirement for remodels.
- 2
Final
All work complete, ready for occupancy.
Applies to: Solar PV / Solar Panel Installation Permit
- 1
Electrical Inspection
Verification of PV system wiring, disconnects, and grounding for NEC compliance, performed under the general Building Permit inspection process.
- 2
Structural/Roof-Mount Inspection
Verification of racking attachment and roof penetration flashing where a roof-mount system is installed.
Final inspection only: EV Charger / EVSE Permit, Fire Sprinkler / Fire Alarm System Permit, Sign Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Kane County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Kane County building permits
Get alerts for Unincorporated Kane County
We'll email you when Unincorporated Kane County's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.