Unincorporated Kane County building permits

Verified

Department contacts, adopted codes, permit types, fees, and gotchas for Unincorporated Kane County, Utah.

Last verified 2026-07-08 · Source · Embed this page’s badge · Version history

Building department

Address
76 North Main Street, Kanab, UT 84741
Phone
(435) 644-4985
Office hours
Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 3:00 PM

Inspection guide

See how inspections work in Unincorporated Kane County — sequence, scheduling & re-inspection fees.

Codes adopted

Utah adopts construction codes statewide under Utah Code Title 15A (State Construction and Fire Codes Act), enforced by every jurisdiction. Chapter 4 of Title 15A codifies Legislature-enacted amendments for specific named jurisdictions (e.g., Park City, Salt Lake City, Sandy City) as part of the state construction code. Through June 30, 2026, the editions in force under Utah Code § 15A-2-103 are the 2021 IBC (with Appendices C and J), 2021 IRC, 2021 IPC, 2021 IMC, 2021 IFGC, 2021 IECC, 2021 IEBC, and 2021 ISPSC (residential provisions), together with the 2023 NEC. Effective July 1, 2026, § 15A-2-103 adopts the 2024 editions of the IBC, IPC, IMC, IFGC, IECC, IEBC, and ISPSC; the IRC remains the 2021 edition and the NEC remains the 2023 edition. Note: residential energy requirements are modified by statewide amendments, and several Utah jurisdictions document their residential energy provisions at the 2015 IECC level rather than the adopted IECC year — confirm the applicable residential energy code with your local jurisdiction. Always confirm the edition in force with your local jurisdiction.

  • 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); statewide effective 7/1/2026
  • 2021 International Residential Code (IRC), including Appendix AQ — Utah Code § 15A-2-103(1)(b)-(c)
  • 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); statewide effective 7/1/2026
  • 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); statewide effective 7/1/2026
  • 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); statewide effective 7/1/2026
  • 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force. NOTE: the Kane County Building Department webpage (last seen 2026-07-07) still lists '2020 NEC' and '2021 IBC/IPC/IMC' — that page has not been updated to reflect the current statewide codes; the versions listed here are the legally in-force editions per the Utah Legislature's current-version code text.
  • 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); statewide effective 7/1/2026
  • 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); statewide effective 7/1/2026
  • International Wildland-Urban Interface Code (IWUIC) — adopted per Utah Code § 15A-2-103; Kane County actively enforces this with a WUI-specific permit fee, Fire Hazard Severity Form, and Wildfire Mitigation Plan requirement given the county's extensive wildland-adjacent terrain near Zion National Park and Grand Staircase-Escalante National Monument

Permit types & fees

New residential construction activity

New privately-owned residential construction only

Housing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).

Latest month (2026-05)
6units

6 buildings · $3.6M valuation

Trailing 12 months
151units

12 of 12 months reported · #40 in Utah coverage by units

Year to date (2026 YTD through 2026-05)
43units

41 buildings · $18.9M valuation

Full year 2025
146units

127 buildings · $50.6M valuation

County-wide figures: BPS reports county-wide totals; jurisdiction is the unincorporated remainder — county totals include incorporated cities (Kanab, Orderville, Glendale, Alton, Big Water). Kanab City operates its own Building Department and issues its own permits (kanab.utah.gov/2152/Building-Department); it is NOT covered by this unincorporated-county file. However, per Utah Code Title 15A's fifth-class-jurisdiction requirement, Kanab has designated the Kane County Building Department as its statutorily-required third-party/backup inspection firm, contacted only if Kanab cannot provide an inspection within 3 business days of request (verified via Kanab's own FAQ, kanab.utah.gov/m/faq?cat=51#question-182).

Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-05 vintage. Census survey data — separate from the permit-requirements verification above. All Utah building activity

Tips & gotchas

  • Unincorporated Kane County land is outside Kanab, Orderville, Glendale, Alton, and Big Water — those towns are separately incorporated. Kanab City in particular runs its own full Building Department (kanab.utah.gov/2152/Building-Department, (435) 644-2534) and issues its own permits; Kane County Building Department is Kanab's statutorily required backup/third-party inspection firm only, engaged when Kanab can't inspect within 3 business days (verified: Kanab FAQ, kanab.utah.gov/m/faq?cat=51#question-182). Do not treat this unincorporated-county file as covering Kanab's own permitting process.
  • All Kane County Building Department applications and inspection requests are submitted online only via the Utah CityInspect portal — paper applications are no longer accepted.
  • Kane County's own Building Department webpage still lists 2021 IBC/IRC/IPC/IMC and 2020 NEC (as seen 2026-07-07), but the statewide in-force editions are 2024 IBC/IPC/IMC/IFGC/IECC/IEBC and 2023 NEC per Utah Code § 15A-2-103's current version — county web content lags the statutory update.
  • Structural design reference data (Kane County Building Department, Snowloads/Frost Depths/Risk Categories document): frost depth 18" in Kanab, 24" in Orderville/Deer Springs, up to 42" in Bryce Woodlands/Navajo Lakes; IRC wind speed 90 mph; IBC wind speed by risk category 105-120 mph; Seismic Zone D-0; Exposure C.
  • Kane County spans extensive wildland-urban interface terrain near Zion National Park and Grand Staircase-Escalante National Monument. The county enforces the International Wildland-Urban Interface Code with a dedicated WUI permit fee ($500 original permit, $300 per additional unit — Kane County Resolution No. R 2026-1), a Fire Hazard Severity Form (Appendix C), and a Sample Wildfire Mitigation Plan for qualifying projects.
  • New single-family homes require a $1,500 refundable construction bond, returned only after final occupancy is issued.
  • Kane County requires PE-stamped engineered plans for a broad set of conditions beyond the statewide minimum: all trusses, 70+ psf snow-load or non-prescriptive residences, all commercial projects, garages, swimming pools, fences over 7 feet, retaining walls over 4 feet, demolition, signs, remodels, and plumbing/electrical/bearing-wall-removal work — call (435) 644-4985 to confirm applicability before applying.
  • Building permits are valid 180 days from issuance; a one-time $15 extension (granting another 180 days) is available if construction has begun and at least one inspection occurred; full reinstatement after expiration costs $100; permits may be extended/renewed for a maximum of 6 consecutive years from original issuance (Kane County Code § 8-1-3, Ord. O-2023-18).
  • No dedicated ADU or short-term-rental permit category was found in Kane County's public building-permit materials as of this verification — accessory structures up to 200 sq ft (non-habitable, without electrical or plumbing) associated with a primary residence are called out separately in the county's permit-requirement FAQ but do not constitute a distinct ADU program. Confirm current zoning eligibility for ADUs or vacation-rental structures directly with the Kane County Building Department before assuming a specific permit path.