Residential Building Permit in Unincorporated Kane County, Utah
Required for new single-family dwelling construction, additions, and structural alterations in unincorporated Kane County — the area of the county outside Kanab, Orderville, Glendale, Alton, and Big Water, all of which are separately incorporated. The Kane County Building Department issues and reviews all unincorporated-county building permits online via the Utah CityInspect portal (paper applications are no longer accepted).
Verified 2026-07-08 · Source
When you need this permit
- New single-family dwelling construction
- Additions to existing residential structures
- Structural modifications or alterations
- Engineered/stamped plans required for trusses, 70+ psf snow-load or non-prescriptive designs, garages, and other conditions listed in Kane County's engineering-requirement FAQ
- Building permit application must meet the completeness requirements of Utah Code § 17-36-55(8)(a)-(g) or it will be rejected
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 6 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation / Footing
Before concrete pour — verify excavation, forms, rebar, and anchor bolts
- 2
Framing
After framing and rough-in MEP, before insulation or wall cover
- 3
Insulation
After insulation installed, before drywall
- 4
Final
All work complete, ready for occupancy — required before the $1,500 construction bond is refunded
See the full Unincorporated Kane County inspection guide — scheduling & re-inspection fees →
Tips
- Kane County no longer accepts paper building permit applications — all submissions and inspection requests go through the Utah CityInspect portal (utah.cityinspect.com).
- Utah Code § 17-36-55(3)(a) sets a 14-business-day statutory floor for a county to complete plan review of a one-to-two-family dwelling or townhome once a complete application is submitted; if the county misses this deadline, the applicant may request completion and the county must then finish within 14 additional days. Kane County's own materials do not publish a separate, shorter SLA, so this statutory timeline is the governing verified figure.
- A building permit application that does not meet the completeness requirements of Utah Code § 17-36-55(8)(a)-(g) (site plan, construction drawings, energy compliance documentation, structural calculations, contact information, etc.) will be rejected outright rather than reviewed.
- New single-family homes require a $1,500 refundable construction bond, returned only after final occupancy is issued.
- Kane County requires engineered, PE-stamped plans for a wide range of conditions beyond the state minimum — call (435) 644-4985 to confirm whether your project needs engineering before applying.
- Building permits are valid for 180 days from issuance; construction must begin within that window or the permit expires (Kane County Code § 8-1-3).
- Kane County spans significant wildland-urban interface terrain near Zion National Park and Grand Staircase-Escalante National Monument — the county actively enforces the International Wildland-Urban Interface Code with its own $500/$300 WUI permit fee, Fire Hazard Severity Form, and Sample Wildfire Mitigation Plan for projects in high-risk areas.
- Solar panel installation falls under this same permit — the Kane County Building Department FAQ (kane.utah.gov/faq.aspx?TID=17) lists 'Solar panel install' alongside water heater replacement, meter base installation, and electrical panel replacement as projects requiring a permit, but the county publishes no distinct solar-specific fee or process; the county's 2026 Schedule of Fees resolution (R 2026-1) is a scanned document without a machine-readable text layer, so a distinct solar fee line, if one exists, could not be confirmed.
- EV charger / EVSE installation is not listed on the Kane County Building Department FAQ (kane.utah.gov/faq.aspx?TID=17) or Building Department page (both re-checked 2026-07-20, no 'EV,' 'electric vehicle,' or 'charging station' entry found) — the FAQ lists 'meter base installation' and 'electrical panel replacement' among projects requiring a permit, so a standalone EV charging circuit would be expected to require the same valuation-based Building Permit Fee (ICC Current Valuation Data + 25% plan check fee) as other electrical work; as with solar, the county's scanned 2026 Schedule of Fees resolution (R 2026-1) could not be checked for a distinct EV fee line.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-08.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Kane County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Kane County
Residential Building Permit in other cities
Compare residential building permit fees across Utah →
Look up this fee in a different city →