Sign Permit in Unincorporated Kane County, Utah

Required for signs in unincorporated Kane County under Kane County Land Use Ordinance (KCLUO) Chapter 9-16 (Signs). Re-chased 2026-07-20: the full text of KCLUO 9-16-1 through 9-16-7 was located and read via the county's amlegal.com code library (a prior pass could not get past the JS-rendered shell). Per KCLUO 9-16-7(B)-(C), ALL sign permit applications — on-premises or off-premises — are filed on the county's standard building permit form and charged the standard valuation-based Building Permit Fee; off-premises signs (billboards) in Commercial and Manufacturing zones additionally require a Conditional Use Permit ($500 commercial application fee) before the building permit is issued, confirmed both by the ordinance text and by an actual approved billboard case (August 2023).

Verified 2026-07-20 · Source

When you need this permit

  • All signs must comply with KCLUO Chapter 9-16 (Signs), which regulates location, size, height, number, lighting, and type; the chapter's primary intent is signs of a commercial nature visible from a vehicular right-of-way — KCLUO 9-16-1
  • Several small/non-commercial sign types are exempt from Chapter 9-16 entirely: residential identification signs ≤4 sq ft, temporary window/wall sale signs, official traffic/government signs, noncommercial flags/pennants, temporary school/church event signs, signs permanently affixed to licensed vehicles, one nonilluminated real estate sign ≤6 sq ft (removed within 10 days of sale/rent/lease), election signs (removed within 7 days of the election), and yard/garage sale signs (removed within 1 week) — KCLUO 9-16-1(A)-(I)
  • Permit applications for a sign are filed on the county's standard building permit form with the Building Official — there is no separate 'sign permit' application form; the sign permit fee IS the standard valuation-based Building Permit Fee — KCLUO 9-16-7(B)-(C)
  • Off-premises signs (billboards) in Commercial (C) and Manufacturing (M) zones additionally require a Conditional Use Permit reviewed by the Kane County Planning Commission/Land Use Authority under KCLUO Chapter 15 before the building permit is issued — KCLUO 9-16-7(B); confirmed via an actual approved case: an 8'x16' (128 sq ft) off-premises billboard on a C-1 lot in the New Paria Subdivision, approved by staff recommendation August 23, 2023
  • Sign-by-zone dimensional table (KCLUO 9-16-5): in the C (Commercial) zone — off-premises sign max 128 sq ft / 25 ft height / 1 per parcel / 15 ft setback; on-premises ground or projecting sign max 56 sq ft / 25 ft height / 15 ft setback / 1 per parcel; window sign max 12 sq ft per use; wall sign max 25% of wall face; monument sign max 56 sq ft / 10 ft height / 10 ft setback (only if no ground/projecting sign used); roof and balloon signs require conditional use review. Construction signs (all zones): max 96 sq ft / 12 ft height, removed within 6 months of final inspection/full occupancy. Bed-and-breakfast signs: max 6 sq ft, no lights in residential zones. Subdivision entrance signs: max 6 ft height, no lights in residential zones. Signs are NOT PERMITTED in the R (Residential) zone at all
  • In the M (Manufacturing) zone, off-premises sign size scales with distance from the state right-of-way (20 sq ft at 0 ft up to 128 sq ft at 50+ ft, per a graduated table), with 500 ft minimum spacing between off-premises signs adjacent to an interstate — KCLUO 9-16-5
  • No sign may exceed 25 feet in height except as otherwise detailed by sign type in the 9-16-5 table — KCLUO 9-16-5
  • All signs must be constructed per the current federal/state/local/national electrical code adopted by Kane County; freestanding signs must be self-supporting (no swinging suspension); signs may not be installed closer than 36 inches horizontally or vertically from any overhead electrical conductor or guy-wire — KCLUO 9-16-6
  • Prohibited outright: abandoned signs, A-frame signs, snipe signs, signs on parked vehicles/trailers used primarily to display the sign, and obscene/indecent signs — KCLUO 9-16-4(F)
  • Kane County's own Building Department FAQ separately lists 'signs' among the project types requiring engineering (a licensed Utah PE stamp) outside prescriptive code paths
  • Signs along U.S. 89, State Road 9, U.S. 89A, and State Road 14 additionally require a UDOT permit under the Utah Outdoor Advertising Act after all Kane County approvals are obtained — KCLUO 9-16-2; the approved 2023 billboard case required an online UDOT application after county approval

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit Fee (= standard Building Permit Fee)KCLUO 9-16-7(C): 'All applications for permits filed with the building official shall be assessed a fee in accordance with the duly adopted building permit fee schedule of Kane County, which is based on the value of a structure.' There is no separate itemized 'sign permit' fee line — a sign permit is charged the same valuation-based Building Permit Fee documented on this file's Commercial/Residential Building Permit entries, sourced from the Kane County Building Department's own permit-application document.
Based on ICC Current Valuation Data plus a 25% plan check fee and a 1% state education fee
Conditional Use Permit — Commercial/Agricultural Application Fee (off-premises signs only)KCLUO 9-16-7(C): 'If a conditional use permit is also required, the fee required by section 9-15A-2C of this title shall also be assessed' — required specifically for off-premises signs/billboards in C and M zones. Kane County 2026 Schedule of Fees for County Services (Resolution No. R 2026-1, adopted January 27, 2026), 'Land Use Authority' / 'Land Use' section — page 3 of the fee schedule PDF (a scanned, non-text-layer document rendered to PNG and read visually), plus actual-cost engineering services with a $1,000 deposit where applicable.
$500.00
Conditional Use Permit — Residential Application FeeSame 2026 fee schedule (page 2). Listed for completeness — signs are not permitted at all in the R (Residential) zone per KCLUO 9-16-5, so this tier would not apply to a sign application.
$150.00

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit permit actually take in Unincorporated Kane County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Structural and Electrical Connection Inspection

    Per KCLUO 9-16-7(A), the building official or an authorized county employee inspects each sign and its structural and electrical connections for compliance with all duly adopted codes and ordinances.

See the full Unincorporated Kane County inspection guide — scheduling & re-inspection fees →

Tips

  • There is no separate 'sign permit' fee schedule in Kane County — per KCLUO 9-16-7(C), a sign permit is charged exactly like any other building permit: the standard ICC-valuation-based Building Permit Fee (plus 25% plan check and 1% state education fee). Budget accordingly rather than expecting a small flat sign fee.
  • Off-premises signs (billboards) are the only sign type requiring a separate Conditional Use Permit ($500 commercial application fee) on top of the building permit — required only in Commercial and Manufacturing zones; the Residential zone does not permit signs at all (KCLUO 9-16-5).
  • The full KCLUO Chapter 9-16 sign-by-zone dimensional table (9-16-5) is now confirmed directly from the county's amlegal.com code library — a prior research pass could not get past the site's JS-rendered shell with automated fetch tools; a real browser render was required.
  • Signs are separately listed on the Kane County Building Department's engineering-requirement FAQ, meaning even a straightforward sign project may need a licensed Utah PE stamp outside prescriptive code paths.

Frequently asked questions

Yes. Off-premises signs (billboards) in Commercial or Manufacturing zones require a Conditional Use Permit from the Kane County Planning Commission/Land Use Authority ($500 commercial application fee per the 2026 fee schedule) in addition to the standard building permit. Signs must meet KCLUO 9-16-5 zone standards — e.g., a Commercial-zone off-premises sign is capped at 128 sq ft, 25 ft height, 15 ft setback, 1 per parcel. Signs along certain state highways also need a UDOT Outdoor Advertising permit.

There is no separate fee schedule line item labeled 'sign permit.' Per KCLUO 9-16-7(C), a sign permit is charged the county's standard valuation-based Building Permit Fee (ICC valuation plus a 25% plan check fee and 1% state education fee) — the same as any other building permit. Off-premises signs (billboards) additionally require a $500 Conditional Use Permit application fee.

Unincorporated Kane County does not publish a plan-review timeline for this permit. Contact Kane County Building Department at (435) 644-4985 for current turnaround.

You'll need: Building Permit Application (standard county form); Site/Sign Plan. Depending on your project, Unincorporated Kane County may also ask for: Conditional Use Permit Application. See the required-documents checklist on this page for details on each.

Unincorporated Kane County requires 1 inspection(s) for a sign permit, in order: Structural and Electrical Connection Inspection. Schedule each through Kane County Building Department ((435) 644-4985).

Apply through Kane County Building Department at 76 North Main Street, Kanab, UT 84741. Phone: (435) 644-4985, email: bldins@kane.utah.gov. Office hours: Mon–Thu 8:00 AM – 5:00 PM, Fri 8:00 AM – 3:00 PM. Official information: https://kane.utah.gov/165/Building-Department.

Unincorporated Kane County, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — Utah Code § 15A-2-103(1)(a); statewide effective 7/1/2026; 2021 International Residential Code (IRC), including Appendix AQ — Utah Code § 15A-2-103(1)(b)-(c); 2024 International Plumbing Code (IPC) — Utah Code § 15A-2-103(1)(d); statewide effective 7/1/2026; 2024 International Mechanical Code (IMC) — Utah Code § 15A-2-103(1)(e); statewide effective 7/1/2026; 2024 International Fuel Gas Code (IFGC) — Utah Code § 15A-2-103(1)(f); statewide effective 7/1/2026; 2023 National Electrical Code (NEC) — Utah Code § 15A-2-103(1)(g); statewide in force. NOTE: the Kane County Building Department webpage (last seen 2026-07-07) still lists '2020 NEC' and '2021 IBC/IPC/IMC' — that page has not been updated to reflect the current statewide codes; the versions listed here are the legally in-force editions per the Utah Legislature's current-version code text.; 2024 International Energy Conservation Code (IECC) — Utah Code § 15A-2-103(1)(h); statewide effective 7/1/2026; 2024 International Existing Building Code (IEBC) — Utah Code § 15A-2-103(1)(i); statewide effective 7/1/2026; International Wildland-Urban Interface Code (IWUIC) — adopted per Utah Code § 15A-2-103; Kane County actively enforces this with a WUI-specific permit fee, Fire Hazard Severity Form, and Wildfire Mitigation Plan requirement given the county's extensive wildland-adjacent terrain near Zion National Park and Grand Staircase-Escalante National Monument. Local amendments apply — see the Unincorporated Kane County overview page for the full list.

Generally no — KCLUO 9-16-5 marks signs 'Not Permitted' in the R (Residential) zone, aside from the small exempt categories in 9-16-1 (e.g., a nonilluminated real estate sign under 6 sq ft, a residential identification sign under 4 sq ft, or a subdivision entrance sign under 6 ft tall).

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Kane County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.