Shed & Accessory Structure Permit in Draper, Utah

Required for detached garages, sheds, carports, and other accessory structures over 200 square feet in Draper.

Verified 2026-06-27 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Building PermitValuation-based per UBC Schedule
Plan Review100% of UBC Schedule
State Surcharge1% of permit fee

Review timeline

~514 business days

Typical estimate — confirm current times with the Draper building department

Inspection process

  1. 1

    Foundation

    Footings or slab prep before concrete pour

  2. 2

    Framing

    Structure framing, sheathing, and anchor connections

  3. 3

    Final

    Structure complete, roofing, siding, and any electrical or plumbing

Tips

Frequently asked questions

Do I need a permit for a shed in Draper?
It depends on size. Sheds under 200 sq ft and under 10 feet tall are typically exempt from building permits in Draper, but must still comply with setback requirements. Larger structures require a permit.
How close to the property line can I build a shed in Draper?
Accessory structures in Draper typically require a minimum 5-foot setback from side and rear property lines. Corner lots have additional restrictions. Always verify setbacks with Draper before building.

Sources & verification

Key facts verified against official sources. Last reviewed 2026-06-27.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Draper building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Draper

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.