How to schedule

Inspections are requested through the building department below.

Address
2549 Washington Boulevard, Suite 240, Ogden, UT 84401
Phone
(801) 629-8950
Office hours
Mon–Fri 8:00 AM – 5:00 PM (excluding holidays)

Published scheduling rules

  • Apply online at https://egselfservice.ogdencity.com (Residential category) or in person at 2549 Washington Blvd, Suite 220. Schedule inspections by calling (801) 629-8950. (Residential Building Permit)

Inspection sequence

Applies to: Residential Building Permit

  1. 1

    Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts

  2. 2

    Foundation

    Foundation walls before backfill

  3. 3

    Framing

    After framing, sheathing, and rough-in MEP — before insulation or wall cover

  4. 4

    Insulation

    After insulation installed, before drywall

  5. 5

    Final

    All work complete — address posted on site, approved plans on site, ladder available for attic/roof access, site open and accessible

Applies to: Accessory Dwelling Unit (ADU) Permit

  1. 1

    Foundation

    Footings, forms, rebar before concrete pour

  2. 2

    Framing

    Framing, fire separation, and egress verification

  3. 3

    MEP Rough-In

    Electrical, plumbing, and HVAC rough-ins before walls closed

  4. 4

    Final

    All work complete, certificate of occupancy issued

Applies to: Basement Finish Permit

  1. 1

    Framing

    Wall framing, fire blocking, egress window wells and openings

  2. 2

    MEP Rough-In

    Electrical, plumbing, and HVAC rough-ins before walls closed

  3. 3

    Insulation

    Insulation on exterior walls, vapor barrier placement

  4. 4

    Final

    Drywall, fixtures, smoke/CO detectors, and all finishes complete

Applies to: Commercial Building Permit

  1. 1

    Foundation / Footing

    Before concrete pour — verify excavation, forms, rebar, and anchor bolts; standard IBC inspection sequence.

  2. 2

    Structural / Framing

    Framing, floor and roof framing, and diaphragm connections verified against submitted structural calculations.

  3. 3

    MEP Rough-In

    Electrical, mechanical, and plumbing rough-in verified against submitted plans.

  4. 4

    Final

    All work complete — address posted on site, approved plans on site, site open and accessible.

Applies to: Commercial Tenant Improvement / Tenant Finish Permit

  1. 1

    Framing / Fire-Rated Assembly

    Wall construction and any fire-rated/occupancy separation assemblies verified before close-in.

  2. 2

    MEP Rough-In

    Electrical, mechanical, and plumbing rough-in verified against submitted plans.

  3. 3

    Final

    Exit signage, emergency lighting, and all finishes verified complete before occupancy.

Applies to: Deck Permit

  1. 1

    Footings

    Verify footing depth below frost line (30 inches per Ogden Design Criteria), diameter, and rebar before concrete pour

  2. 2

    Framing

    Posts, beams, joists, ledger connection, and hardware

  3. 3

    Final

    Decking, stairs, guards, and railings complete

Applies to: Electrical Permit

  1. 1

    Rough-In

    After wiring installed, before walls closed — verify box placement, wire sizing, proper support

  2. 2

    Service / Panel

    Panel installation, grounding electrode system, service entrance conductors

  3. 3

    Final

    All devices installed, GFCI/AFCI protection verified, panel labeled

Applies to: Plumbing Permit

  1. 1

    Underground / Slab

    Before concrete pour — verify pipe slope, materials, and cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed — pressure test required

  3. 3

    Final

    All fixtures connected, water flowing, no leaks, proper venting verified

Applies to: Demolition Permit

  1. 1

    Pre-Demolition

    Verify all utility clearances (power, gas, water) are obtained and any required asbestos clearance is complete before work begins

  2. 2

    Final / Site Clear

    Site cleared, foundation removed or capped, site conditions verified

Applies to: EV Charger / EVSE Permit

  1. 1

    Rough-In

    After wiring installed, before walls closed — verify box placement, wire sizing, proper support for the EV charger circuit

  2. 2

    Final

    Charger connection, GFCI/AFCI protection (as applicable), and panel labeling verified

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and gas piping installed, before walls closed — verify clearances and support

  2. 2

    Final

    Equipment operational, combustion air verified, gas pressure tested, thermostat functional

Applies to: Roofing Permit

  1. 1

    Deck / Substrate

    After tear-off — verify sheathing condition and replace damaged decking before proceeding

  2. 2

    Final

    Completed roof — verify ice and water shield, flashing, drip edge, and nailing pattern

Applies to: Solar Panel Permit

  1. 1

    Rough Electrical

    Conduit runs, wire sizing, disconnect placement before energizing

  2. 2

    Final / Structural

    Panel mounting, racking attachment, roof penetration sealing, and electrical connections verified

Sources & verification

Verified against official sources. Last reviewed 2026-06-30.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Ogden building permits

Get alerts for Ogden

We'll email you when Ogden's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.