Electrical Permit in Ogden, Utah

Required for electrical work in Ogden including new circuits, panel upgrades, service changes, and new construction wiring. Governed by the 2023 National Electrical Code (NEC) as adopted statewide by Utah Code § 15A-2-103(1)(g). Permit fee is valuation-based per the Technical Code Base Fee Schedule. EV charger/EVSE installation is electrical work and falls under this general Electrical Permit; neither Ogden's Permit Requirements page nor its Transportation Electrification page publish a separate EV-specific permit type or fee line item.

Verified 2026-07-20 · Source

When you need this permit

  • New electrical circuits or wiring installations
  • Electrical panel upgrades or replacements
  • Service entrance changes
  • Adding or relocating outlets, switches, or fixtures
  • Generator or solar panel electrical connections
  • Altering, changing, extending, installing, repairing, or replacing any electrical system

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit FeeOgden City Code § 4-6-1.A.9.a: building permit fees apply to 'building, plumbing, electrical, mechanical, demolitions, etc.' A $70.50 deposit is collected at application acceptance.
Valuation-based per Technical Code Base Fee Schedule — same table as residential building permit (minimum $70.50 for work valued at $1,200 or less)
Plan Review FeeOgden City Code § 4-6-1.A.9.c
65% of the Technical Code Base Fee Schedule, or actual cost if less
Additional InspectionsOgden City Code § 4-6-1.A.9.b
$47.00 per hour

Review timeline

Plan reviewOgden’s published plan-review target
10–15 business days

How long did your Electrical Permit permit actually take in Ogden?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    After wiring installed, before walls closed — verify box placement, wire sizing, proper support

  2. 2

    Service / Panel

    Panel installation, grounding electrode system, service entrance conductors

  3. 3

    Final

    All devices installed, GFCI/AFCI protection verified, panel labeled

See the full Ogden inspection guide — scheduling & re-inspection fees →

Tips

  • All electrical work in Ogden must comply with the 2023 NEC as adopted statewide by Utah Code § 15A-2-103(1)(g).
  • Homeowners may pull their own electrical permit for owner-occupied residences. Commercial and residential rental work requires a Utah-licensed contractor. Owner-builderContractor
  • AFCI protection is required on all 15A and 20A bedroom circuits under the 2023 NEC.
  • GFCI protection is required in kitchens, bathrooms, garages, outdoors, and crawl spaces.
  • EV charger (Level 2 EVSE) installations do not have their own permit type in Ogden — pull this general Electrical Permit for the dedicated circuit and charger connection.

Frequently asked questions

Yes. Ogden City's Permit Requirements page states a permit is required for electrical work that alters, changes, extends, installs, repairs, or replaces any electrical system.

Electrical permit fees in Ogden are valuation-based using the Technical Code Base Fee Schedule (Ogden City Code § 4-6-1.A.9): $70.50 minimum for work valued at $1,200 or less. Plan review is 65% of the permit fee.

Ogden's published plan-review target for an electrical permit is 10–15 business days.

You'll need: Permit Application. Depending on your project, Ogden may also ask for: Electrical Plan / Single-Line Diagram; Contractor License. See the required-documents checklist on this page for details on each.

Ogden requires 3 inspection(s) for an electrical permit, in order: Rough-In, Service / Panel, Final. Schedule each through Ogden City Building Permits & Inspections ((801) 629-8950).

Apply through Ogden City Building Permits & Inspections at 2549 Washington Boulevard, Suite 240, Ogden, UT 84401. Phone: (801) 629-8950, email: permits.insp@ogdencity.gov. Office hours: Mon–Fri 8:00 AM – 5:00 PM (excluding holidays). Official information: https://www.ogdencity.gov/183/Building-Permits-Inspections.

Ogden, Utah has adopted: 2024 International Building Code (IBC), including Appendices C and J — currently in effect as of July 1, 2026, superseding the 2021 IBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(a)); 2021 International Residential Code (IRC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(b)); 2024 International Plumbing Code (IPC) — currently in effect as of July 1, 2026, superseding the 2021 IPC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(d)); 2024 International Mechanical Code (IMC) — currently in effect as of July 1, 2026, superseding the 2021 IMC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(e)); 2024 International Fuel Gas Code (IFGC) — currently in effect as of July 1, 2026, superseding the 2021 IFGC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(f)); 2023 National Electrical Code (NEC) — currently in effect; unchanged by the July 1, 2026 statewide code-edition update (Utah Code § 15A-2-103(1)(g)); 2024 International Energy Conservation Code (IECC) — currently in effect as of July 1, 2026, superseding the 2021 IECC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(h)); 2024 International Existing Building Code (IEBC) — currently in effect as of July 1, 2026, superseding the 2021 IEBC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(i)); Residential provisions of the 2024 International Swimming Pool and Spa Code (ISPSC) — currently in effect as of July 1, 2026, superseding the 2021 ISPSC that was in effect through June 30, 2026 (Utah Code § 15A-2-103(1)(n)); NOTE (updated 2026-07-16): the July 1, 2026 transition forecast in the prior version of this entry has now occurred — confirmed live against Utah Code § 15A-2-103, current version (effective 7/1/2026, superseded 1/1/2027), read at le.utah.gov/xcode/Title15A/Chapter2/15A-2-S103.html. This file cites no Ogden-specific code-adoption webpage; all codesAdopted entries above are sourced directly from the statute.. Local amendments apply — see the Ogden overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Ogden building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.