Building Permit in Kirkland, Washington
Required for construction in Kirkland. The city adopts the 2021 IBC by name but replaces the model code's administrative chapter with its own Construction Administrative Code, which sets out the permit, fee and inspection procedure in detail.
Reviewed 2026-09-16 · Source
When you need this permit
- Built to the 2021 Edition of the International Building Code as adopted by the State Building Code Council, excluding IBC Chapter 1
- Procedure is governed by KMC Chapter 21.06, not by IBC Chapter 1
- Plan review fees are payable when submittal documents are submitted
- The inspection sequence in KMC Chapter 21.06 Article IX applies
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
KIRKLAND'S PERMIT FEE AMOUNTS ARE NOT IN ITS CODE. Show full citationHide
KIRKLAND'S PERMIT FEE AMOUNTS ARE NOT IN ITS CODE. KMC 21.06.390 provides that on the listed work "a fee for each permit shall be paid as required, in accordance with the schedule as established by the Kirkland city council" - so the schedule is a council document outside the code. TWO PROCEDURAL FEE RULES ARE IN THE CODE: plan review fees are payable "at the time of submitting the submittal documents for plan review" (KMC 21.06.395), and "The building official may have the option to charge a deposit, in lieu of the full plan review fee, if the full amount is not known at the time", with the deposit applied against the eventual fee. The chapter also carries sections on related fees, refunds and address change compensation.Review timeline
Inspection process
- 1
Footing and foundation inspection
KMC 21.06.440: made "after poles or piers are set or trenches or basement areas are excavated and all required hold-down anchor bolts, hold-down straps, any forms erected" and other required items are in place.
- 2
Concrete slab and under-floor inspection
KMC 21.06.445: made "after in-slab or under-floor reinforcing steel and building service equipment, conduit, slab insulation, piping accessories and other ancillary equipment" are in place.
- 3
Exterior wall sheathing inspection
KMC 21.06.455: "Exterior wall sheathing shall be inspected after all wall framing is complete, strapping and nailing is properly installed, but prior to being covered."
- 4
Roof sheathing inspection
KMC 21.06.460: "The roof sheathing shall be inspected after all roof framing is complete. No roof coverings shall be installed until inspections are made and approved."
- 5
IMC/UPC/GAS/NEC rough in inspection
KMC 21.06.465: "Rough in mechanical, gas piping, plumbing and electrical shall be inspected when the rough in work is complete and, if required, under test. No connections to primary utilities shall be made until the rough in work" is approved.
- 6
Frame inspection
KMC 21.06.470: made "after the roof deck or sheathing, all framing, fire blocking and bracing are in place and pipes, chimneys and vents to be concealed are complete" and the rough electrical, plumbing and fire suppression work is in place.
- 7
Flashing and exterior weather barrier inspection
KMC 21.06.475: made "after flashing and weather barrier materials have been installed, but prior to any of the work being covered."
- 8
Energy code inspection
KMC 21.06.490: required IN ADDITION to the inspections required by Chapters 51-11C and 51-11R WAC, and includes verifying footing and/or foundation insulation R-values.
- 9
Final inspection
KMC 21.06.515: "The final inspection shall be made after all work required by the permit(s) is completed."
See the full Kirkland inspection guide — scheduling & re-inspection fees →
Tips
- Do not cover sheathing, flashing or weather barrier before its inspection - the code states each is inspected prior to cover
- Roof coverings cannot be installed, and utilities cannot be connected, until the relevant inspection is approved
- The energy code inspection is in addition to the state-required inspections
Frequently asked questions
Sources & verification
Key facts verified against official sources. Last reviewed 2026-09-16.
Codes & ordinances
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Kirkland building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Kirkland's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Kirkland yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Kirkland lands. Privacy.
Other permits in Kirkland
Building Permit in other cities
Compare building permit fees across Washington →
Look up this fee in a different city →