Residential building permit in Bonney Lake, Washington

Permit to build, alter or add to a house in Bonney Lake, under the International Residential Code adopted at BLMC 15.04.020(B).

Verified 2026-09-16 · Source

When you need this permit

  • BLMC 15.04.020(B) adopts the International Residential Code by reference with the Chapter 51-51 WAC exceptions AND NAMES NO EDITION YEAR.
  • “Chapters 11 and 25 through 43 of this code are not adopted” — the IRC's energy chapter and its plumbing, mechanical and electrical chapters are excluded, so those subjects follow the IECC, UPC and IMC instead.
  • Appendix F (Radon Control Methods), Appendix G (Swimming Pools, Spas and Hot Tubs), Appendix R (Dwelling Unit Fire Sprinkler Systems) and Appendix S (Fire Sprinklers) are expressly included.
  • Design criteria are fixed by the table at BLMC 15.04.020(J), adopted “pursuant to Section R301.2 of the International Residential Code and ASCE 7-16”: 20 psf ground snow load, 85 mph wind speed with topographic effects, seismic design category D1, 12-inch frost line depth, winter design temperature 27, air freeze index 160.
  • PERMIT EXPIRY IS NOT IN THE BUILDING CHAPTER. BLMC 15.04.081 is repealed; BLMC 14.10.100 applies, and a permit expires two years after issuance if the use is not commenced or the construction permits are not issued.
  • Adding dwelling units to a building that has held a certificate of occupancy for at least three years may avoid current energy code on unchanged residential or conditioned portions, under BLMC 15.04.098(A)(1).

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Permit fee
No dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. Show full citationNo dollar figure is published in the code, AND THE FEE SECTIONS IN THE BUILDING CHAPTER NO LONGER EXIST. BLMC 15.04.072 “Building permit – Fees” and 15.04.080 “Building plan review – Fees” both read “Repealed by Ord. 1598.” Fees moved to BLMC Chapter 3.68 in the revenue title, where 3.68.030 provides that fees “shall be set by resolution of the city council”. REFUNDS ARE DISCRETIONARY AND EFFORT-BASED: BLMC 3.68.020 lets the director refund “not more than 80 percent of the building permit fee paid when no work has been done”, and not more than 80 percent where an application is withdrawn before approval, with “the amount of the refund … based on the amount of effort expended by the city”. Ask the city for the current resolution.
Set by city council resolution

Review timeline

Plan review
Not published — contact the department

How long did your Residential building permit permit actually take in Bonney Lake?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • The IRC's own plumbing, mechanical and electrical chapters are not adopted here, so do not design residential systems from the IRC alone — the standalone UPC and IMC govern.
    • Because no edition year is named anywhere, two projects a year apart can be reviewed against different editions without any ordinance changing. Get the operative edition in writing.

    Frequently asked questions

    Bonney Lake requires a residential building permit for: BLMC 15.04.020(B) adopts the International Residential Code by reference with the Chapter 51-51 WAC exceptions AND NAMES NO EDITION YEAR.; “Chapters 11 and 25 through 43 of this code are not adopted” — the IRC's energy chapter and its plumbing, mechanical and electrical chapters are excluded, so those subjects follow the IECC, UPC and IMC instead.; Appendix F (Radon Control Methods), Appendix G (Swimming Pools, Spas and Hot Tubs), Appendix R (Dwelling Unit Fire Sprinkler Systems) and Appendix S (Fire Sprinklers) are expressly included.; Design criteria are fixed by the table at BLMC 15.04.020(J), adopted “pursuant to Section R301.2 of the International Residential Code and ASCE 7-16”: 20 psf ground snow load, 85 mph wind speed with topographic effects, seismic design category D1, 12-inch frost line depth, winter design temperature 27, air freeze index 160.; PERMIT EXPIRY IS NOT IN THE BUILDING CHAPTER. BLMC 15.04.081 is repealed; BLMC 14.10.100 applies, and a permit expires two years after issuance if the use is not commenced or the construction permits are not issued.; Adding dwelling units to a building that has held a certificate of occupancy for at least three years may avoid current energy code on unchanged residential or conditioned portions, under BLMC 15.04.098(A)(1).. If your project isn't listed, confirm with City of Bonney Lake at (253) 862-8602 before starting work.

    In Bonney Lake, the published Permit fee is: Set by city council resolution. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    BLMC 14.10.100 gives two years from issuance if the use is not commenced or construction permits are not issued. Once construction permits issue, the project permit is tied to them — and if the construction permit expires, the project permit approval becomes null and void.

    You'll need: Permit application. Depending on your project, Bonney Lake may also ask for: Confirmation of the operative code edition; Fee schedule resolution. See the required-documents checklist on this page for details on each.

    Apply through City of Bonney Lake at 9002 Main St E, Bonney Lake, WA 98391. Phone: (253) 862-8602. Official information: https://www.ci.bonney-lake.wa.us/.

    Bonney Lake, Washington has adopted: THE ADOPTION NAMES NO EDITION YEAR FOR ANY CODE. BLMC 15.04.020 adopts every code “by this reference as if fully set forth”, “Pursuant to RCW 35A.12.140”, and none of the nine lettered items states a year.; AND IT DELEGATES FUTURE EDITIONS TO A NAMED OFFICER, EXPRESSLY BYPASSING THE COUNCIL: “provided, that the community development director or building official at any time may adopt any subsequent or amended versions of the following codes without further action by the city council, such that the most current version of the regulations remains in effect”.; IBC — BLMC 15.04.020(A): “The International Building Code, published by the International Code Council, is hereby adopted by reference with the exceptions noted in Chapter 51-50 WAC.”; IRC — BLMC 15.04.020(B), adopted with the Chapter 51-51 WAC exceptions, “provided, that Chapters 11 and 25 through 43 of this code are not adopted”. Appendix F (Radon Control Methods), Appendix G (Swimming Pools, Spas and Hot Tubs), Appendix R (Dwelling Unit Fire Sprinkler Systems) and Appendix S (Fire Sprinklers) ARE included.; IFC — BLMC 15.04.020(C), adopted with Appendix B (Fire-Flow Requirements for Buildings) and Appendix D (Fire Apparatus Access Roads) only, per Chapter 51-54A WAC.; IECC — BLMC 15.04.020(D): “The International Energy Conservation Code, as amended by Chapters 51-11C and 51-11R WAC, is hereby adopted by reference.”; IMC — BLMC 15.04.020(E), adopted by reference with the exceptions noted in Chapter 51-52 WAC.; UPC — BLMC 15.04.020(F), adopted by reference. Washington is a Uniform Plumbing Code state.; IEBC — BLMC 15.04.020(H), adopted by reference with no year.; IFGC — BLMC 15.04.020(I), adopted by reference with the exceptions noted in Chapter 51-52 WAC.; NO ELECTRICAL CODE IS ADOPTED. Chapter 15.04's nineteen sections were enumerated and none adopts the NEC or the Washington Cities Electrical Code, and the IRC's own electrical chapters (25 through 43) are among those expressly NOT adopted. No electrical route is asserted for this city.. Local amendments apply — see the Bonney Lake overview page for the full list.

    The code does not say. BLMC 15.04.020 adopts the IRC by reference with no year and allows the community development director or building official to adopt subsequent versions at any time without council action, so the operative edition must be confirmed with the city.

    Sources & verification

    Verified against official sources. Last reviewed 2026-09-16.

    Department & other records

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Bonney Lake building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

    Bonney Lake's permit history isn't searchable here yet

    This page covers what the permit requires. What we don't have for Bonney Lake yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.

    Your email, and the place — never an address. We only use it to tell you when Bonney Lake lands. Privacy.

    Compare residential building permit fees across Washington

    Look up this fee in a different city →

    Embed this data card →

    Related guides

    Now live

    Build your Bonney Lake project checklist

    Describe your project once and get every permit, document, and fee it triggers in Bonney Lake — in one checklist. Free, for any city and any number of projects.

    Get started →