Bellingham building permits
Department contacts, adopted codes, permit types, fees, and gotchas for Bellingham, Washington.
Last verified 2026-09-16 · Source · Embed this page’s badge · Version history
Building department
- Phone
- (360) 778-8000
- Website
- Official site
Codes adopted
The State Building Code is in effect in every county and city in Washington, and its minimum performance standards may not be diminished locally. A local amendment that affects single-family or multifamily residential buildings is not effective unless the State Building Code Council approves it; amendments to non-residential provisions carry no such approval requirement.
THE 2021 EDITIONS, NAMED, AND TAKING STATE AMENDMENTS AS THEY COME. Show full textShow less
THE 2021 EDITIONS, NAMED, AND TAKING STATE AMENDMENTS AS THEY COME. BMC 17.10.010(A): "Except as amended by this chapter, the following codes, published by the International Code Council, as now and hereafter amended by the state of Washington, are hereby adopted by reference: 1. 2021 International Building Code and Appendix E - Chapter 51-50 WAC; 2. 2021 International Residential Code and Appendix AT - Chapter 51-51 WAC; 3. 2021 International Mechanical Code; 4. 2021 International Fuel Gas Code; 5. 2021 International Property Maintenance Code; 6. 2021 International Existing Building Code; 7. 2021 International Energy Conservation Code; 8. 2017 ICC/ANSI A117.1 Accessibility Code and Appendix E; 9. 2021 International Swimming Pool and Spa Code".
- THE EDITIONS ARE NOT ALL ONE CYCLE. BMC 17.10.010(B) adopts the "2021 National Fuel Gas Code (NFPA 54)" and the "2020 Liquefied Petroleum Gas Code (NFPA 58)"; subsection (D) adopts "The 2023 National Electric Code (NFPA 70), as amended by Chapter 296-46B WAC". So the electrical code is two cycles ahead of the building code and the LP gas code one behind - the same spread Tukwila shows.
- A WILDFIRE CODE APPLIES, AND THE CITY ATTRIBUTES IT TO THE STATE. BMC 17.10.010(E): "In accordance with state requirements, 2021 International Wildland-Urban Interface Code - Chapter 51-55 WAC." Federal Way also carries the 2021 IWUIC. Bellingham's wording credits a state requirement; this guide reports that phrasing and does not adjudicate whether the two adoptions have the same origin.
- THE PLUMBING CODE IS THE 2021 UNIFORM PLUMBING CODE under Chapter 51-56 WAC, adopted by BMC 17.10.010(C) on the same "as now and hereafter amended" basis.
- RCW 19.27 - the Washington State Building Code applies statewide.
Permit types & fees
Building Permit
Required for construction in Bellingham. The city names the 2021 editions but takes state amendments as they are made, and replaces the model codes' administrative chapters with its own Construction Administrative Code.
See fee scheduleAlteration or Change of Occupancy in an Older Building
Bellingham sets a hard date for existing structures: work on buildings that existed before 1 January 1985 triggers conformance requirements.
See fee scheduleVerify a Contractor Licence
Washington contractors register with the Department of Labor & Industries. Registration is a STATE record; Bellingham does not issue it.
See fee schedule
Bellingham's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Bellingham yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Bellingham lands. Privacy.
New residential construction activity
New privately-owned residential construction onlyHousing units authorized by building permits for new privately-owned residential construction — this is not total permit volume (no commercial permits or remodels).
- Latest month (2026-07)
- 39units
17 buildings · $8.6M valuation
- Trailing 12 months
- 621units
12 of 12 months reported · #6 in Washington coverage by units
- Year to date (2026 YTD through 2026-07)
- 304units
128 buildings · $54.6M valuation
7 month(s) reported to Census
- Full year 2025
- 737units
277 buildings · $133.7M valuation
Source: U.S. Census Bureau, Building Permits Survey (BPS), 2026-07 vintage. Census survey data — separate from the permit-requirements verification above. All Washington building activity
Tips & gotchas
- "THE BELLINGHAM COMMERCIAL ENERGY CODE" CHANGED MEANING ON 15 MARCH 2024. The city's own bespoke code was repealed and the state IECC adopted under the same name.
- The chapter index gives no repeal marker for it - you only see it on opening the section.
- Work on a building that existed before 1 January 1985 triggers conformance requirements under the amended IEBC Section 1401.2.
- If the city retains an outside consultant to review your application, you reimburse the cost on top of normal fees - and may be asked for a deposit first. Lynden, in the same county, does the same.
- The administrative rules are Bellingham's Construction Administrative Code, not the model codes' Chapter 1.
- Editions are not all one cycle: 2021 building, 2023 electrical, 2020 LP gas, 2017 accessibility standard.
- A 2021 International Wildland-Urban Interface Code applies, which the city attributes to state requirements.
- The publisher flags 4 pending updates against a 1 June 2026 currency date.