Skip to main content
PermitBase

Driveway / Road-Use (Access) Permit in Unincorporated Sheridan County, Wyoming

Required countywide for any driveway or subdivision road entering a Sheridan County-maintained road; issued by Sheridan County Engineering at no charge. Driveways accessing a STATE highway instead require a WYDOT access permit, not a county permit.

Verified 2026-07-16 · Source

When you need this permit

  • Required before performing any work within county right-of-way for a new or modified driveway/subdivision road access onto a county-maintained road
  • Application specifies road name/number, township/range/section, mile point, and side of road
  • County Engineer determines minimum culvert/drainage-structure size (minimum 18-inch round or equivalent pipe-arch, 24 feet long) and whether a Road-Use Agreement is required
  • Gravel minimum 4 inches deep required on the driveway for at least 150 feet (or the driveway length, whichever is less) from the county road edge
  • Permit is void if the driveway is not constructed within 6 months of approval
  • Call (307) 674-2920 for County inspection once construction is complete
  • Driveways onto STATE highways instead require a WYDOT Access Permit — not this county permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Driveway permit feeSheridan County Application for Driveway Permit (updated 3/22), Administration item 1
No charge — "There will not be a charge for issuing a driveway permit"

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Sheridan County building department
~5–20 business days

How long did your Driveway / Road-Use (Access) Permit permit actually take in Unincorporated Sheridan County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Pre-Approval Site Inspection

    Property owner marks the driveway approach; County Engineer's office inspects site, sight distance, and culvert/drainage sizing before approving

  2. 2

    Completion Inspection

    Property owner calls (307) 674-2920 when construction is complete for county inspection

See the full Unincorporated Sheridan County inspection guide — scheduling & re-inspection fees →

Tips

  • This county driveway permit is free, unlike the Zoning Permit or septic/floodplain permits.
  • If your access point is onto a state highway rather than a county road, you need a WYDOT Access Permit instead — contact WYDOT Sheridan, 10 E. Brundage Lane, Sheridan, WY, (307) 674-2300.
  • A copy of the approved access permit (whichever agency applies) must be submitted with the county Zoning Permit application.

Frequently asked questions

Unincorporated Sheridan County requires a driveway / road-use (access) permit for: Required before performing any work within county right-of-way for a new or modified driveway/subdivision road access onto a county-maintained road; Application specifies road name/number, township/range/section, mile point, and side of road; County Engineer determines minimum culvert/drainage-structure size (minimum 18-inch round or equivalent pipe-arch, 24 feet long) and whether a Road-Use Agreement is required; Gravel minimum 4 inches deep required on the driveway for at least 150 feet (or the driveway length, whichever is less) from the county road edge; Permit is void if the driveway is not constructed within 6 months of approval; Call (307) 674-2920 for County inspection once construction is complete; Driveways onto STATE highways instead require a WYDOT Access Permit — not this county permit. If your project isn't listed, confirm with Sheridan County Public Works Department (Planning / Building Official) at (307) 674-2920 or (307) 675-2420 before starting work.

In Unincorporated Sheridan County, the published Driveway permit fee is: No charge — "There will not be a charge for issuing a driveway permit". These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for a driveway / road-use (access) permit in Unincorporated Sheridan County typically runs 5–20 business days. This is an estimate, not a published figure — confirm current review times with Sheridan County Public Works Department (Planning / Building Official) at (307) 674-2920 or (307) 675-2420.

You'll need: Sheridan County Application for Driveway Permit (updated 3/22). See the required-documents checklist on this page for details on each.

Unincorporated Sheridan County requires 2 inspection(s) for a driveway / road-use (access) permit, in order: Pre-Approval Site Inspection, Completion Inspection. Schedule each through Sheridan County Public Works Department (Planning / Building Official) ((307) 674-2920 or (307) 675-2420).

Apply through Sheridan County Public Works Department (Planning / Building Official) at 224 South Main Street, Suite 428, Sheridan, WY 82801. Phone: (307) 674-2920 or (307) 675-2420, email: publicworks@sheridancountywy.gov. Office hours: Mon–Fri 8:00am–5:00pm (Sheridan County general office hours per the sheridancountywy.gov site footer, re-confirmed 2026-07-16; not separately published as Public-Works-specific hours). Official information: https://www.sheridancountywy.gov/departments/planning/building_in_the_county/index.php.

Unincorporated Sheridan County, Wyoming has adopted: NO countywide building code / NO general building permit for private construction in unincorporated Sheridan County. Per the Wyoming State Fire Marshal's 'Local and State Jurisdictions' chart, Sheridan County (county-level row) is listed BLDG INSP/PR = STATE and ELEC INSP/PR = STATE — the county has NOT taken general countywide building-code delegation under W.S. § 35-9-121, so the State Fire Marshal / state program has building and electrical jurisdiction across most of unincorporated Sheridan County.; IMPORTANT NUANCE (confirmed on the county's own site): Sheridan County DOES have an adopted 'Building Standards, Sheridan County, Wyoming' rule (adopted Nov. 18, 1991; last amended May 16, 2023, filed as County Clerk doc. #2023-785780) that adopts the 2021 International Building Code, 2021 IRC, 2021 IMC, 2021 IFGC, 2021 IPC, 2021 International Fire Code, the 2022 National Electrical Code, and the Uniform Code for the Abatement of Dangerous Buildings — but ARTICLE I, Section 3 (Applicability) confirms this code applies ONLY within a mapped 'Sheridan County Building Standards Area' (a defined zone around/adjoining the City of Sheridan shown on the Appendix A Planning Map), PLUS specific legacy subdivisions the BOCC imposed permitting/inspection on before Dec. 5, 2006, all NEW subdivisions approved after Dec. 5, 2006, and any structure built under a Conditional Use Permit. It does NOT apply countywide.; Farms and ranches on 40 acres or more of deeded land are specifically EXEMPT from the Building Standards code entirely (Article I, Sec. 3(b)(1)), as are county hospitals, mines/oilfield/refinery facilities, and railway buildings.; Where the Building Standards DO apply (the mapped area / qualifying subdivisions / CUP structures): a building permit is required before construction of any building/structure valued over $5,000 (Article III, Sec. 1), enforced by the Sheridan County Building Official.; Where the Building Standards do NOT apply (the vast majority of unincorporated Sheridan County — rural and agricultural land outside the mapped area): there is no county building permit for private construction; a Zoning Permit (land-use/setback compliance, not a structural building-code permit) is still required countywide for new construction or change of use.; Electrical: wiring permits/inspections are issued by the Wyoming State Fire Marshal's Office — Dept. of Fire Prevention & Electrical Safety (Chief Electrical Inspector), not Sheridan County, per the county's own Zoning Permit application which directs applicants doing new electrical work to WSFM..

No. Per the county's Application for Driveway Permit, there is no charge for issuing a driveway permit onto a county-maintained road. Driveways onto state highways require a separate WYDOT access permit instead.

Sources & verification

Verified against official sources. Last reviewed 2026-07-16.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Sheridan County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.