EV Charger / EVSE Permit in Unincorporated Sheridan County, Wyoming

Unincorporated Sheridan County does not run its own electrical inspection program — electrical wiring permits are issued by the Wyoming State Fire Marshal's Office (WSFM), Dept. of Fire Prevention & Electrical Safety, under W.S. § 35-9-119, confirmed by the county's own Zoning Permit application, which routes new electrical work to the state program. An EV charger/EVSE installation therefore requires a State of Wyoming Electrical Wiring Permit through WSFM, not a county permit. WSFM publishes no distinct EV charger/EVSE fee line; a residential EVSE circuit is billed under the same standard wiring permit and residential service inspection fee structure used for all electrical work.

Verified 2026-07-20 · Source

When you need this permit

  • State of Wyoming Electrical Wiring Permit (WSFM) required for EV charger/EVSE circuit installation in unincorporated Sheridan County — apply online via wyelectrician.imagetrendlicense.com
  • A Sheridan regional WSFM inspector office handles local inspections
  • Installation must comply with the 2026 NEC as enforced statewide by WSFM effective July 1, 2026 (2023 NEC was in effect before that date)
  • No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform was found published by WSFM as of this review

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Standard wiring permitWY State Fire Marshal electrical fee schedule — same base permit fee documented on this jurisdiction's Electrical Permit entry; no distinct EV charger/EVSE fee line is published. Permit fee is waived if an inspection is requested and paid for.
$50.00 (temporary/90-day permit: $40.00)
Residential inspection fee — 100A service (typical for a Level 2 EV charger circuit)WY State Fire Marshal electrical fee schedule.
$70.00 (includes the $50 permit)
Residential inspection fee — 200A serviceWY State Fire Marshal electrical fee schedule — applicable if the EV charger installation requires a larger service upgrade.
$120.00 (includes the $50 permit)

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Sheridan County building department
~5–20 business days

How long did your EV Charger / EVSE Permit permit actually take in Unincorporated Sheridan County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Residential Electrical Inspection

    EVSE circuit, breaker, disconnect, and equipment mounting inspected by the WSFM regional inspector

See the full Unincorporated Sheridan County inspection guide — scheduling & re-inspection fees →

Tips

  • Sheridan County itself does NOT run an electrical inspection program for unincorporated areas — EV charger/EVSE installations go through the Wyoming State Fire Marshal, not the county.
  • This differs from the CITY of Sheridan, which does issue its own electrical permits within city limits — do not use the city's process for unincorporated county parcels.

Frequently asked questions

Unincorporated Sheridan County requires an ev charger / evse permit for: State of Wyoming Electrical Wiring Permit (WSFM) required for EV charger/EVSE circuit installation in unincorporated Sheridan County — apply online via wyelectrician.imagetrendlicense.com; A Sheridan regional WSFM inspector office handles local inspections; Installation must comply with the 2026 NEC as enforced statewide by WSFM effective July 1, 2026 (2023 NEC was in effect before that date); No distinct EV charger/EVSE fee line, expedited timeline, or SolarAPP+-style instant-permitting platform was found published by WSFM as of this review. If your project isn't listed, confirm with Sheridan County Public Works Department (Planning / Building Official) at (307) 674-2920 or (307) 675-2420 before starting work.

In Unincorporated Sheridan County, the published Standard wiring permit is: $50.00 (temporary/90-day permit: $40.00). Additional published fees: Residential inspection fee — 100A service (typical for a Level 2 EV charger circuit) — $70.00 (includes the $50 permit); Residential inspection fee — 200A service — $120.00 (includes the $50 permit). These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Plan review for an ev charger / evse permit in Unincorporated Sheridan County typically runs 5–20 business days. This is an estimate, not a published figure — confirm current review times with Sheridan County Public Works Department (Planning / Building Official) at (307) 674-2920 or (307) 675-2420.

You'll need: Wyoming State Fire Marshal Electrical Wiring Permit Application. See the required-documents checklist on this page for details on each.

Unincorporated Sheridan County requires 1 inspection(s) for an ev charger / evse permit, in order: Residential Electrical Inspection. Schedule each through Sheridan County Public Works Department (Planning / Building Official) ((307) 674-2920 or (307) 675-2420).

Apply through Sheridan County Public Works Department (Planning / Building Official) at 224 South Main Street, Suite 428, Sheridan, WY 82801. Phone: (307) 674-2920 or (307) 675-2420, email: publicworks@sheridancountywy.gov. Office hours: Mon–Fri 8:00am–5:00pm (Sheridan County general office hours per the sheridancountywy.gov site footer, re-confirmed 2026-07-16; not separately published as Public-Works-specific hours). Official information: https://www.sheridancountywy.gov/departments/planning/building_in_the_county/index.php.

Unincorporated Sheridan County, Wyoming has adopted: NO countywide building code / NO general building permit for private construction in unincorporated Sheridan County. Per the Wyoming State Fire Marshal's 'Local and State Jurisdictions' chart, Sheridan County (county-level row) is listed BLDG INSP/PR = STATE and ELEC INSP/PR = STATE — the county has NOT taken general countywide building-code delegation under W.S. § 35-9-121, so the State Fire Marshal / state program has building and electrical jurisdiction across most of unincorporated Sheridan County.; IMPORTANT NUANCE (confirmed on the county's own site): Sheridan County DOES have an adopted 'Building Standards, Sheridan County, Wyoming' rule (adopted Nov. 18, 1991; last amended May 16, 2023, filed as County Clerk doc. #2023-785780) that adopts the 2021 International Building Code, 2021 IRC, 2021 IMC, 2021 IFGC, 2021 IPC, 2021 International Fire Code, the 2022 National Electrical Code, and the Uniform Code for the Abatement of Dangerous Buildings — but ARTICLE I, Section 3 (Applicability) confirms this code applies ONLY within a mapped 'Sheridan County Building Standards Area' (a defined zone around/adjoining the City of Sheridan shown on the Appendix A Planning Map), PLUS specific legacy subdivisions the BOCC imposed permitting/inspection on before Dec. 5, 2006, all NEW subdivisions approved after Dec. 5, 2006, and any structure built under a Conditional Use Permit. It does NOT apply countywide.; Farms and ranches on 40 acres or more of deeded land are specifically EXEMPT from the Building Standards code entirely (Article I, Sec. 3(b)(1)), as are county hospitals, mines/oilfield/refinery facilities, and railway buildings.; Where the Building Standards DO apply (the mapped area / qualifying subdivisions / CUP structures): a building permit is required before construction of any building/structure valued over $5,000 (Article III, Sec. 1), enforced by the Sheridan County Building Official.; Where the Building Standards do NOT apply (the vast majority of unincorporated Sheridan County — rural and agricultural land outside the mapped area): there is no county building permit for private construction; a Zoning Permit (land-use/setback compliance, not a structural building-code permit) is still required countywide for new construction or change of use.; Electrical: wiring permits/inspections are issued by the Wyoming State Fire Marshal's Office — Dept. of Fire Prevention & Electrical Safety (Chief Electrical Inspector), not Sheridan County, per the county's own Zoning Permit application which directs applicants doing new electrical work to WSFM..

No — unincorporated Sheridan County has no local electrical permitting authority. EV charger/EVSE installations require a State of Wyoming Electrical Wiring Permit through the WY State Fire Marshal's Office. There is no distinct EV charger fee; a typical residential installation is billed under the standard wiring permit ($50) plus a service inspection fee ($70 for 100A). Source: WY State Fire Marshal — Electrical Safety (https://wsfm.wyo.gov/electrical-safety).

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Sheridan County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.