Unincorporated Sheridan County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Sheridan County, Wyoming.

Verified 2026-07-01 · Source

How to schedule

Inspections are requested through the building department below.

Address
224 South Main Street, Suite 428, Sheridan, WY 82801
Phone
(307) 674-2920 or (307) 675-2420
Office hours
Mon–Fri 8:00am–5:00pm (Sheridan County general office hours per the sheridancountywy.gov site footer, re-confirmed 2026-07-16; not separately published as Public-Works-specific hours)

Published scheduling rules

  • 24-hour notice required to schedule the final inspection prior to backfilling the system (Septic / Small Wastewater System Permit)

Inspection sequence

Applies to: Solar PV Permit

  1. 1

    Site / Setback Inspection (Zoning Permit)

    Performed upon zoning permit approval; new construction must be staked out per the approved plot plan

  2. 2

    WSFM Electrical Inspection

    Performed by the Wyoming State Fire Marshal's Office, not the county — verifies wiring, disconnects, and point of connection

  3. 3

    County Structural Inspection (only within the mapped Building Standards Area or other covered subdivisions)

    Verifies structural/mounting work per the adopted 2021 I-Codes, only where a county structural building permit applies

Applies to: Driveway / Road-Use (Access) Permit

  1. 1

    Pre-Approval Site Inspection

    Property owner marks the driveway approach; County Engineer's office inspects site, sight distance, and culvert/drainage sizing before approving

  2. 2

    Completion Inspection

    Property owner calls (307) 674-2920 when construction is complete for county inspection

Applies to: Fire Sprinkler / Fire Alarm Permit (State Program)

  1. 1

    Plan Review Fire Inspection

    Fire & life-safety plan review and inspection conducted during construction to confirm compliance with state-adopted codes

  2. 2

    Final Inspection / Certificate of Occupancy or Letter of Compliance

    Performed upon completion of the installed system; WSFM issues a Certificate of Occupancy or Letter of Compliance once all required inspections pass

Applies to: Septic / Small Wastewater System Permit

  1. 1

    Groundwater Test Pit Inspection

    Pit dug 4 feet deeper than the bottom of the proposed leachfield, open 24+ hours, inspected by a county representative prior to application submission

  2. 2

    Final / Backfill Inspection

    24-hour notice required; must pass before the system is backfilled

Unincorporated Sheridan County building permits

Get alerts for Unincorporated Sheridan County

We'll email you when Unincorporated Sheridan County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.