Skip to main content
PermitBase

Unincorporated Sheridan County building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Sheridan County, Wyoming.

Verified 2026-07-01 · Source

How to schedule

Inspections are requested through the building department below.

Address
224 South Main Street, Suite 428, Sheridan, WY 82801
Phone
(307) 674-2920 or (307) 675-2420
Office hours
Mon–Fri 8:00am–5:00pm (Sheridan County general office hours per the sheridancountywy.gov site footer; not separately published as Public-Works-specific hours)

Published scheduling rules

  • 24-hour notice required to schedule the final inspection prior to backfilling the system (Septic / Small Wastewater System Permit)

Inspection sequence

Applies to: Solar PV Permit

  1. 1

    Site / Setback Inspection (Zoning Permit)

    Performed upon zoning permit approval; new construction must be staked out per the approved plot plan

  2. 2

    WSFM Electrical Inspection

    Performed by the Wyoming State Fire Marshal's Office, not the county — verifies wiring, disconnects, and point of connection

  3. 3

    County Structural Inspection (only within the mapped Building Standards Area or other covered subdivisions)

    Verifies structural/mounting work per the adopted 2021 I-Codes, only where a county structural building permit applies

Applies to: Driveway / Road-Use (Access) Permit

  1. 1

    Pre-Approval Site Inspection

    Property owner marks the driveway approach; County Engineer's office inspects site, sight distance, and culvert/drainage sizing before approving

  2. 2

    Completion Inspection

    Property owner calls (307) 674-2920 when construction is complete for county inspection

Applies to: Fire Sprinkler / Fire Alarm Permit (State Program)

  1. 1

    Plan Review Fire Inspection

    Fire & life-safety plan review and inspection conducted during construction to confirm compliance with state-adopted codes

  2. 2

    Final Inspection / Certificate of Occupancy or Letter of Compliance

    Performed upon completion of the installed system; WSFM issues a Certificate of Occupancy or Letter of Compliance once all required inspections pass

Applies to: Septic / Small Wastewater System Permit

  1. 1

    Groundwater Test Pit Inspection

    Pit dug 4 feet deeper than the bottom of the proposed leachfield, open 24+ hours, inspected by a county representative prior to application submission

  2. 2

    Final / Backfill Inspection

    24-hour notice required; must pass before the system is backfilled

Sources & verification

Verified against official sources. Last reviewed 2026-07-01.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Sheridan County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Unincorporated Sheridan County building permits

Get alerts for Unincorporated Sheridan County

We'll email you when Unincorporated Sheridan County's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.