Solar PV Permit — Unincorporated Sheridan County, Wyoming · Requirements sheet
Verified 2026-07-20 · Source: https://www.sheridancountywy.gov/departments/planning/building_in_the_county/index.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Solar PV Permit in Unincorporated Sheridan County, Wyoming
Sheridan County has no dedicated solar permit or fee category. A residential rooftop or ground-mounted PV installation is processed under the same baseline Zoning Permit ($150) required countywide for any new construction or accessory structure, verifying setbacks and zoning-district compliance — no solar-specific accessory-use classification or setback distance was found published in the county's zoning materials. A true structural building-code permit additionally applies ONLY if the parcel falls within the mapped Sheridan County Building Standards Area (near the City of Sheridan), a pre-2006 legacy subdivision the county already permits, a post-2006 subdivision, or a Conditional Use Permit structure — otherwise the county has no structural building-code review at all for private construction. Electrical interconnection is handled by the Wyoming State Fire Marshal's Office (WSFM) — Dept. of Fire Prevention & Electrical Safety, not the county, per the same statewide mechanism documented in this jurisdiction's Electrical Permit entry.
Verified 2026-07-20 · Source
When you need this permit
- Zoning Permit required countywide before installing a rooftop or ground-mounted solar system, as new construction/an accessory structure — submit a plot plan (to scale, ≤11x17) showing property lines, setbacks, and the array's location relative to existing structures
- Proof of ownership (recorded deed copy) and documentation of when the parcel was legally established
- A true structural building-code permit (2021 I-Codes) additionally applies ONLY if the parcel is within the mapped Sheridan County Building Standards Area, a specific pre-Dec. 5, 2006 legacy subdivision, any subdivision approved after Dec. 5, 2006, or a Conditional Use Permit structure
- Electrical interconnection (arrays, inverters, disconnects, point of connection) requires a separate Wyoming State Fire Marshal Electrical Wiring Permit — apply online via wyelectrician.imagetrendlicense.com — not issued by Sheridan County
- Copy of an approved access permit must accompany the Zoning Permit application if the project changes driveway/road access
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Site / Setback Inspection (Zoning Permit)
Performed upon zoning permit approval; new construction must be staked out per the approved plot plan
- 2
WSFM Electrical Inspection
Performed by the Wyoming State Fire Marshal's Office, not the county — verifies wiring, disconnects, and point of connection
- 3
County Structural Inspection (only within the mapped Building Standards Area or other covered subdivisions)
Verifies structural/mounting work per the adopted 2021 I-Codes, only where a county structural building permit applies
See the full Unincorporated Sheridan County inspection guide — scheduling & re-inspection fees →
Tips
- There is no dedicated 'solar' line anywhere in Sheridan County's published fees — every solar installation starts with the same $150 baseline Zoning Permit required of any new construction or accessory structure countywide.
- Whether you also need a full structural building-code permit depends entirely on your parcel's location relative to the mapped Building Standards Area (near the City of Sheridan) and its subdivision history — confirm this with Sheridan County Public Works (307-674-2920) before assuming either way, since most of unincorporated Sheridan County has NO structural building-code review at all.
- Budget for the separate Wyoming State Fire Marshal Electrical Wiring Permit for the interconnection wiring, since Sheridan County does not administer electrical permits itself.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Sheridan County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Unincorporated Sheridan County
Solar PV Permit in other cities
Compare solar pv permit fees across Wyoming →
Look up this fee in a different city →
Now live
Build your Unincorporated Sheridan County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Sheridan County — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →