Skip to main content
PermitBase

Sign Permit in Unincorporated Sweetwater County, Wyoming

A Sign Permit from the Sweetwater County Land Use Department is required for all signs except a specific list of exempt signs, per Section 13 (Sign Regulations) of the 2015 Zoning Resolution Amended 2/18/25. The permit is a zoning approval (not a building-code permit — see zoning-construction-permit), covers standards on placement, height, clearance, and prohibited sign types (non-accessory off-premise signs/billboards are prohibited except where specifically allowed), and carries a flat $100 fee under the county's own published fee schedule.

Verified 2026-07-22 · Source

When you need this permit

  • A Sign Permit is required for all signs except exempt signs (2015 Zoning Resolution §13.B); application is made on the county's form together with the required fee
  • Non-accessory, off-premise, free-standing signs and billboards are prohibited in all districts except in areas specifically defined in the regulations; where allowed, a maximum of one off-premise sign/billboard is permitted per lot or parcel
  • Freestanding signs, billboards, and roof signs require certification by a Professional Engineer licensed in the State of Wyoming, certifying compliance with the International Building Code (§13.C.2)
  • Sign clearance must be 10 feet above finished grade for the length of the sign; no mounding/filling/berming solely to locate a sign is allowed; freestanding signs may not project beyond the property line or into any right-of-way/easement
  • Wall, free-standing, portable, and roof sign type/size/height allowances (e.g., one free-standing sign up to 100 sq ft, scaling with street frontage) apply only within the CRS, B, C, I-1, and I-2 Zoning Districts (§13.F) — signage rights differ by district
  • The following do NOT require a Sign Permit: one occupant name/address sign ≤3 sq ft mounted flat against a wall, temporary personal notifications, cornerstones/historical markers, temporary decorations, window displays of actual merchandise, certain menu signs, political/election signs, real estate signs (subject to size/duration limits), and signs for operating oil and gas rigs (§13.E)
  • Apply BEFORE erecting the sign — the county assesses a Late Application Fee for work started without an approved permit application (2015 Zoning Resolution §H)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit2015 Zoning Resolution Amended 2/18/25, Section H.L.6 — flat fee, listed under the Non-Residential Permits fee schedule; confirmed by direct PDF text extraction of the county's own published Zoning Resolution
$100.00
Late Application Fee (if sign is erected before permit approval) — Residential / Non-Residential2015 Zoning Resolution Amended 2/18/25, Section H — general late-application fee applied across zoning permit types
$500.00 / $1,000.00

Review timeline

Plan reviewTypical estimate — confirm current times with the Unincorporated Sweetwater County building department
~5–20 business days

How long did your Sign Permit permit actually take in Unincorporated Sweetwater County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

    Tips

    • There is no separate sign-permit fee schedule by district or sign type in the Zoning Resolution — the flat $100 fee applies as listed in the county's own fee schedule, regardless of which district's design standards (§13.F) govern the sign.
    • Off-premise signs/billboards are prohibited in all districts except where specifically allowed — confirm this before assuming an off-premise/billboard sign is possible on a given parcel.
    • Freestanding signs, billboards, and roof signs require PE certification of IBC compliance even though the county otherwise has no general building-code permit program (see zoning-construction-permit) — sign structural review is the one place IBC compliance is explicitly required countywide.

    Frequently asked questions

    Unincorporated Sweetwater County requires a sign permit for: A Sign Permit is required for all signs except exempt signs (2015 Zoning Resolution §13.B); application is made on the county's form together with the required fee; Non-accessory, off-premise, free-standing signs and billboards are prohibited in all districts except in areas specifically defined in the regulations; where allowed, a maximum of one off-premise sign/billboard is permitted per lot or parcel; Freestanding signs, billboards, and roof signs require certification by a Professional Engineer licensed in the State of Wyoming, certifying compliance with the International Building Code (§13.C.2); Sign clearance must be 10 feet above finished grade for the length of the sign; no mounding/filling/berming solely to locate a sign is allowed; freestanding signs may not project beyond the property line or into any right-of-way/easement; Wall, free-standing, portable, and roof sign type/size/height allowances (e.g., one free-standing sign up to 100 sq ft, scaling with street frontage) apply only within the CRS, B, C, I-1, and I-2 Zoning Districts (§13.F) — signage rights differ by district; The following do NOT require a Sign Permit: one occupant name/address sign ≤3 sq ft mounted flat against a wall, temporary personal notifications, cornerstones/historical markers, temporary decorations, window displays of actual merchandise, certain menu signs, political/election signs, real estate signs (subject to size/duration limits), and signs for operating oil and gas rigs (§13.E); Apply BEFORE erecting the sign — the county assesses a Late Application Fee for work started without an approved permit application (2015 Zoning Resolution §H). If your project isn't listed, confirm with Sweetwater County Land Use Department (Planning & Zoning) at (307) 872-3914 before starting work.

    In Unincorporated Sweetwater County, the published Sign Permit is: $100.00. Additional published fees: Late Application Fee (if sign is erected before permit approval) — Residential / Non-Residential — $500.00 / $1,000.00. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

    Plan review for a sign permit in Unincorporated Sweetwater County typically runs 5–20 business days. This is an estimate, not a published figure — confirm current review times with Sweetwater County Land Use Department (Planning & Zoning) at (307) 872-3914.

    You'll need: Signs Application. Depending on your project, Unincorporated Sweetwater County may also ask for: Professional Engineer certification. See the required-documents checklist on this page for details on each.

    Apply through Sweetwater County Land Use Department (Planning & Zoning) at 80 W. Flaming Gorge Way, Suite 23, Green River, WY 82935. Phone: (307) 872-3914, email: binghame@sweetwatercountywy.gov. Office hours: Monday - Friday, 8:00 am - 5:00 pm. Official information: https://www.sweetwatercountywy.gov/departments/land_use/index.php.

    Unincorporated Sweetwater County, Wyoming has adopted: No countywide building code and no county building permit for private construction. Sweetwater County has not taken delegated building-code enforcement authority under Wyoming Statute 35-9-121; the Wyoming Dept. of Fire Prevention & Electrical Safety's "Local and State Jurisdictions" chart lists Sweetwater County BLDG INSP/PR as state (S/S), meaning the State Fire Marshal, not the county, holds building-code jurisdiction (https://wsfm.wyo.gov/electrical-safety, chart updated 7/7/2026, re-verified 2026-07-16 — Sweetwater County row still reads Fire Insp L / Fire PR S / Bldg Insp S / Bldg PR S / Elec Insp S / Elec PR S; Rock Springs (L across the board) and Green River (Bldg Insp L, all else S) are separate incorporated-city rows and do not apply to this unincorporated-county file).; Confirmed independently on the county's own site: the Land Use Department's page states construction in unincorporated Sweetwater County requires an approved ZONING permit (not an IBC/IRC building-code permit) — 'All residential, commercial, industrial and mineral construction and use in the unincorporated areas of Sweetwater County requires an approved zoning permit' (https://www.sweetwatercountywy.gov/departments/land_use/index.php).; The county's own Development Codes page lists only land-use/zoning instruments — the 2015 Zoning Resolution, Growth Management Plan, Subdivision Regulations, Comprehensive Plan, and Federal Lands and Resources Plan — with no adopted IBC/IRC/NEC building-code edition (https://www.sweetwatercountywy.gov/departments/land_use/development_codes.php)..

    No — a specific list of signs is exempt (e.g., one sign 3 sq ft or smaller showing only occupant name/address, real estate signs, political/election signs, temporary decorations, window displays, oil & gas rig signs). All other signs require a Sign Permit ($100) from the Land Use Department under Section 13 of the 2015 Zoning Resolution.

    Non-accessory, off-premise signs and billboards are prohibited in all zoning districts except in areas specifically defined in the Zoning Resolution. Where allowed, only one off-premise sign/billboard is permitted per lot or parcel, and freestanding signs/billboards require PE certification of IBC compliance.

    Sources & verification

    Verified against official sources. Last reviewed 2026-07-22.

    Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Sweetwater County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.