Sign Permit (Permanent Sign) in Flagstaff, Arizona

Required for erecting, placing, altering, repairing, or relocating a permanent commercial/business sign in Flagstaff. This is a Zoning-issued permit (Community Development Director / Current Planning) governed by Flagstaff Zoning Code Division 10-50.100 (Sign Standards) and Section 10-20.40.120 (Sign Permit – Permanent Signs), separate from the Building Safety Section's Building Permit process, though illuminated signs also require an electrical permit/inspection. No sign permit is required for a single-family residence or duplex.

Verified 2026-07-23 · Source

When you need this permit

  • Sign permit required before erecting, placing, displaying, altering, repairing, or relocating any permanent sign structure (Zoning Code Section 10-20.40.120(B))
  • No sign permit is required for a sign on property used exclusively for a single-family residence or duplex (Section 10-50.100.030(B))
  • No sign permit is required for: changes to the face/copy of changeable signs; changing the face/copy of an existing nonilluminated sign from one business to another with no structural or lighting modification; or normal repair/maintenance of a conforming or legal nonconforming sign (Section 10-50.100.030(C))
  • Governed by Zoning Code Division 10-50.100 (Sign Standards): sign area, height, number, and type limits vary by use and zone per Table 10-50.100.060.A
  • Illuminated signs require a separate electrical permit and an electrical inspection prior to placement; electrical service to freestanding or landscape wall signs must be underground and concealed (Section 10-20.40.120(F)(1)(b); Section 10-50.100.080)
  • Freestanding signs require a footing inspection (including additions of sign area to existing signs), plus inspection of braces, anchors, supports, and connections, and a final inspection (Section 10-20.40.120(F))
  • Flashing, rotating, blinking, or strobe-illuminated signs, animation, motion-picture, or laser-projection signs are prohibited citywide (Division 10-50.100)
  • Signs may not be placed within/over a City right-of-way, on public property, obstructing traffic control devices, blocking required means of egress, off-premises from the business referenced, on fuel tanks/waste receptacles, affixed to trees/poles/fences, covering architectural features, or on a roof (except a permitted Roof Mounted Sign) (Section 10-50.100.040)
  • A sign at a corner lot must comply with Engineering Standards Section 13-10-006-0002, Intersection Sight Triangles, Clear View Zones
  • A sign permit expires and becomes void if work is not commenced within 180 days of issuance, or if work is suspended/abandoned for 90 or more days after commencing (Section 10-20.40.120(D)(4))
  • Work commenced without a sign permit, or beyond the authorized scope of one, is assessed double the required permit fee (Section 10-20.40.120(G)(2))
  • A Comprehensive Sign Program (a master/custom sign plan, typically for a multi-tenant development) is available as an alternate compliance path with its own fee
  • Application and supporting documentation submitted per Zoning Code Section 10-20.30.020, Application Process (Planning Section / Citizen Access Portal)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Sign Permit – Permanent Sign, Each PermitCity of Flagstaff Code Title 3, Chapter 3-08, User Fees, Section 3-10-001-0001 (Planning), adopted by Ordinance 2017-16, effective August 1, 2017. Visually re-verified against the source PDF table (pdftotext -layout misaligned this exact column; confirmed $90 by rendering the ordinance page to PNG).
$90.00
Temporary SignOrdinance 2017-16, effective August 1, 2017; visually verified (pdftotext -layout had misaligned this figure with an unrelated row — confirmed $65, not the $1,140 the raw text extraction suggested).
$65.00
Comprehensive Sign ProgramOrdinance 2017-16, effective August 1, 2017; alternate master-sign-plan compliance path fee
$500.00
Reinspection FeeZoning Code Section 10-20.40.120(F)(2) references a reinspection fee 'See Appendix 2, Planning Fee Schedule' when more than one inspection is needed after a correction notice; the Appendix 2 fee schedule document itself was not located separately from the Ordinance 2017-16 Planning fee table, which does not itemize a distinct sign reinspection line
Not independently located as a specific dollar figure
Violation Fee (work without a permit)Zoning Code Section 10-20.40.120(G)(2)
2x the otherwise-required sign permit fee

Review timeline

Plan review
Not published — contact the department

How long did your Sign Permit (Permanent Sign) permit actually take in Flagstaff?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Footing (freestanding signs only)

    Required for freestanding signs, including addition of sign area to an existing sign, before/during installation

  2. 2

    Electrical (illuminated signs only)

    Required prior to placement of any illuminated sign

  3. 3

    Braces, Anchors, Supports, and Connections

    Structural connection points inspected for compliance

  4. 4

    Final

    Establishes compliance with Division 10-50.100, Sign Standards, and other applicable City codes

See the full Flagstaff inspection guide — scheduling & re-inspection fees →

Tips

  • Single-family residences and duplexes never need a sign permit — the requirement applies to commercial/business and multi-tenant signage.
  • An illuminated sign needs its own electrical permit and inspection in addition to the sign permit itself — budget for both.
  • A sign permit is void if work doesn't start within 180 days of issuance, or if work stalls for 90+ days once started.
  • Installing a sign before obtaining a permit doubles the permit fee you'll owe when caught, on top of any stop-work order.
  • Multi-tenant developments and shopping centers can use a Comprehensive Sign Program ($500) as a master sign plan instead of permitting each tenant sign individually.
  • Simply swapping the face/copy on an existing nonilluminated sign for a new tenant, with no structural or lighting changes, does not require a new sign permit.

Frequently asked questions

No. Signs on property used exclusively for a single-family residence or duplex do not require a sign permit. Source: Flagstaff Zoning Code Section 10-50.100.030(B).

A permanent sign permit is $90 per permit, a temporary sign permit is $65, and a Comprehensive Sign Program (master sign plan) is $500. Source: City of Flagstaff Code Title 3, Chapter 3-08, Section 3-10-001-0001 (Planning fee schedule), adopted by Ordinance 2017-16, effective August 1, 2017.

Flagstaff does not publish a plan-review timeline for this permit. Contact City of Flagstaff Building Safety Section (Planning & Development Services, Community Development Division) at 928-213-2000 for current turnaround.

You'll need: Sign Permit Application; Sign Construction Drawings/Plans. Depending on your project, Flagstaff may also ask for: Comprehensive Sign Program Application. See the required-documents checklist on this page for details on each.

Flagstaff requires 4 inspection(s) for a sign permit (permanent sign), in order: Footing (freestanding signs only), Electrical (illuminated signs only), Braces, Anchors, Supports, and Connections, Final. Schedule each through City of Flagstaff Building Safety Section (Planning & Development Services, Community Development Division) (928-213-2000).

Apply through City of Flagstaff Building Safety Section (Planning & Development Services, Community Development Division) at 211 W Aspen Avenue, Flagstaff, AZ 86001. Phone: 928-213-2000, email: BuildingPermits@flagstaffaz.gov. Office hours: City Hall is open 8:00 am to 4:30 pm. Commercial permit attachments too large for the portal: Commercial.BuildingPermits@flagstaffaz.gov. Inter-departmental submittals: FrontCounter@flagstaffaz.gov.. Official information: https://www.flagstaff.az.gov/494/Building-Safety.

Flagstaff, Arizona has adopted: Arizona has no mandatory statewide building code edition — cities and counties each adopt and amend their own codes (per Arizona Revised Statutes framework for municipal building regulation; no state building-code-adoption agency parallel to Montana's DLI exists). The City of Flagstaff independently administers its own Building Safety program within city limits, separate from Coconino County's building department, which handles unincorporated county areas. Source: City of Flagstaff Building Safety page (flagstaff.az.gov/494/Building-Safety) and Building Permits page.; 2018 International Building Code (IBC) — adopted by City of Flagstaff Resolution 2019-26 and Ordinance 2019-16 on June 18, 2019, effective July 19, 2019 (the '2018 Suite of Codes'). Source: City of Flagstaff 2019 Adopted Building Codes (PDF); 2018 International Residential Code (IRC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019; 2018 International Existing Building Code (IEBC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019; 2018 International Mechanical Code (IMC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019; 2018 International Plumbing Code (IPC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019 (Arizona/Flagstaff uses the IPC, not the Uniform Plumbing Code); 2018 International Fuel Gas Code (IFGC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019; 2018 International Energy Conservation Code (IECC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019; 2018 International Swimming Pool and Spa Code (ISPSC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019; 2018 International Solar Energy Provisions (ISEP) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019; a compilation of solar energy provisions from the IBC, IRC, IECC, IMC, IPC, IFC, and ISPSC; 2017 NFPA 70 / National Electrical Code (NEC) — adopted per Resolution 2019-26 / Ordinance 2019-16, effective July 19, 2019; ICC A117.1-2017, Accessible and Usable Buildings and Facilities — adopted per Resolution 2019-26 / Ordinance 2019-16; 1997 Uniform Housing Code, 1997 Uniform Administrative Code, and 1997 Uniform Code for the Abatement of Dangerous Buildings (ICBO) — retained as adopted codes per Flagstaff City Code Title 4, Chapter 4-01; All codes amended locally by Flagstaff City Code Title 4, Building Regulations (Chapters 4-01 through 4-11), on file with the City Clerk. Source: Flagstaff City Code Title 4 Building Regulations amendments document (2019 Amendments to the Adopted Codes, PDF, rev. 05/14/2019); Statewide overlay: Arizona Revised Statutes Section 9-468 sets mandatory statewide standards for solar photovoltaic and solar water heating construction permits (limits on required plan documentation, prohibits requiring a PE stamp absent a written justification, and caps solar permit fees at actual cost of issuance) — binding on the City of Flagstaff as a municipality. Source: azleg.gov ARS 9-468; Arizona Revised Statutes Sections 9-835 and 9-836 set statutory residential building-permit plan-review timeframes (Administrative Completeness Review and Substantive Review stages) that the City of Flagstaff's published review timeframes implement. Source: City of Flagstaff Residential Building Permits Plan Review Process and Timeframes (PDF). Local amendments apply — see the Flagstaff overview page for the full list.