Change of Occupancy / Certificate of Occupancy — Flagstaff, Arizona · Requirements sheet
Verified 2026-07-23 · Source: https://www.flagstaff.az.gov/DocumentCenter/View/71393/Change-of-Occupancy-and-the-Building-Codes
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Change of Occupancy / Certificate of Occupancy in Flagstaff, Arizona
Flagstaff's real local equivalent of a generic 'change of use' permit is its Change of Occupancy process: whenever a building's occupancy classification changes — regardless of whether any physical alterations are made — a Building Permit is required to assess compliance with the International Existing Building Code (IEBC) for the new occupancy, per IBC/IEBC Section 105.1, culminating in a new Certificate of Occupancy. No building or structure may be occupied or used until the Building Official issues that Certificate of Occupancy, confirming compliance with the Zoning Code and all on- and off-site improvements. This is administered by the Building Safety & Code Compliance Section using the standard Residential or Commercial Building Permit Application — there is no separate 'change of use' permit type or application form.
Verified 2026-07-23 · Source
When you need this permit
- A Building Permit is required whenever a building's occupancy classification changes, regardless of whether alterations are made to the building for the new use, to assess IEBC compliance for the new occupancy, per IBC and IEBC Section 105.1
- To confirm whether a given project is considered a Change of Occupancy, and whether a building permit / new Certificate of Occupancy is required, the applicant must contact a Building Plan Reviewer via the Plan Reviewer of the Day schedule
- No building or structure may be occupied or used until the Building Official has issued a Certificate of Occupancy and determined the building has been constructed, and all on- and off-site improvements developed, in compliance with the Zoning Code and other applicable City codes
- The standard Residential Building Permit Application or Commercial Building Permit Application is used (there is no distinct Change-of-Occupancy application form); even the Over-the-Counter Permit Application screens for this by asking 'Does the proposed work constitute a change to the occupancy classification or use of the building?' — a 'Yes' answer routes the project out of the OTC pathway into full plan review
- Temporary Certificates of Occupancy are NOT authorized for residential construction (detached single-family dwellings and duplexes), per the City's 2019 amendment to 2018 IBC 111.3 / IRC R110.1, EXCEPT: (1) when a driveway approach cannot be poured due to weather and the applicant posts a bond with the City, or (2) when the structure meets all requirements for habitable space and sanitation, in which case any unfinished items (bonus rooms, basement finishing, etc.) are annotated 'not inspected' in the inspection record at the time of Temporary CO issuance
- Applicants who move into a dwelling before receiving a Certificate of Occupancy may be evicted, as the property is posted 'NO OCCUPANCY' by the building inspector or Building Official
- Billed under the same valuation-based Building Permit Fee methodology as other Building Permits (City Council Resolution 2017-21); no separate Change-of-Occupancy or Certificate-of-Occupancy issuance fee schedule was found
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
IEBC Compliance / Plan Review
Building Plan Reviewer assesses the proposed new occupancy classification against International Existing Building Code requirements
- 2
Construction Inspections (if alterations are made)
Standard foundation/framing/MEP rough-in inspections applicable to whichever underlying Building Permit type (residential addition/remodel or commercial building permit) covers the alteration work, if any
- 3
Final / Certificate of Occupancy Inspection
Building Official confirms the building complies with the Zoning Code and all applicable City codes before issuing the new Certificate of Occupancy
See the full Flagstaff inspection guide — scheduling & re-inspection fees →
Tips
- A Change of Occupancy building permit is triggered purely by a change in occupancy classification (e.g., retail to restaurant, office to assembly) — even if no physical construction or alteration takes place.
- Always confirm with the Plan Reviewer of the Day before assuming a change in tenant or use is exempt from permitting — the City, not the applicant, determines whether a use change constitutes a Change of Occupancy.
- Temporary Certificates of Occupancy are effectively unavailable for new single-family/duplex residential construction, with only two narrow exceptions (weather-blocked driveway with a bond; a substantially complete home with unfinished items annotated 'not inspected'). Moving in before the CO is issued risks eviction and a 'NO OCCUPANCY' posting by the Building Official.
- There is no separate Change-of-Occupancy or CO-issuance fee — it is billed as a standard valuation-based Building Permit (Resolution 2017-21), so a low-valuation, non-structural use change can still trigger a real plan-review fee.
- reviewTimelineDays reflects the Commercial Building/Civil Plan Review track (15 working days Administrative Completeness Review + 50 working days Substantive Review = 65 working days overall) since a Change of Occupancy predominantly applies to commercial/business occupancy reclassifications. A rare residential change of occupancy (e.g., a duplex-to-single-family conversion) would instead fall under the Small Residential Plans track (10 + 25 = 35 working days overall). Source: City of Flagstaff Commercial Plan Review (PDF) and Residential Building Permits Plan Review Process and Timeframes (PDF).
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Flagstaff building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Flagstaff
Change of Occupancy / Certificate of Occupancy in other cities
Compare change of occupancy / certificate of occupancy fees across Arizona →
Look up this fee in a different city →