Tusayan building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Tusayan, Arizona.
Verified 2026-07-07 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Town of Tusayan: 845 Mustang Drive / PO Box 709, Tusayan, AZ 86023. Coconino County Building and Safety Division: 2500 N. Fort Valley Road, Building 1, Flagstaff, AZ 86001
- Phone
- 928-638-9909 (Town of Tusayan); 928-679-8850 (Coconino County Building and Safety)
- Office hours
- Town of Tusayan Town Hall and Coconino County Building and Safety Division: Monday-Friday, 8:00 a.m.-5:00 p.m. Applicants must first submit a completed Pre-Application Checklist to the Town of Tusayan and are strongly encouraged to schedule a pre-application meeting with the Town Manager before beginning the permit process, because multiple agencies are typically involved. Building/civil plan review and inspections are then conducted by Coconino County via its Online Permit Applications portal (co-coconino-az.smartgovcommunity.com); once County review is complete, the Town of Tusayan issues the final signed building permit. Per the Town's own published guidance: 'No construction may begin until the Town has issued its final signed building permit.'
- Website
- Official site
Inspection sequence
Applies to: Plumbing Permit
- 1
Underground/Slab
Before concrete pour — verify pipe slope, materials, cleanouts
- 2
Rough-In
After pipes installed, before walls closed
- 3
Final
Fixtures connected, water heater and gas connections verified, no leaks
Applies to: Residential Addition / Remodel / Miscellaneous Residential Permit
- 1
Foundation/Footing
Required before concrete pour for additions, performed by Coconino County
- 2
Framing
Structural connections to existing structure
- 3
Final
Completed work verified against approved plans before the Town issues its final signed permit
Applies to: Residential Building Permit (New Construction, incl. SFD / ADU / Tiny House)
- 1
Foundation/Footing
Before concrete pour; performed by Coconino County Building Inspectors under the Town-County IGA
- 2
Framing
Structural framing, connections, egress per 2018 IRC and Coconino County Building Code Amendments and Standards
- 3
Final
All work complete per approved plans; final inspection required before the Town of Tusayan will issue its final signed building permit / allow occupancy
Applies to: Electric Vehicle (EV) Charger / Charging Station Permit
- 1
Rough-In
EV charger circuit wiring and panel connections before walls are closed, per the same framework documented in this file's Electrical Permit entry.
- 2
Final
Charger installed, protections verified per 2017 NEC.
Applies to: Electrical Permit
- 1
Rough-In
Wiring, box placement, and panel connections before walls are closed
- 2
Final
Devices installed, panel labeled, protections verified per 2017 NEC
Applies to: Mechanical / HVAC Permit
- 1
Rough-In
Ductwork and equipment placement before walls closed
- 2
Final
Equipment operational, clearances and combustion air verified
Final inspection only: Demolition Permit, Re-Roofing Permit, Residential Rooftop Solar Photovoltaic (PV) Self-Issue Permit
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tusayan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Tusayan building permits
Get alerts for Tusayan
We'll email you when Tusayan's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.