Tusayan building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Tusayan, Arizona.

Verified 2026-07-07 · Source

How to schedule

Inspections are requested through the building department below.

Address
Town of Tusayan: 845 Mustang Drive / PO Box 709, Tusayan, AZ 86023. Coconino County Building and Safety Division: 2500 N. Fort Valley Road, Building 1, Flagstaff, AZ 86001
Phone
928-638-9909 (Town of Tusayan); 928-679-8850 (Coconino County Building and Safety)
Office hours
Town of Tusayan Town Hall and Coconino County Building and Safety Division: Monday-Friday, 8:00 a.m.-5:00 p.m. Applicants must first submit a completed Pre-Application Checklist to the Town of Tusayan and are strongly encouraged to schedule a pre-application meeting with the Town Manager before beginning the permit process, because multiple agencies are typically involved. Building/civil plan review and inspections are then conducted by Coconino County via its Online Permit Applications portal (co-coconino-az.smartgovcommunity.com); once County review is complete, the Town of Tusayan issues the final signed building permit. Per the Town's own published guidance: 'No construction may begin until the Town has issued its final signed building permit.'

Inspection sequence

Applies to: Commercial Building Permit

  1. 1

    Foundation/Footing

    Before concrete pour; performed by Coconino County Building Inspectors under the Town-County IGA

  2. 2

    Framing

    Structural framing, connections, and fire-resistive construction per the 2018 IBC and Coconino County Building Code Amendments and Standards; special inspections listed on the approved cover sheet are performed per the County's Special Inspection Process

  3. 3

    Final

    All work complete per approved plans, including Fire Marshal/fire-district items where applicable; final inspection required before certificate of occupancy and before the Town of Tusayan issues its final signed building permit authorization for occupancy

Applies to: Plumbing Permit

  1. 1

    Underground/Slab

    Before concrete pour — verify pipe slope, materials, cleanouts

  2. 2

    Rough-In

    After pipes installed, before walls closed

  3. 3

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: Residential Addition / Remodel / Miscellaneous Residential Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions, performed by Coconino County

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans before the Town issues its final signed permit

Applies to: Residential Building Permit (New Construction, incl. SFD / ADU / Tiny House)

  1. 1

    Foundation/Footing

    Before concrete pour; performed by Coconino County Building Inspectors under the Town-County IGA

  2. 2

    Framing

    Structural framing, connections, egress per 2018 IRC and Coconino County Building Code Amendments and Standards

  3. 3

    Final

    All work complete per approved plans; final inspection required before the Town of Tusayan will issue its final signed building permit / allow occupancy

Applies to: Commercial Tenant Improvement / Interior Commercial Remodel Permit

  1. 1

    Rough-In (trades affected by the TI scope)

    Framing/electrical/plumbing/mechanical rough inspections for altered systems before cover, performed by Coconino County under the Town-County IGA

  2. 2

    Final

    Completed TI verified against approved plans, including fire protection and hood systems where in scope, before occupancy of the tenant space

Applies to: Electric Vehicle (EV) Charger / Charging Station Permit

  1. 1

    Rough-In

    EV charger circuit wiring and panel connections before walls are closed, per the same framework documented in the Electrical Permit entry.

  2. 2

    Final

    Charger installed, protections verified per 2017 NEC.

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed, panel labeled, protections verified per 2017 NEC

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Re-inspection fees

Commercial Building Permit
Temporary Certificate of Occupancy — Commercial · Coconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Other Inspections section; Show full citationTemporary Certificate of Occupancy — Commercial · Coconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Other Inspections section; re-inspection fee for incomplete/not-ready work is $120.00; inspections outside normal business hours $50.00/hour (two-hour minimum)
$300.00

Sources & verification

Verified against official sources. Last reviewed 2026-07-07.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tusayan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Tusayan building permits

Get alerts for Tusayan

We'll email you when Tusayan's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.