Skip to main content
PermitBase

Residential Addition / Remodel / Miscellaneous Residential Permit in Tusayan, Arizona

Required for room additions, remodels, decks, ramadas, carport conversions, and other alterations to existing dwellings within Tusayan town limits. Classified by Coconino County (the processing agency under the Town-County IGA) as 'Residential Miscellaneous' or per-item unit fee categories, reviewed against the 2018 IRC and Coconino County Building Code Amendments and Standards as adopted by the Town via Ordinance 2021-03.

Verified 2026-07-07 · Source

When you need this permit

  • Building permit required for room additions, remodels, decks, and other alterations affecting structural or life-safety elements of existing dwellings
  • Town of Tusayan Pre-Application Checklist endorsement required before applying for County plan review
  • Submitted via Coconino County's Residential Miscellaneous Permit Information Sheet / Online Permit Applications portal
  • Some minor work qualifies for Coconino County's Residential Self-Issue Permit process (like-for-like replacement, service panel upgrade, certain mechanical systems) rather than full plan review — confirm eligibility with the County before submitting
  • Plans must comply with the 2018 IRC and Coconino County Building Code Amendments and Standards as adopted by the Town

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Residential Misc. (unit fee category)Coconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV — the source PDF's per-sq-ft dollar figures showed some column misalignment on text extraction (a known artifact of this document's table layout); the per-unit fee STRUCTURE (flat $/sq ft by work type) is confirmed, but exact current dollar figures for a specific project scope should be reconfirmed directly against the live PDF or by phone (928-679-8850) before quoting a number to an applicant
Flat per-item unit fee, e.g., Deck ($11.00/sq ft), Covered Deck ($22.00/sq ft), Remodel ($33.00/sq ft), Room addition under 400 sq ft with no plumbing ($49.50/sq ft), Carport Conversion ($22.00/sq ft) — figures per Coconino County's Table IV, Per Unit Permit Fees
Plan Review DepositCoconino County Building Permitting Fees schedule, Part II, Table I
Deposit tier for 'Interior residential remodels, sunrooms, patio covers and decks' category
Plan Review FeeCoconino County Building Permitting Fees schedule, Part I, Section D
65% of the calculated Building Permit Fee

Review timeline

Plan reviewTusayan’s published plan-review target
36–56 business days

How long did your Residential Addition / Remodel / Miscellaneous Residential Permit permit actually take in Tusayan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Foundation/Footing

    Required before concrete pour for additions, performed by Coconino County

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans before the Town issues its final signed permit

See the full Tusayan inspection guide — scheduling & re-inspection fees →

Tips

  • Coconino County processes residential additions/remodels for Tusayan under the same 'Residential Projects' timeframe classification as new construction on its official Permit Review Timeframes document (63 total days ceiling) — there is no separate, faster track specifically for remodels published by the County or the Town.
  • Ask Coconino County directly whether your specific scope (e.g., a straightforward deck or panel upgrade) qualifies for the County's Residential Self-Issue Permit process, which bypasses full plan review for certain like-for-like or minor work.
  • Per-item unit fees (deck, remodel, room addition, carport conversion, etc.) are billed by square footage under Coconino County's Table IV rather than by ICC valuation — confirm current dollar rates directly with the County before budgeting a project.

Frequently asked questions

Yes, for work affecting structural or life-safety elements. The permit is processed through the same Town of Tusayan Pre-Application Checklist plus Coconino County plan-review/inspection pathway as new construction, with fees billed under Coconino County's Table IV per-unit or valuation-based fee schedule depending on scope.

In Tusayan, the published Residential Misc. (unit fee category) is: Flat per-item unit fee, e.g., Deck ($11.00/sq ft), Covered Deck ($22.00/sq ft), Remodel ($33.00/sq ft), Room addition under 400 sq ft with no plumbing ($49.50/sq ft), Carport Conversion ($22.00/sq ft) — figures per Coconino County's Table IV, Per Unit Permit Fees. Additional published fees: Plan Review Deposit — Deposit tier for 'Interior residential remodels, sunrooms, patio covers and decks' category; Plan Review Fee — 65% of the calculated Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Tusayan's published plan-review target for a residential addition / remodel / miscellaneous residential permit is 36–56 business days.

You'll need: Town of Tusayan Pre-Application Checklist; Coconino County Residential Miscellaneous Permit Information Sheet / Application; Site/Plot Plan. See the required-documents checklist on this page for details on each.

Tusayan requires 3 inspection(s) for a residential addition / remodel / miscellaneous residential permit, in order: Foundation/Footing, Framing, Final. Schedule each through Town of Tusayan Engineering & Development (permit administration) with plan review and inspections performed by Coconino County Community Development Department, Building and Safety Division, under an intergovernmental agreement (928-638-9909 (Town of Tusayan); 928-679-8850 (Coconino County Building and Safety)).

Apply through Town of Tusayan Engineering & Development (permit administration) with plan review and inspections performed by Coconino County Community Development Department, Building and Safety Division, under an intergovernmental agreement at Town of Tusayan: 845 Mustang Drive / PO Box 709, Tusayan, AZ 86023. Coconino County Building and Safety Division: 2500 N. Fort Valley Road, Building 1, Flagstaff, AZ 86001. Phone: 928-638-9909 (Town of Tusayan); 928-679-8850 (Coconino County Building and Safety), email: tusayantownmanager@tusayan-az.gov (Town of Tusayan, for pre-application meetings); plansubmittals@coconino.az.gov (Coconino County Building and Safety). Office hours: Town of Tusayan Town Hall and Coconino County Building and Safety Division: Monday-Friday, 8:00 a.m.-5:00 p.m. Applicants must first submit a completed Pre-Application Checklist to the Town of Tusayan and are strongly encouraged to schedule a pre-application meeting with the Town Manager before beginning the permit process, because multiple agencies are typically involved. Building/civil plan review and inspections are then conducted by Coconino County via its Online Permit Applications portal (co-coconino-az.smartgovcommunity.com); once County review is complete, the Town of Tusayan issues the final signed building permit. Per the Town's own published guidance: 'No construction may begin until the Town has issued its final signed building permit.'. Official information: https://tusayan-az.gov/engineering-development/.

Tusayan, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities, A.R.S. Title 11 for counties). The Town of Tusayan is a small (2020 Census population 561), recently incorporated (2010) gateway town that does NOT run an independent, self-staffed building department: it adopted its own local building-code ordinance but contracted the actual plan-review and inspection FUNCTION to Coconino County via an intergovernmental agreement (IGA), retaining only final permit issuance and pre-application/zoning gatekeeping in-house. Source: Town of Tusayan Engineering & Development page (tusayan-az.gov/engineering-development/) — 'Building permits are handled through an intergovernmental agreement with Coconino County... No construction may begin until the Town has issued its final signed building permit.'; Town of Tusayan Ordinance No. 2021-03 ('AN ORDINANCE OF THE COUNCIL OF THE TOWN OF TUSAYAN, ARIZONA, ADOPTING THE CODE OF TUSAYAN, ARIZONA, BUILDINGS AND CONSTRUCTION, UNIFORM CONSTRUCTION CODES ADOPTED, ADOPTION BY REFERENCE'), passed and adopted September 22, 2021, adopts by reference: International Building Code (IBC) 2018 Edition; International Residential Code (IRC) 2018 Edition; International Mechanical Code (IMC) 2018 Edition; International Fuel Gas Code (IFGC) 2018 Edition; International Plumbing Code (IPC) 2018 Edition; International Energy Conservation Code (IECC) 2018 Edition; International Existing Building Code (IEBC) 2018 Edition; International Swimming Pool and Spa Code (ISPSC) 2018 Edition; National Electrical Code (NEC) 2017 Edition (as published by the National Fire Protection Association); AND the Coconino County Building Code Amendments and Standards dated June 18, 2019 — all adopted by reference in full. This is the identical 2018 ICC suite / 2017 NEC combination that Coconino County's own Building Division uses countywide, confirming Tusayan's code baseline is deliberately harmonized with the County's rather than independently authored. Source: Town of Tusayan Ordinance No. 2021-03 (PDF, scanned/rendered and read directly, tusayan-az.gov/wp-content/uploads/2021/10/Ordinance-2021-03.pdf), Section I.; Ordinance 2021-03 also repeals and replaces Sections 1-10, Parts X-XII of the Coconino County Building Code Amendments and Standards (June 18, 2019) with a 'New Amendment: INNOVATIVE MATERIALS AND SYSTEMS PILOT PROGRAM, Sections 1-28' — mirroring Coconino County's own 'Innovative Materials and Systems Pilot Program' that allows owner-builders to seek an exemption from standard code provisions for alternative building methods/materials under certain circumstances. Source: Town of Tusayan Ordinance No. 2021-03, Section I; Coconino County Building Codes, Ordinances, Design Criteria page (coconino.az.gov/2391/Building-Codes-Ordinances-Design-Criteri), '2019-10 Coconino County Building Ordinance.'; As of July 2026, Coconino County's own Building Division still lists the 2018 International Code Council suite (IRC, IBC, IMC, IFGC, IPC, IECC, IEBC) plus the 2017 NEC as its CURRENT adopted codes (per the County's 'Current Codes and Ordinances' list), adopted via County Ordinance 2019-10. The County has begun a public process (open house held March 23, 2026) toward adopting the 2024 ICC suite and 2023 NEC, but as of this record's lastVerified date that update had NOT yet been formally adopted — the 2018/2017 baseline remains controlling for both the County and, by Ordinance 2021-03's adoption-by-reference, for Tusayan. Source: Coconino County Building Codes, Ordinances, Design Criteria page (coconino.az.gov/2391/Building-Codes-Ordinances-Design-Criteri), 'Current Codes and Ordinances' and 'Building Code Adoption' sections.; Town of Tusayan Zoning Code, Chapter 9, §9.3(B): 'A building permit, as required by the Building Code, shall be obtained prior to the construction, reconstruction, alteration or change in use of any building or other structure' — the Zoning Code's own building-permit trigger clause, applicable in the G (General), AR (Agricultural-Residential), and RR (Rural Residential) zones. Source: Town of Tusayan Zoning Code § 9.3, Property Development Standards: G, AR and RR Zones (codelibrary.amlegal.com/codes/tusayan/latest/tusayan_az_zone/0-0-0-3764).; Manufactured homes and factory-built buildings are licensed and permitted through a joint state/local structure: the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) sets manufacturer/installer/retailer licensing and issues State/IGA installation permits, while local site/foundation/utility compliance for a manufactured home placed within Tusayan town limits is handled through the same Town-Coconino County IGA building-permit pathway as other structures. Source: Coconino County Online Permit Applications page (coconino.az.gov/2390/Online-Permit-Applications), 'Manufactured Homes and Factory Built Projects' section; Coconino County Building Permitting Fees PDF, Part III, 'Manufactured Homes and Factory Built Building Permit Fees.'; Applicants must first submit a Pre-Application Checklist to the Town of Tusayan and receive the Town's endorsement before proceeding to civil or building permit review; the Town strongly encourages scheduling a pre-application meeting with the Town Manager given the number of agencies potentially involved (Coconino County Community Development, Coconino County Flood Control District, Tusayan Sanitary District, Tusayan Fire District, Arizona State Fire Marshal, Grand Canyon Unified School District). Source: Town of Tusayan Engineering & Development page; Town of Tusayan Pre-Application Checklist (tusayan-az.gov/wp-content/uploads/2025/10/Town-of-Tusayan-Pre-Applicaton-Checklist-103025.pdf).. Local amendments apply — see the Tusayan overview page for the full list.