Electric Vehicle (EV) Charger / Charging Station Permit in Tusayan, Arizona

Coconino County's Building Permitting Fees schedule (effective 09/01/2021), which governs Tusayan permits processed under the Town-County IGA, has no dedicated EV charger/EVSE line item. Installing an EV charging station is electrical work, governed by the 2017 NEC as adopted by both the Town (Ordinance 2021-03) and the County, and billed under the same general 'Fee to Issue Electrical Permit' structure documented in this file's Electrical Permit entry — a $50.00 base fee to issue plus per-unit/per-ampere-tier add-ons.

Verified 2026-07-20 · Source

When you need this permit

  • Town of Tusayan Pre-Application Checklist endorsement required before County-side review, per the same process documented in this file's Electrical Permit entry
  • Coconino County Building/Electrical Permit Application submitted via the Online Permit Applications (SmartGov) portal
  • Governed by the 2017 NEC as adopted by the Town of Tusayan (Ordinance 2021-03) and Coconino County, including NEC Article 625 (Electric Vehicle Power Transfer System)
  • A straightforward EV charger circuit addition may qualify for Coconino County's Residential Self-Issue Permit track rather than full plan review, per the same allowance documented in this file's Electrical Permit entry
  • No Tusayan-specific or Coconino-County-specific EV charger application, checklist, or fee line distinct from the general Electrical Permit mechanism was found published as of 2026-07-20 — a genuine documentation gap, not an inferred figure

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Fee to Issue Electrical PermitCoconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV, Electrical section — same general fee structure documented in this file's Electrical Permit entry; no EV-charger-specific line item exists, and exact current per-unit dollar figures should be reconfirmed directly with the County (928-679-8850) before quoting a specific number.
$50.00 base fee to issue, plus per-unit charges (e.g., service equipment billed per ampere tier, appliance/motor-driven equipment outlets billed per unit)
Plan Review Fee (where plan review is required)Coconino County Building Permitting Fees schedule, Part I, Section D
65% of the calculated permit fee

Review timeline

Plan reviewTusayan’s published plan-review target
36–56 business days

How long did your Electric Vehicle (EV) Charger / Charging Station Permit permit actually take in Tusayan?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    EV charger circuit wiring and panel connections before walls are closed, per the same framework documented in this file's Electrical Permit entry.

  2. 2

    Final

    Charger installed, protections verified per 2017 NEC.

See the full Tusayan inspection guide — scheduling & re-inspection fees →

Tips

  • There is no dedicated Tusayan/Coconino County EV charger fee — it is billed under the same $50.00 base 'Fee to Issue Electrical Permit' plus per-unit add-ons documented in this file's Electrical Permit entry.
  • Ask Coconino County whether a straightforward EV charger circuit addition qualifies for the Residential Self-Issue Permit process, which can bypass the full 36-56 business day plan-review timeline.

Frequently asked questions

Tusayan requires an electric vehicle (ev) charger / charging station permit for: Town of Tusayan Pre-Application Checklist endorsement required before County-side review, per the same process documented in this file's Electrical Permit entry; Coconino County Building/Electrical Permit Application submitted via the Online Permit Applications (SmartGov) portal; Governed by the 2017 NEC as adopted by the Town of Tusayan (Ordinance 2021-03) and Coconino County, including NEC Article 625 (Electric Vehicle Power Transfer System); A straightforward EV charger circuit addition may qualify for Coconino County's Residential Self-Issue Permit track rather than full plan review, per the same allowance documented in this file's Electrical Permit entry; No Tusayan-specific or Coconino-County-specific EV charger application, checklist, or fee line distinct from the general Electrical Permit mechanism was found published as of 2026-07-20 — a genuine documentation gap, not an inferred figure. If your project isn't listed, confirm with Town of Tusayan Engineering & Development (permit administration) with plan review and inspections performed by Coconino County Community Development Department, Building and Safety Division, under an intergovernmental agreement at 928-638-9909 (Town of Tusayan); 928-679-8850 (Coconino County Building and Safety) before starting work.

There is no dedicated EV charger fee line. It is billed under Coconino County's general 'Fee to Issue Electrical Permit' structure — a $50.00 base fee plus per-unit/per-ampere-tier add-ons — the same mechanism used for all other electrical work processed under the Town-County IGA.

Tusayan's published plan-review target for an electric vehicle (ev) charger / charging station permit is 36–56 business days.

You'll need: Town of Tusayan Pre-Application Checklist; Coconino County Building/Electrical Permit Application. See the required-documents checklist on this page for details on each.

Tusayan requires 2 inspection(s) for an electric vehicle (ev) charger / charging station permit, in order: Rough-In, Final. Schedule each through Town of Tusayan Engineering & Development (permit administration) with plan review and inspections performed by Coconino County Community Development Department, Building and Safety Division, under an intergovernmental agreement (928-638-9909 (Town of Tusayan); 928-679-8850 (Coconino County Building and Safety)).

Apply through Town of Tusayan Engineering & Development (permit administration) with plan review and inspections performed by Coconino County Community Development Department, Building and Safety Division, under an intergovernmental agreement at Town of Tusayan: 845 Mustang Drive / PO Box 709, Tusayan, AZ 86023. Coconino County Building and Safety Division: 2500 N. Fort Valley Road, Building 1, Flagstaff, AZ 86001. Phone: 928-638-9909 (Town of Tusayan); 928-679-8850 (Coconino County Building and Safety), email: tusayantownmanager@tusayan-az.gov (Town of Tusayan, for pre-application meetings); plansubmittals@coconino.az.gov (Coconino County Building and Safety). Office hours: Town of Tusayan Town Hall and Coconino County Building and Safety Division: Monday-Friday, 8:00 a.m.-5:00 p.m. Applicants must first submit a completed Pre-Application Checklist to the Town of Tusayan and are strongly encouraged to schedule a pre-application meeting with the Town Manager before beginning the permit process, because multiple agencies are typically involved. Building/civil plan review and inspections are then conducted by Coconino County via its Online Permit Applications portal (co-coconino-az.smartgovcommunity.com); once County review is complete, the Town of Tusayan issues the final signed building permit. Per the Town's own published guidance: 'No construction may begin until the Town has issued its final signed building permit.'. Official information: https://tusayan-az.gov/engineering-development/.

Tusayan, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/county authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities, A.R.S. Title 11 for counties). The Town of Tusayan is a small (2020 Census population 561), recently incorporated (2010) gateway town that does NOT run an independent, self-staffed building department: it adopted its own local building-code ordinance but contracted the actual plan-review and inspection FUNCTION to Coconino County via an intergovernmental agreement (IGA), retaining only final permit issuance and pre-application/zoning gatekeeping in-house. Source: Town of Tusayan Engineering & Development page (tusayan-az.gov/engineering-development/) — 'Building permits are handled through an intergovernmental agreement with Coconino County... No construction may begin until the Town has issued its final signed building permit.'; Town of Tusayan Ordinance No. 2021-03 ('AN ORDINANCE OF THE COUNCIL OF THE TOWN OF TUSAYAN, ARIZONA, ADOPTING THE CODE OF TUSAYAN, ARIZONA, BUILDINGS AND CONSTRUCTION, UNIFORM CONSTRUCTION CODES ADOPTED, ADOPTION BY REFERENCE'), passed and adopted September 22, 2021, adopts by reference: International Building Code (IBC) 2018 Edition; International Residential Code (IRC) 2018 Edition; International Mechanical Code (IMC) 2018 Edition; International Fuel Gas Code (IFGC) 2018 Edition; International Plumbing Code (IPC) 2018 Edition; International Energy Conservation Code (IECC) 2018 Edition; International Existing Building Code (IEBC) 2018 Edition; International Swimming Pool and Spa Code (ISPSC) 2018 Edition; National Electrical Code (NEC) 2017 Edition (as published by the National Fire Protection Association); AND the Coconino County Building Code Amendments and Standards dated June 18, 2019 — all adopted by reference in full. This is the identical 2018 ICC suite / 2017 NEC combination that Coconino County's own Building Division uses countywide, confirming Tusayan's code baseline is deliberately harmonized with the County's rather than independently authored. Source: Town of Tusayan Ordinance No. 2021-03 (PDF, scanned/rendered and read directly, tusayan-az.gov/wp-content/uploads/2021/10/Ordinance-2021-03.pdf), Section I.; Ordinance 2021-03 also repeals and replaces Sections 1-10, Parts X-XII of the Coconino County Building Code Amendments and Standards (June 18, 2019) with a 'New Amendment: INNOVATIVE MATERIALS AND SYSTEMS PILOT PROGRAM, Sections 1-28' — mirroring Coconino County's own 'Innovative Materials and Systems Pilot Program' that allows owner-builders to seek an exemption from standard code provisions for alternative building methods/materials under certain circumstances. Source: Town of Tusayan Ordinance No. 2021-03, Section I; Coconino County Building Codes, Ordinances, Design Criteria page (coconino.az.gov/2391/Building-Codes-Ordinances-Design-Criteri), '2019-10 Coconino County Building Ordinance.'; As of July 2026, Coconino County's own Building Division still lists the 2018 International Code Council suite (IRC, IBC, IMC, IFGC, IPC, IECC, IEBC) plus the 2017 NEC as its CURRENT adopted codes (per the County's 'Current Codes and Ordinances' list), adopted via County Ordinance 2019-10. The County has begun a public process (open house held March 23, 2026) toward adopting the 2024 ICC suite and 2023 NEC, but as of this record's lastVerified date that update had NOT yet been formally adopted — the 2018/2017 baseline remains controlling for both the County and, by Ordinance 2021-03's adoption-by-reference, for Tusayan. Source: Coconino County Building Codes, Ordinances, Design Criteria page (coconino.az.gov/2391/Building-Codes-Ordinances-Design-Criteri), 'Current Codes and Ordinances' and 'Building Code Adoption' sections.; Town of Tusayan Zoning Code, Chapter 9, §9.3(B): 'A building permit, as required by the Building Code, shall be obtained prior to the construction, reconstruction, alteration or change in use of any building or other structure' — the Zoning Code's own building-permit trigger clause, applicable in the G (General), AR (Agricultural-Residential), and RR (Rural Residential) zones. Source: Town of Tusayan Zoning Code § 9.3, Property Development Standards: G, AR and RR Zones (codelibrary.amlegal.com/codes/tusayan/latest/tusayan_az_zone/0-0-0-3764).; Manufactured homes and factory-built buildings are licensed and permitted through a joint state/local structure: the Arizona Department of Fire, Building and Life Safety (Office of Manufactured Housing) sets manufacturer/installer/retailer licensing and issues State/IGA installation permits, while local site/foundation/utility compliance for a manufactured home placed within Tusayan town limits is handled through the same Town-Coconino County IGA building-permit pathway as other structures. Source: Coconino County Online Permit Applications page (coconino.az.gov/2390/Online-Permit-Applications), 'Manufactured Homes and Factory Built Projects' section; Coconino County Building Permitting Fees PDF, Part III, 'Manufactured Homes and Factory Built Building Permit Fees.'; Applicants must first submit a Pre-Application Checklist to the Town of Tusayan and receive the Town's endorsement before proceeding to civil or building permit review; the Town strongly encourages scheduling a pre-application meeting with the Town Manager given the number of agencies potentially involved (Coconino County Community Development, Coconino County Flood Control District, Tusayan Sanitary District, Tusayan Fire District, Arizona State Fire Marshal, Grand Canyon Unified School District). Source: Town of Tusayan Engineering & Development page; Town of Tusayan Pre-Application Checklist (tusayan-az.gov/wp-content/uploads/2025/10/Town-of-Tusayan-Pre-Applicaton-Checklist-103025.pdf).. Local amendments apply — see the Tusayan overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-20.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tusayan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.