Demolition Permit — Tusayan, Arizona · Requirements sheet
Verified 2026-07-07 · Source: https://www.coconino.az.gov/2390/Online-Permit-Applications
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Demolition Permit in Tusayan, Arizona
Required for demolition of any residential or commercial structure (or manufactured home) within Tusayan town limits, per Coconino County's published unit-fee schedule (applied to Tusayan permits under the Town-County IGA). Governed by the 2018 IBC as adopted by the Town via Ordinance 2021-03.
Verified 2026-07-07 · Source
When you need this permit
- Building permit required before demolishing a residential or commercial structure or manufactured home within Tusayan town limits, per Coconino County's Table IV unit-fee category ('Demolition of an existing building or manufactured home')
- Town of Tusayan Pre-Application Checklist endorsement required before County-side review
- All utilities must be terminated/coordinated at the property line before demolition
- Submitted via Coconino County's Online Permit Applications (SmartGov) portal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 2 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Coconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV. Show full citationHide
Coconino County Building Permitting Fees schedule (effective 09/01/2021), Table IV. The schedule carries a dedicated demolition unit-fee category, but this document's table layout does not copy and paste cleanly, so read the amount from the page as published — or confirm it by phone (928-679-8850) — before quoting a specific numberReview timeline
Inspection process
- 1
Final
Verifies utility termination and site condition after demolition is complete
See the full Tusayan inspection guide — scheduling & re-inspection fees →
Tips
- As with all Tusayan permits, the Town's Pre-Application Checklist step precedes Coconino County's demolition-permit review.
- Confirm whether Coconino County Air Quality/environmental clearance (asbestos survey, NESHAP notification) applies to your specific structure before demolition; no Tusayan- or Coconino-specific published demolition checklist beyond the base fee-schedule unit-fee category was found.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fee schedules
Applications & forms
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tusayan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Tusayan's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Tusayan yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Tusayan lands. Privacy.
Other permits in Tusayan
Demolition Permit in other cities
Compare demolition permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Tusayan project checklist
Describe your project once and get every permit, document, and fee it triggers in Tusayan — in one checklist. Free, for any city and any number of projects.
Get started →