Residential Building Permit (New Construction, incl. SFD / ADU / Tiny House) in Tusayan, Arizona
Required for new single-family dwelling, accessory dwelling unit (ADU), lot-specific model home, or Appendix-Q tiny house construction within Tusayan town limits. Reviewed against the 2018 IRC and Coconino County Building Code Amendments and Standards (June 18, 2019) as adopted by the Town via Ordinance 2021-03. Applicants must first obtain the Town's Pre-Application Checklist endorsement; plan review and inspections are then performed by Coconino County Community Development (Building and Safety Division) via its Online Permit Applications portal, after which the Town of Tusayan issues the final signed building permit.
Verified 2026-07-07 · Source
When you need this permit
- Town of Tusayan Pre-Application Checklist must be submitted and endorsed by the Town before applying for civil or building permit review; a pre-application meeting with the Town Manager is strongly recommended
- Building permit required for new single-family dwelling, ADU, lot-specific model home, or tiny house (per IRC Appendix Q) construction within Tusayan town limits, per Zoning Code § 9.3(B) and Ordinance 2021-03
- Plans must comply with the 2018 IRC and Coconino County Building Code Amendments and Standards (June 18, 2019), as adopted by reference by the Town
- Submitted via Coconino County's Online Permit Applications portal (co-coconino-az.smartgovcommunity.com); only properly rotated, unlocked PDF files are accepted for electronic plan review
- A geotechnical report (soils analysis) is recommended prior to submittal for new structures and may be required during the inspection process if not submitted upfront
- If a complete set of plans meeting the County's minimum plan requirements is not received within ten working days of the submittal date, the permit application is canceled and must be re-submitted
- Coordination with concurrent agencies is required as applicable: Coconino County Flood Control District, Tusayan Sanitary District (wastewater), Tusayan Fire District, Arizona State Fire Marshal, and Grand Canyon Unified School District
- No construction may begin until the Town of Tusayan has issued its final signed building permit, even after County plan review/approval is complete
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 6 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour; performed by Coconino County Building Inspectors under the Town-County IGA
- 2
Framing
Structural framing, connections, egress per 2018 IRC and Coconino County Building Code Amendments and Standards
- 3
Final
All work complete per approved plans; final inspection required before the Town of Tusayan will issue its final signed building permit / allow occupancy
See the full Tusayan inspection guide — scheduling & re-inspection fees →
Tips
- Tusayan does not have its own building official or in-house plan-review staff — the actual technical review and inspections are performed by Coconino County under an intergovernmental agreement; the Town's role is the Pre-Application Checklist gatekeeping step at the front end and final permit issuance at the back end. Budget time for BOTH steps, not just the County's review.
- Per Coconino County Community Development Substantive Policy 2025-01 (effective 4/28/25, updated 5/29/26), which SUPERSEDES the older June 2020 Permit Review Timeframes document this file previously cited: the governing timeline for Residential Building/Engineering permits is 36 days total (15 business days intake + 21 calendar days substantive review). However, the department own current homepage notice states that, due to staffing and permitting volume, Building and Engineering permits are currently on a 6-to-8-week (42-56 day) review timeline. This reviewTimelineDays range (36-56) reflects the formal 36-day policy target as the min and the department own published real-world ceiling (56 days = 8 weeks) as the max — both are governing, cited figures, not estimates. This 36-56 day range is the County process Tusayan contracts its plan review to; the Town own separate Pre-Application Checklist gatekeeping step at the front end is NOT included in this range — budget time for both steps.
- If a building application remains administratively incomplete for 10 days, Coconino County denies it as incomplete and all deposits become non-refundable — get a complete submittal in on the first attempt.
- Issued permits are valid for 180 days (resetting with each completed inspection); permits not picked up/paid for within 180 days of notification are deemed 'ABANDONED' per IRC § R105.3.2 as adopted.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tusayan building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tusayan
Residential Building Permit (New Construction, incl. SFD / ADU / Tiny House) in other cities
Look up this fee in a different city →
Now live
Build your Tusayan project checklist
Describe your project once and get every permit, document, and fee it triggers in Tusayan — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →