Unincorporated Gila County building inspections
VerifiedInspection sequence, scheduling, and re-inspection fees for building permits in Unincorporated Gila County, Arizona.
Verified 2026-07-23 · Source
How to schedule
Inspections are requested through the building department below.
- Address
- Globe Office: 745 N. Rose Mofford Way, Globe, AZ 85501; Payson Office: 608 E. Hwy 260, Payson, AZ 85541
- Phone
- Globe: 928-402-4224 (press option for permitting); Payson: 928-474-7110 (press option for permitting)
- Office hours
- County offices generally Monday–Friday, 8am–5pm (per county-wide footer hours at gilacountyaz.gov). Plans can be submitted EITHER by e-mail as PDF documents to the Building Safety address, OR in person at the Globe or Payson office — the Building Safety page states both routes. Plan review payments accepted by credit/debit card by phone (3% service fee added), cash, or check payable to Gila County. Globe: 45 N. Rose Mofford Way, 928-402-4224. Payson: 608 E. Hwy 260, 928-474-7110. Chief Building Official: Randy Pluimer. NOTE: the County's separate FAQ page still carries older wording stating applications 'must be made IN PERSON' and 'cannot be accepted by fax or mail'; where the two disagree, the Building Safety department's own page (which allows e-mail submittal) is the operative one, and the discrepancy is recorded rather than silently resolved.
- Website
- Official site
Inspection sequence
Applies to: Commercial Building Permit (New Construction, Tenant Improvement, Remodel)
- 1
Foundation/Footing
Before concrete pour, per 2012 IBC
- 2
Framing / Structural
After structural framing complete, before wall cover
- 3
Final
All work complete per approved plans
Applies to: Pool / Spa / Hot Tub Permit
- 1
Steel / Shell (Pre-gunite)
Verify rebar, rough plumbing, and pool shell before gunite/shotcrete application
- 2
Barrier Inspection
Pool barrier inspected and approved per adopted code barrier requirements
- 3
Final
All work complete; pool filled; equipment operational; barrier fully in place
Applies to: Residential Building Permit (New Construction, Addition, Remodel, Accessory Structure)
- 1
Foundation/Footing
Before concrete pour — verify footing depth, dimensions, and reinforcement per 2012 IRC/IBC
- 2
Framing
After framing and rough-in trades complete, before insulation or wall cover
- 3
Final
All work complete per approved plans; call either the Globe or Payson office to schedule
Applies to: Change of Use / Change of Occupancy Permit
- 1
Plan review / code compliance evaluation
The proposed new occupancy is evaluated against the adopted 2012 International Existing Building Code before permit issuance
- 2
Final
Building inspections are performed by County staff; call the Globe or Payson office to schedule
Applies to: Electrical Permit
- 1
Rough-In / Service Inspection
After wiring installed before wall cover, or service equipment installed before energizing, per 2011 NEC
- 2
Final
All electrical work complete and operational
Applies to: EV Charger / EVSE Permit
- 1
Rough-In / Service Inspection
Wiring, disconnects, and service equipment inspected before concealment or energizing, per 2011 NEC
- 2
Final
EVSE equipment installed and operational; connection point verified
Applies to: Manufactured Home / Factory Built Building Permit
- 1
Set-Up Inspection
Verify manufactured home installation (blocking, tie-downs, skirting, utility connections) per Arizona Office of Manufactured Housing standards
- 2
Electrical Green Tag
Electric service inspection; requires a Discharge Authorization for the wastewater system to be on file first
Applies to: Mechanical / HVAC Permit
- 1
Rough-In / Equipment
Equipment installed and ductwork complete before wall cover or concealment, per 2012 IMC
- 2
Final
Equipment operational; combustion air and venting verified
Applies to: Plumbing Permit
- 1
Rough-In
Before concealing piping, per 2012 IPC
- 2
Final
All plumbing work complete and operational
Applies to: Sign Permit
- 1
Footing / foundation (freestanding signs)
Sign foundation and anchorage inspected before concealment, per the adopted 2012 IBC as administered by the Gila County Building Safety Division
- 2
Final
Sign as installed inspected for compliance with the approved permit and the Zoning Ordinance Section 103.6 standards
Applies to: Solar PV Permit
- 1
Rough-In / Service Inspection
Wiring, disconnects, and service equipment inspected before concealment or energizing, per 2011 NEC
- 2
Final
PV system complete and operational; interconnection point verified
Re-inspection fees
Sources & verification
Verified against official sources. Last reviewed 2026-07-23.
Fee schedules
Applications & forms
Online permit portal
Codes & ordinances
Department & other records
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Gila County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Gila County building permits
Get alerts for Unincorporated Gila County
We'll email you when Unincorporated Gila County's fees, documents, or codes change — not often.
We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.