EV Charger / EVSE Permit — Unincorporated Gila County, Arizona · Requirements sheet
Verified 2026-07-20 · Source: https://cms3.revize.com/revize/gilacounty/government/community_development/Docs/Docs/FEESCHEDULE%2012-2019.pdf
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
EV Charger / EVSE Permit in Unincorporated Gila County, Arizona
Gila County's published Fee Schedule (rev. 12-2019) has no dedicated EV-charger/EVSE fee line item. Installing a Level 2 or DC fast EV charger's dedicated circuit or new service in unincorporated Gila County is processed as a standard Electrical Permit under the county's adopted 2011 NEC, billed via the same Unit Fee Schedule used for other electrical alterations to an existing building (the System Fee Schedule's per-square-foot rate applies only to new residential building wiring, not retrofits). The Gila County Community Development Fee Schedule PDF (rev. 12-2019, cms3.revize.com/revize/gilacounty/.../FEESCHEDULE%2012-2019.pdf) remains the county's real, current, published fee mechanism. No EV-specific line item exists, but the $25.00 Electrical Permit issuance fee is a genuine, citable, currently-applicable governing figure.
Verified 2026-07-20 · Source
When you need this permit
- Electrical Permit required for the EV charger's dedicated circuit or service work, per the county's adopted 2011 NEC — apply in person at the Globe or Payson Building Safety office
- No distinct 'EV charger permit' exists in the county's Fee Schedule; per the schedule's own text, alterations to existing residential buildings use the Unit Fee Schedule (per-service/per-item fees) rather than the new-construction per-square-foot System Fee Schedule
- If the electrical work is part of a permitted residential building project (e.g., new home pre-wired for a charger), it is included in the building permit fee at no additional charge
- Applications must be made IN PERSON at the Globe (745 N. Rose Mofford Way) or Payson (608 E. Hwy 260) Building Safety office — no online portal identified
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Gila County Community Development Fee Schedule (rev. Show full citationHide
Gila County Community Development Fee Schedule (rev. 12-2019), Electrical Permit Fees, p.6. Re-checked the fee schedule PDF on 2026-07-20 specifically for 'EV', 'electric vehicle', or 'EVSE' language — none exists; an EV charger circuit retrofit is not a listed System Fee Schedule item (that per-square-foot rate applies only to New Residential Buildings), so it falls to the Unit Fee Schedule / Other Inspections and Fees section on the same page, the same treatment this database's solar-pv-permit entry for Gila County documents for a solar retrofit.Review timeline
Inspection process
- 1
Rough-In / Service Inspection
Wiring, disconnects, and service equipment inspected before concealment or energizing, per 2011 NEC
- 2
Final
EVSE equipment installed and operational; connection point verified
See the full Unincorporated Gila County inspection guide — scheduling & re-inspection fees →
Tips
- Gila County's Fee Schedule (rev. 12-2019) contains no dedicated EV charger permit line item — confirm the exact billing method (service fee vs. outlet fee) with the Globe or Payson office before budgeting.
- If the EV charger circuit is bundled with a broader residential building permit (e.g., new construction pre-wired for a charger), it is included in the building permit fee at no additional charge, the same as other residential electrical work.
- : the Gila County Fee Schedule (rev. 12-2019) PDF is live and the $25.00 Electrical Permit issuance fee remains the governing figure for an EV charger circuit — no EV-specific line item exists.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-20.
Fee schedules
Online permit portal
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Gila County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Unincorporated Gila County's permit history isn't searchable here yet
This page covers what the permit requires. What we don't have for Unincorporated Gila County yet is the record of permits actually issued — the history you'd search by street address. That is a gap in our coverage, not a statement about any particular property.
Your email, and the place — never an address. We only use it to tell you when Unincorporated Gila County lands. Privacy.
Other permits in Unincorporated Gila County
EV Charger / EVSE Permit in other cities
Compare ev charger / evse permit fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Unincorporated Gila County project checklist
Describe your project once and get every permit, document, and fee it triggers in Unincorporated Gila County — in one checklist. Free, for any city and any number of projects.
Get started →