Commercial Building Permit (New Construction, Tenant Improvement, Remodel) — Unincorporated Gila County, Arizona · Requirements sheet
Verified 2026-07-07 · Source: https://www.gilacountyaz.gov/government/community_development/building_safety/government/community_development/buildingpermits.php
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Commercial Building Permit (New Construction, Tenant Improvement, Remodel) in Unincorporated Gila County, Arizona
Required for new commercial, industrial, and multi-family buildings, tenant improvements, and remodels in the unincorporated areas of Gila County. The Building Safety Department applies its adopted 2012 IBC with local amendments. Applications are submitted in person at either the Globe or Payson office, using the Commercial Construction Permit Requirements checklist.
Verified 2026-07-07 · Source
When you need this permit
- Required for new commercial, industrial, and multi-family construction, tenant improvements, and remodels in unincorporated Gila County
- Application must be made IN PERSON at the Globe office (745 N. Rose Mofford Way) or Payson office (608 E. Hwy 260)
- Refer to the Commercial Construction Permit Requirements checklist for the full document list
- Two sets of plans meeting county design criteria, including 2 site plans, are required for review
- Wastewater, Floodplain, and other department approvals may be required before a building permit can be issued
- Plan review fee (65% of the calculated building permit fee) collected at time of submittal
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29 →
Fee schedule
Review timeline
Inspection process
- 1
Foundation/Footing
Before concrete pour, per 2012 IBC
- 2
Framing / Structural
After structural framing complete, before wall cover
- 3
Final
All work complete per approved plans
See the full Unincorporated Gila County inspection guide — scheduling & re-inspection fees →
Tips
- Unlike residential, commercial electrical/plumbing/mechanical permits are billed separately per their own fee schedules rather than bundled into the building permit fee.
- Commercial submittals follow the same 15-working-day first-review goal as residential, with up to 5 additional administrative-review days possible.
- Confirm whether Wastewater or Floodplain approval is required before submitting — these can be prerequisites to building permit issuance.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-07-07.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Gila County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
This one’s complicated · Get an expediter
Tell us about your project and we’ll connect you with a permit expediter who works in Unincorporated Gila County.
PermitBase may receive a referral fee from the expediter. This is a service introduction, not verified permit data or legal advice.
Other permits in Unincorporated Gila County
Commercial Building Permit (New Construction, Tenant Improvement, Remodel) in other cities
Look up this fee in a different city →