Electrical Permit in Unincorporated Gila County, Arizona

Required for standalone electrical work in unincorporated Gila County, under the county's adopted 2011 NEC. Electrical work performed as part of a permitted building project is included in the building permit fee at no extra charge; standalone/individual electrical permits are billed per the county's unit fee schedule.

Verified 2026-07-23 · Source

When you need this permit

  • Standalone electrical permits required for services, feeders, meters, outlets, fixtures, signs, and related electrical work not part of a currently permitted building project
  • Apply in person at the Globe or Payson Building Safety office
  • Contact either office for guidance on obtaining an Electrical permit

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Permit issuance feeGila County Community Development Fee Schedule, Electrical Permit Fees, p.6.
$25.00 per permit
New single/two-family residential wiring (System Fee Schedule)Gila County Community Development Fee Schedule, p.6. New multifamily (3+ units): $0.050 per sq ft.
$0.055 per square foot (not including garages, carports, and other minor accessory buildings)
Private in-ground swimming pool electrical (System Fee Schedule)Gila County Community Development Fee Schedule, p.6. Covers branch circuit wiring, bonding, grounding, and underwater lighting for the pool system.
$30.00 per pool
Unit Fee Schedule — outlets/switches/fixturesGila County Community Development Fee Schedule, p.6.
First 20 outlets: $1.00 each; additional outlets: $0.50 each
Unit Fee Schedule — servicesGila County Community Development Fee Schedule, p.6.
≤200A: $25.00; over 200A to 1000A: $50.00; over 1000A: $100.00
Individual electrical permit bundled with a building permitGila County Community Development Fee Schedule, p.2. Commercial/multi-family electrical is billed separately per the schedule above.
No charge (included in the cost of the building permit) — residential only

Review timeline

Plan review
Not published — contact the department

How long did your Electrical Permit permit actually take in Unincorporated Gila County?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In / Service Inspection

    After wiring installed before wall cover, or service equipment installed before energizing, per 2011 NEC

  2. 2

    Final

    All electrical work complete and operational

See the full Unincorporated Gila County inspection guide — scheduling & re-inspection fees →

Tips

  • If the electrical work is part of a permitted residential building project, it is included in the building permit fee — do not pay for a separate electrical permit for the same scope.
  • Call the Globe or Payson office directly for the most current guidance on obtaining a standalone electrical permit; the county directs residents to call rather than self-serve online for this permit type.

Frequently asked questions

Unincorporated Gila County requires an electrical permit for: Standalone electrical permits required for services, feeders, meters, outlets, fixtures, signs, and related electrical work not part of a currently permitted building project; Apply in person at the Globe or Payson Building Safety office; Contact either office for guidance on obtaining an Electrical permit. If your project isn't listed, confirm with Gila County Community Development Division — Building Safety at Globe: 928-402-4224 (press option for permitting); Payson: 928-474-7110 (press option for permitting) before starting work.

In Unincorporated Gila County, the published Permit issuance fee is: $25.00 per permit. Additional published fees: New single/two-family residential wiring (System Fee Schedule) — $0.055 per square foot (not including garages, carports, and other minor accessory buildings); Private in-ground swimming pool electrical (System Fee Schedule) — $30.00 per pool; Unit Fee Schedule — outlets/switches/fixtures — First 20 outlets: $1.00 each; additional outlets: $0.50 each; Unit Fee Schedule — services — ≤200A: $25.00; over 200A to 1000A: $50.00; over 1000A: $100.00; Individual electrical permit bundled with a building permit — No charge (included in the cost of the building permit) — residential only. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Unincorporated Gila County does not publish a plan-review timeline for this permit. Contact Gila County Community Development Division — Building Safety at Globe: 928-402-4224 (press option for permitting); Payson: 928-474-7110 (press option for permitting) for current turnaround.

You'll need: In-person permit application. See the required-documents checklist on this page for details on each.

Unincorporated Gila County requires 2 inspection(s) for an electrical permit, in order: Rough-In / Service Inspection, Final. Schedule each through Gila County Community Development Division — Building Safety (Globe: 928-402-4224 (press option for permitting); Payson: 928-474-7110 (press option for permitting)).

Apply through Gila County Community Development Division — Building Safety at Globe Office: 745 N. Rose Mofford Way, Globe, AZ 85501; Payson Office: 608 E. Hwy 260, Payson, AZ 85541. Phone: Globe: 928-402-4224 (press option for permitting); Payson: 928-474-7110 (press option for permitting), email: Contact via Globe or Payson office phone lines listed above; the county's Building Safety page lists an obfuscated contact-form email rather than a plain address. Office hours: County offices generally Monday–Friday, 8am–5pm (per county-wide footer hours at gilacountyaz.gov). Building applications must be made IN PERSON at either the Globe or Payson Building Safety office — applications and plans cannot be accepted by fax or mail. Plan review payments accepted by credit/debit card by phone (3% service fee added), cash, or check payable to Gila County. Chief Building Official: Randy Pluimer.. Official information: https://www.gilacountyaz.gov/government/community_development/building_safety/index.php.

Unincorporated Gila County, Arizona has adopted: Arizona has NO statewide mandatory building code for general construction — code adoption is a per-jurisdiction (city/town/county) authority under state enabling statutes (A.R.S. § 11-861 for county adoption by reference). Gila County's Community Development Division / Building Safety Department independently adopts and administers construction codes for all unincorporated areas of the county; incorporated cities and towns within Gila County (Globe, Payson, Winkelman, Miami, Hayden, Star Valley) adopt and enforce their own codes separately and are not covered by this county program. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/index.php; Building Code of the County of Gila, effective October 2, 2014, adopted by the Gila County Board of Supervisors via Building Code Ordinance No. 2017-02 ('Building Ordinance for Unincorporated Areas in Gila County'), which superseded the prior Building Code Ordinance effective July 28, 2011. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/adopted_building_code.php and ordinance PDF at https://www.gilacountyaz.gov/government/community_development/Docs/Docs/Building%20Ordinance%20for%20Unincorporated%20Areas%20in%20Gila%20County%20-%20Ordinance%20No.%202017-02%20-%20Approved.pdf; 2012 International Residential Code (IRC) for One- and Two-Family Dwellings, adopted by reference with Gila County amendments (per Building Code Ordinance No. 2017-02). Source: https://www.gilacountyaz.gov/government/community_development/building_safety/adopted_building_code.php; 2012 International Building Code (IBC), adopted by reference with Gila County amendments. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/adopted_building_code.php; 2012 International Existing Building Code (IEBC), adopted by reference with Gila County amendments. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/adopted_building_code.php; 2012 International Fuel Gas Code (IFGC), adopted by reference with Gila County amendments. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/adopted_building_code.php; 2012 International Mechanical Code (IMC), adopted by reference with Gila County amendments. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/adopted_building_code.php; 2012 International Plumbing Code (IPC), adopted by reference with Gila County amendments. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/adopted_building_code.php; 2012 Uniform Swimming Pool, Spa & Hot Tub Code, adopted by reference with Gila County amendments. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/adopted_building_code.php; 2011 National Electrical Code (NEC), adopted by reference with Gila County amendments. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/adopted_building_code.php; ICC A117.1-2009 Accessible and Usable Buildings and Facilities (ADA accessibility standard), adopted by reference. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/adopted_building_code.php; Manufactured homes and factory-built buildings: installed per the latest Arizona Office of Manufactured Housing (Arizona Department of Housing Manufactured Housing Division) publication standards; Gila County holds a direct contract with the state to perform manufactured-home and factory-built-building permitting/inspection in the unincorporated county. Only HUD-approved manufactured homes have been permitted in unincorporated Gila County since March 22, 2007. Source: https://www.gilacountyaz.gov/government/community_development/building_safety/manufactured_home_permits.php. Local amendments apply — see the Unincorporated Gila County overview page for the full list.

No, for single-family and two-family residential projects, electrical work is included in the building permit fee at no additional charge. A standalone electrical permit is only needed for electrical work done independently of a building permit. Source: Gila County Community Development Fee Schedule (https://cms3.revize.com/revize/gilacounty/government/community_development/Docs/Docs/FEESCHEDULE%2012-2019.pdf), p.2

Sources & verification

Verified against official sources. Last reviewed 2026-07-23.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Unincorporated Gila County building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.