Queen Creek building inspections

Verified

Inspection sequence, scheduling, and re-inspection fees for building permits in Queen Creek, Arizona.

Verified 2026-07-06 · Source

How to schedule

Inspections are requested through the building department below.

Address
Municipal Services Building, 22358 S. Ellsworth Road, Queen Creek, AZ 85142
Phone
480-358-3003
Office hours
Monday - Thursday, 7 a.m. - 6 p.m.; closed Fridays (Town offices closed Friday-Sunday). Applications are submitted electronically through the Development Nexus / Accela Citizen Access online portal (aca-prod.accela.com/QC). Building inspections are scheduled through Development Nexus or by phone/text; the cutoff for next-business-day inspection requests is 6:00 p.m. Inspection hours are 6 a.m.-1:30 p.m. Mon-Thu and 6-10 a.m. Fri (September-May), and 5:30 a.m.-12 p.m. Mon-Thu and 5:30-10 a.m. Fri (June-August). Building Official: Michael Williams, CBO, Building Safety Manager, Michael.Williams@QueenCreekAZ.gov, 480-358-3009.

Published scheduling rules

  • Inspection scheduling cutoff for next-business-day service is 6:00 p.m.; requests after the cutoff move to the second business day — this is the basis for the 1-2 business day review/turnaround window on straightforward stand-alone electrical work with no plan-review step. (Electrical Permit)
  • A stand-alone AC/HVAC unit swap with no other scope change is typically a counter/portal-issued permit with an inspection-only turnaround, consistent with the Town's 1-2 business day next-business-day inspection scheduling cutoff (6:00 p.m.). (Mechanical / HVAC Permit)

Inspection sequence

Applies to: Residential Building Permit (New Single-Family Construction)

  1. 1

    Foundation/Footing

    Before concrete pour; job card and field-set plans must be on site

  2. 2

    Framing

    Structural framing and connections per 2021 IRC/IBC as adopted by the Town; job card must be posted near the front door once the structure is framed

  3. 3

    Rough-In (Plumbing/Electrical/Mechanical)

    Combination trade rough-in inspection before walls are closed

  4. 4

    Final / Certificate of Occupancy

    All work complete per approved plans; Residential Certificate of Occupancy issued ($40 fee)

Applies to: Residential Addition / Remodel Permit

  1. 1

    Foundation/Footing

    Required before concrete pour for additions

  2. 2

    Framing

    Structural connections to existing structure

  3. 3

    Final

    Completed work verified against approved plans

Applies to: Swimming Pool and Spa Permit

  1. 1

    Pre-Gunite / Steel

    In-ground pool structural steel and plumbing rough-in before gunite/shotcrete

  2. 2

    Barrier/Fence

    Verifies compliance with pool barrier requirements (height, gates, self-latching hardware, or equivalent alternative) before the pool holds water

  3. 3

    Final

    Completed pool/spa and barrier verified against approved plans and the 2021 International Pool and Spa Code

Applies to: Electrical Permit

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed and connections verified per 2020 NEC as adopted by the Town

Applies to: EV Charging Station Permit (Electrical Permit)

  1. 1

    Rough-In (if applicable)

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    EVSE breaker sizing, GFCI protection (where applicable), and connections verified per 2020 NEC Article 625 as adopted by the Town

Applies to: Mechanical / HVAC Permit

  1. 1

    Rough-In

    Ductwork and equipment placement before walls closed

  2. 2

    Final

    Equipment operational, clearances and combustion air verified

Applies to: Plumbing Permit

  1. 1

    Rough-In

    After pipes installed, before walls closed

  2. 2

    Final

    Fixtures connected, water heater and gas connections verified, no leaks

Applies to: Re-Roofing Permit

  1. 1

    Roof Inspection (In-Progress)

    Verifies sheathing, flashing, underlayment, and material installation

  2. 2

    Final Roof Inspection

    Completed roofing work verified against approved permit/material listing

Applies to: Single Family Residential Solar Photovoltaic (PV) System Permit

  1. 1

    Rough Electrical / Racking Attachment

    Conduit runs, wire sizing, disconnect placement, and roof/racking attachment before energizing

  2. 2

    Final

    Panel mounting, roof penetration sealing, electrical connections, and interconnection point verified

Queen Creek building permits

Get alerts for Queen Creek

We'll email you when Queen Creek's fees, documents, or codes change — not often.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.