Skip to main content
PermitBase

Demolition Permit in Queen Creek, Arizona

Required for demolition of any structure in Queen Creek, priced by structure category (residential accessory, one/two-family dwelling, or other structures).

Verified 2026-07-06 · Source

When you need this permit

  • Permit required for demolition of any structure, per the Town's 'When is a Permit Required?' page
  • Fee varies by structure type: residential accessory structure and one/two-family dwelling are both $100; structures other than those categories are $200 per structure
  • Demolition plan review is a flat $40, separate from the base demolition permit fee
  • Apply via the Development Nexus / Accela Citizen Access online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 3 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit — Residential accessory structureTown of Queen Creek Development Services Fee Schedule (effective 4/1/2026), Building Safety Permit Fees, item 6a
$100
Demolition Permit — One- or two-family dwellingTown of Queen Creek Development Services Fee Schedule (effective 4/1/2026), Building Safety Permit Fees, item 6b
$100
Demolition Permit — Structures other than the above, per structureTown of Queen Creek Development Services Fee Schedule (effective 4/1/2026), Building Safety Permit Fees, item 6c
$200
Demolition Plan ReviewTown of Queen Creek Development Services Fee Schedule (effective 4/1/2026), Plan Review Fees, item 9
$40

Review timeline

Plan reviewQueen Creek’s published plan-review target
Up to 5 business days

How long did your Demolition Permit permit actually take in Queen Creek?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final

    Verifies utility termination, structure removal, and site condition

See the full Queen Creek inspection guide — scheduling & re-inspection fees →

Tips

  • As of July 2026, the Town of Queen Creek does not appear to publish permit-specific plan review turnaround times for most building permit categories on its public website. The Town publishes permit requirements and process information, but not category-specific review timelines — despite A.R.S. § 9-835 requiring municipalities to post administrative-completeness and substantive review time frames for every permit type. A wide search (Building Safety, Building Applications, Required Permits, Fee Schedule, Building Codes, Development Nexus, Document Central, Directory of Regulatory Documents, and Building Inspections pages, plus a full Wayback Machine CDX sweep and the Town Code's own search index) found no dedicated, numbered time-frames table for this permit type. There is no verifiable online source for this permit type's review timeline — call Development Services (480-358-3003) or Building Safety Manager Michael Williams (480-358-3009) directly for the Town's current internal timeframe.
  • Demolition of a single-family dwelling or a residential accessory structure is priced identically at $100, while any other structure type is $200 per structure — plus a flat $40 plan review fee applies in all cases.

Frequently asked questions

Queen Creek requires a demolition permit for: Permit required for demolition of any structure, per the Town's 'When is a Permit Required?' page; Fee varies by structure type: residential accessory structure and one/two-family dwelling are both $100; structures other than those categories are $200 per structure; Demolition plan review is a flat $40, separate from the base demolition permit fee; Apply via the Development Nexus / Accela Citizen Access online portal. If your project isn't listed, confirm with Town of Queen Creek Development Services Department — Building Safety Division at 480-358-3003 before starting work.

$100 for a residential accessory structure or a one/two-family dwelling, or $200 per structure for other structure types, plus a flat $40 demolition plan review fee, per the Town of Queen Creek Development Services Fee Schedule (effective 4/1/2026).

As of July 2026, the Town of Queen Creek does not appear to publish permit-specific plan review turnaround times for most building permit categories on its public website. The Town publishes permit requirements and process information, but not category-specific review timelines. There is no verifiable online source for this permit type's review timeline — call Development Services (480-358-3003) or Building Safety Manager Michael Williams (480-358-3009) directly.

You'll need: Permit Application; Contractor Declaration; Site Plan. See the required-documents checklist on this page for details on each.

Queen Creek requires 1 inspection(s) for a demolition permit, in order: Final. Schedule each through Town of Queen Creek Development Services Department — Building Safety Division (480-358-3003).

Apply through Town of Queen Creek Development Services Department — Building Safety Division at Municipal Services Building, 22358 S. Ellsworth Road, Queen Creek, AZ 85142. Phone: 480-358-3003, email: development@QueenCreekAZ.gov. Office hours: Monday - Thursday, 7 a.m. - 6 p.m.; closed Fridays (Town offices closed Friday-Sunday). Applications are submitted electronically through the Development Nexus / Accela Citizen Access online portal (aca-prod.accela.com/QC). Building inspections are scheduled through Development Nexus or by phone/text; the cutoff for next-business-day inspection requests is 6:00 p.m. Inspection hours are 6 a.m.-1:30 p.m. Mon-Thu and 6-10 a.m. Fri (September-May), and 5:30 a.m.-12 p.m. Mon-Thu and 5:30-10 a.m. Fri (June-August). Building Official: Michael Williams, CBO, Building Safety Manager, Michael.Williams@QueenCreekAZ.gov, 480-358-3009.. Official information: https://www.queencreekaz.gov/government/development-services/building-safety.

Queen Creek, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-jurisdiction authority under state enabling statutes (A.R.S. Title 9 for municipalities). The Town of Queen Creek is an independently incorporated town (not administered by Maricopa or Pinal County for permitting purposes) that adopts and administers its own construction codes through its Development Services Department / Building Safety Division. Source: Town of Queen Creek Building Safety page (queencreekaz.gov/government/development-services/building-safety) and Building Codes page.; 2021 International Building Code (IBC), as published by the International Code Council, adopted by the Town of Queen Creek with an effective date of January 1, 2023; applications submitted on or after April 1, 2023 must be designed to the 2021 edition. Source: Town of Queen Creek Building Codes page (queencreekaz.gov/government/development-services/building-safety/building-codes).; 2021 International Residential Code (IRC), adopted by the Town of Queen Creek effective January 1, 2023 (mandatory for submittals from April 1, 2023). Source: Town of Queen Creek Building Codes page.; 2021 International Mechanical Code (IMC), adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2020 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by the Town of Queen Creek — one edition behind the 2021 ICC family (the Town has not moved to the 2023 NEC as of this review). Source: Town of Queen Creek Building Codes page.; 2021 International Plumbing Code (IPC), adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2021 International Fuel Gas Code (IFGC), adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2021 International Existing Building Code (IEBC), adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2021 International Energy Conservation Code (IECC), adopted by the Town of Queen Creek effective January 1, 2023, governing energy-efficiency requirements. Source: Town of Queen Creek Building Codes page.; 2021 International Property Maintenance Code, adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2021 International Urban-Wildland Interface Code, adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2021 International Pool and Spa Code, adopted by the Town of Queen Creek effective January 1, 2023, governing swimming pool and spa construction and barrier requirements. Source: Town of Queen Creek Building Codes page.; 2021 International Fire Code (IFC), adopted by the Town of Queen Creek effective January 1, 2023 as the Town's uniform fire code, administered by Fire Prevention within Development Services (see the Fire Prevention section of the Development Services Fee Schedule for operational/construction permit fees). Source: Town of Queen Creek Building Codes page; Town of Queen Creek Development Services Fee Schedule (Valuation Data, effective 4/1/2026), Fire Prevention section.; 2021 code adoption included Town-specific amendments; the Town's official '2021 Amendments' document and the original 2012 adopting Ordinance 539-13 / Resolution 969-13 / Exhibit A are both published on the Building Codes page for reference. Source: Town of Queen Creek Building Codes page (2021 Amendments PDF, and 2012 Ordinance/Resolution/Exhibit A PDFs).. Local amendments apply — see the Queen Creek overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Queen Creek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.