Electrical Permit in Queen Creek, Arizona

Required for additions or modifications to electrical systems (excluding simple fixture swaps) in Queen Creek, governed by the 2020 National Electrical Code (NEC) as adopted by the Town. May be issued as a stand-alone trade permit or as part of a Combination Permit.

Verified 2026-07-06 · Source

When you need this permit

  • Permit explicitly required for additions or modifications to electrical systems, excluding fixtures
  • Governed by the 2020 NEC as adopted by the Town of Queen Creek
  • Stand-alone electrical permits are billed at 10% of the Fee Table amount plus a $20 administrative fee; plan review for a stand-alone electrical permit is billed separately at 65% of the applicable permit fee
  • Apply via the Development Nexus / Accela Citizen Access online portal

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Electrical Permit (Stand Alone Permit)Town of Queen Creek Development Services Fee Schedule (effective 4/1/2026), Building Safety Permit Fees, item 4
10% of Fee Table, plus $20 administrative fee
Electrical (Stand-Alone) Plan ReviewTown of Queen Creek Development Services Fee Schedule (effective 4/1/2026), Plan Review Fees, item 5
65% of the applicable permit fee
Temporary Electric Power PermitTown of Queen Creek Development Services Fee Schedule (effective 4/1/2026), Building Safety Permit Fees, item 11
$95
Utility Clearance Permit (2 inspections maximum, for inspection required by utility provider)Town of Queen Creek Development Services Fee Schedule (effective 4/1/2026), Building Safety Permit Fees, item 18
$150

Review timeline

Plan reviewQueen Creek’s published plan-review target
Up to 5 business days

How long did your Electrical Permit permit actually take in Queen Creek?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Rough-In

    Wiring, box placement, and panel connections before walls are closed

  2. 2

    Final

    Devices installed and connections verified per 2020 NEC as adopted by the Town

See the full Queen Creek inspection guide — scheduling & re-inspection fees →

Tips

  • As of July 2026, the Town of Queen Creek does not appear to publish permit-specific plan review turnaround times for most building permit categories on its public website. The Town publishes permit requirements and process information, but not category-specific review timelines — despite A.R.S. § 9-835 requiring municipalities to post administrative-completeness and substantive review time frames for every permit type. A wide search (Building Safety, Building Applications, Required Permits, Fee Schedule, Building Codes, Development Nexus, Document Central, Directory of Regulatory Documents, and Building Inspections pages, plus a full Wayback Machine CDX sweep and the Town Code's own search index) found no dedicated, numbered time-frames table for this permit type. There is no verifiable online source for this permit type's review timeline — call Development Services (480-358-3003) or Building Safety Manager Michael Williams (480-358-3009) directly for the Town's current internal timeframe.
  • Stand-alone electrical permits carry the lowest percentage of the Fee Table (10%) among the four trades, reflecting the Town's tiered stand-alone pricing (Building 60%, Plumbing 25%, Electrical 10%, Mechanical 5%), each plus a flat $20 admin fee.
  • Inspection scheduling cutoff for next-business-day service is 6:00 p.m.; requests after the cutoff move to the second business day — this is the basis for the 1-2 business day review/turnaround window on straightforward stand-alone electrical work with no plan-review step.

Frequently asked questions

No — the Town's 'When is a Permit Required?' page explicitly excludes fixtures from the electrical-permit trigger; a permit is required for additions or modifications to electrical systems, not simple fixture replacement.

In Queen Creek, the published Electrical Permit (Stand Alone Permit) is: 10% of Fee Table, plus $20 administrative fee. Additional published fees: Electrical (Stand-Alone) Plan Review — 65% of the applicable permit fee; Temporary Electric Power Permit — $95; Utility Clearance Permit (2 inspections maximum, for inspection required by utility provider) — $150. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

As of July 2026, the Town of Queen Creek does not appear to publish permit-specific plan review turnaround times for most building permit categories on its public website. The Town publishes permit requirements and process information, but not category-specific review timelines. There is no verifiable online source for this permit type's review timeline — call Development Services (480-358-3003) or Building Safety Manager Michael Williams (480-358-3009) directly.

You'll need: Permit Application; Contractor Declaration. See the required-documents checklist on this page for details on each.

Queen Creek requires 2 inspection(s) for an electrical permit, in order: Rough-In, Final. Schedule each through Town of Queen Creek Development Services Department — Building Safety Division (480-358-3003).

Apply through Town of Queen Creek Development Services Department — Building Safety Division at Municipal Services Building, 22358 S. Ellsworth Road, Queen Creek, AZ 85142. Phone: 480-358-3003, email: development@QueenCreekAZ.gov. Office hours: Monday - Thursday, 7 a.m. - 6 p.m.; closed Fridays (Town offices closed Friday-Sunday). Applications are submitted electronically through the Development Nexus / Accela Citizen Access online portal (aca-prod.accela.com/QC). Building inspections are scheduled through Development Nexus or by phone/text; the cutoff for next-business-day inspection requests is 6:00 p.m. Inspection hours are 6 a.m.-1:30 p.m. Mon-Thu and 6-10 a.m. Fri (September-May), and 5:30 a.m.-12 p.m. Mon-Thu and 5:30-10 a.m. Fri (June-August). Building Official: Michael Williams, CBO, Building Safety Manager, Michael.Williams@QueenCreekAZ.gov, 480-358-3009.. Official information: https://www.queencreekaz.gov/government/development-services/building-safety.

Queen Creek, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-jurisdiction authority under state enabling statutes (A.R.S. Title 9 for municipalities). The Town of Queen Creek is an independently incorporated town (not administered by Maricopa or Pinal County for permitting purposes) that adopts and administers its own construction codes through its Development Services Department / Building Safety Division. Source: Town of Queen Creek Building Safety page (queencreekaz.gov/government/development-services/building-safety) and Building Codes page.; 2021 International Building Code (IBC), as published by the International Code Council, adopted by the Town of Queen Creek with an effective date of January 1, 2023; applications submitted on or after April 1, 2023 must be designed to the 2021 edition. Source: Town of Queen Creek Building Codes page (queencreekaz.gov/government/development-services/building-safety/building-codes).; 2021 International Residential Code (IRC), adopted by the Town of Queen Creek effective January 1, 2023 (mandatory for submittals from April 1, 2023). Source: Town of Queen Creek Building Codes page.; 2021 International Mechanical Code (IMC), adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2020 National Electrical Code (NEC), as published by the National Fire Protection Association, adopted by the Town of Queen Creek — one edition behind the 2021 ICC family (the Town has not moved to the 2023 NEC as of this review). Source: Town of Queen Creek Building Codes page.; 2021 International Plumbing Code (IPC), adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2021 International Fuel Gas Code (IFGC), adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2021 International Existing Building Code (IEBC), adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2021 International Energy Conservation Code (IECC), adopted by the Town of Queen Creek effective January 1, 2023, governing energy-efficiency requirements. Source: Town of Queen Creek Building Codes page.; 2021 International Property Maintenance Code, adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2021 International Urban-Wildland Interface Code, adopted by the Town of Queen Creek effective January 1, 2023. Source: Town of Queen Creek Building Codes page.; 2021 International Pool and Spa Code, adopted by the Town of Queen Creek effective January 1, 2023, governing swimming pool and spa construction and barrier requirements. Source: Town of Queen Creek Building Codes page.; 2021 International Fire Code (IFC), adopted by the Town of Queen Creek effective January 1, 2023 as the Town's uniform fire code, administered by Fire Prevention within Development Services (see the Fire Prevention section of the Development Services Fee Schedule for operational/construction permit fees). Source: Town of Queen Creek Building Codes page; Town of Queen Creek Development Services Fee Schedule (Valuation Data, effective 4/1/2026), Fire Prevention section.; 2021 code adoption included Town-specific amendments; the Town's official '2021 Amendments' document and the original 2012 adopting Ordinance 539-13 / Resolution 969-13 / Exhibit A are both published on the Building Codes page for reference. Source: Town of Queen Creek Building Codes page (2021 Amendments PDF, and 2012 Ordinance/Resolution/Exhibit A PDFs).. Local amendments apply — see the Queen Creek overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Queen Creek building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.