Plumbing Permit (incl. Water/Sewer Line Replacement) in Tempe, Arizona
Plumbing work in Tempe is governed by the 2018 International Plumbing Code (IPC) with Tempe amendments. Plumbing permits are applied for through the Tempe Citizen Access Portal. A flat-rate fee applies for residential water/sewer line replacement (Table 2-A); all other plumbing work uses the valuation-based Table 1-A building permit fee, plus a 65% plan review fee where required.
Verified 2026-06-29 · Source
When you need this permit
- Plumbing work must comply with the 2018 International Plumbing Code (IPC) with Tempe amendments
- Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
- Contractor Affidavit required (State of AZ requirement per AZ Department of Revenue)
- Arizona ROC-licensed plumbing contractor generally required; owner-builder exemptions may apply under ARS 32-1121 Owner-builderContractor
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Underground plumbing (before backfill or concrete pour)
Underground plumbing inspected before backfill or concrete is poured; approved before proceeding.
- 2
Rough plumbing (before covering)
Rough-in plumbing inspected before walls are closed; approved before proceeding.
- 3
Final plumbing
Final inspection of all completed plumbing work per approved plans and the 2018 IPC with Tempe amendments.
See the full Tempe inspection guide — scheduling & re-inspection fees →
Tips
- A flat $242 fee (Table 2-A, includes plan review) applies to single-family water/sewer line replacement.
- A Sewer Installation Certificate is required for sewer work — available on the Tempe Inspections page.
- All permit applications must be submitted electronically through the Citizen Access Portal.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tempe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tempe
Plumbing Permit (incl. Water/Sewer Line Replacement) in other cities
Compare plumbing permit (incl. water/sewer line replacement) fees across Arizona →
Look up this fee in a different city →
Related guides
Now live
Build your Tempe project checklist
Describe your project once and get every permit, document, and fee it triggers in Tempe — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →