Plumbing Permit (incl. Water/Sewer Line Replacement) in Tempe, Arizona

Plumbing work in Tempe is governed by the 2018 International Plumbing Code (IPC) with Tempe amendments. Plumbing permits are applied for through the Tempe Citizen Access Portal. A flat-rate fee applies for residential water/sewer line replacement (Table 2-A); all other plumbing work uses the valuation-based Table 1-A building permit fee, plus a 65% plan review fee where required.

Verified 2026-06-29 · Source

When you need this permit

Required documents

Fee schedule

Fee typeAmountNotes
Single Family Water/Sewer Line Replacement — flat fee (Table 2-A, effective July 1, 2025)$242 (includes plan review)Table 2-A — Building Permit Flat Fees: 'SINGLE FAMILY WATER/SEWER LINE REPLACEMENT — $242 *Includes Plan Review fee.' Effective July 1, 2025. Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE).
Other plumbing work — valuation-based (Table 1-A, effective July 1, 2025)Per Table 1-A tiers. Plan Review Fee is 65% of the building permit fee, collected separately at application.For plumbing work not covered by a Table 2-A flat rate, the valuation-based Table 1-A applies. Source: Table 1-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA1UIPEFE).

Review timeline

~110 business days

Typical estimate — confirm current times with the Tempe building department

Inspection process

  1. 1

    Underground plumbing (before backfill or concrete pour)

    Underground plumbing inspected before backfill or concrete is poured; approved before proceeding.

  2. 2

    Rough plumbing (before covering)

    Rough-in plumbing inspected before walls are closed; approved before proceeding.

  3. 3

    Final plumbing

    Final inspection of all completed plumbing work per approved plans and the 2018 IPC with Tempe amendments.

Tips

Frequently asked questions

What is the fee to replace a water or sewer line in Tempe?
The Table 2-A flat fee for a single-family water/sewer line replacement is $242 (includes plan review), effective July 1, 2025. A Sewer Installation Certificate is also required. Source: Table 2-A — Building Permit Flat Fees (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE).

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tempe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.

Other permits in Tempe

Related guides

Get the AI compliance checklist

Upload your project scope, get a jurisdiction-specific checklist of everything you need. Coming soon.

We only use your email to send permit updates. No spam, unsubscribe anytime. Privacy.