Demolition Permit — Tempe, Arizona · Requirements sheet
Verified 2026-06-29 · Source: https://www.tempe.gov/government/community-development/building-safety/fees
PermitBase is an independent reference and is not affiliated with any government agency. Requirements change and vary by project — confirm current details with the building department before you submit.
Demolition Permit in Tempe, Arizona
A demolition permit is required in Tempe for the demolition of any structure. A flat fee of $97 per structure (per Table 2-A, effective July 1, 2025, includes plan review) applies for full demolition. Non-structural interior demolition carries a separate flat fee of $97. All applications are submitted through the Tempe Citizen Access Portal.
Verified 2026-06-29 · Source
When you need this permit
- Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
- Contractor Affidavit required (State of AZ requirement per AZ Department of Revenue)
- Arizona 811/Blue Stake (call-before-you-dig) compliance required before any excavation
- Asbestos surveys and abatement may be required for older structures — contact ADEQ for requirements
Required documents
Check off what you have — your progress is saved on this device.
Not ready yet — 0 of 1 required documents checked.
This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →
Fee schedule
Review timeline
Inspection process
- 1
Demolition final
Inspection to verify completion of demolition per the approved permit; site must be clear and safe.
See the full Tempe inspection guide — scheduling & re-inspection fees →
Tips
- Both full demolition ($97 per structure) and non-structural interior demolition ($97) carry the same flat fee in Table 2-A.
- Call Arizona 811 (Blue Stake) before any excavation to locate underground utilities.
- Check ADEQ requirements for asbestos surveys on pre-1980 structures before demolition.
Frequently asked questions
Sources & verification
Verified against official sources. Last reviewed 2026-06-29.
Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tempe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.
Other permits in Tempe
Demolition Permit in other cities
Compare demolition permit fees across Arizona →
Look up this fee in a different city →
Now live
Build your Tempe project checklist
Describe your project once and get every permit, document, and fee it triggers in Tempe — in one checklist. Sign up and pay once to generate it, or go unlimited with Pro.
Get started →