Skip to main content
PermitBase

Demolition Permit in Tempe, Arizona

A demolition permit is required in Tempe for the demolition of any structure. A flat fee of $97 per structure (per Table 2-A, effective July 1, 2025, includes plan review) applies for full demolition. Non-structural interior demolition carries a separate flat fee of $97. All applications are submitted through the Tempe Citizen Access Portal.

Verified 2026-06-29 · Source

When you need this permit

  • Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx)
  • Contractor Affidavit required (State of AZ requirement per AZ Department of Revenue)
  • Arizona 811/Blue Stake (call-before-you-dig) compliance required before any excavation
  • Asbestos surveys and abatement may be required for older structures — contact ADEQ for requirements

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 1 required documents checked.

This checker covers one permit. A full project usually triggers several — our checklist will assemble all of them, free →

Fee schedule

Demolition Permit (per structure) — flat fee (Table 2-A, effective July 1, 2025)Table 2-A — Building Permit Flat Fees: 'DEMOLITION PERMIT (PER STRUCTURE) — $97 *Includes Plan Review fee.' Effective July 1, 2025. Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE).
$97 per structure (includes plan review)
Non-Structural Interior Demolition — flat fee (Table 2-A, effective July 1, 2025)Table 2-A: 'NON-STRUCTURAL INTERIOR DEMOLITION — $97 *Includes Plan Review fee.' Effective July 1, 2025. Source: Table 2-A (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE).
$97 (includes plan review)

Review timeline

Plan reviewTypical estimate — confirm current times with the Tempe building department
~1–5 business days

How long did your Demolition Permit permit actually take in Tempe?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Demolition final

    Inspection to verify completion of demolition per the approved permit; site must be clear and safe.

See the full Tempe inspection guide — scheduling & re-inspection fees →

Tips

  • Both full demolition ($97 per structure) and non-structural interior demolition ($97) carry the same flat fee in Table 2-A.
  • Call Arizona 811 (Blue Stake) before any excavation to locate underground utilities.
  • Check ADEQ requirements for asbestos surveys on pre-1980 structures before demolition.

Frequently asked questions

Tempe requires a demolition permit for: Apply electronically through the Tempe Citizen Access Portal (epermits.tempe.gov/CitizenAccess/Default.aspx); Contractor Affidavit required (State of AZ requirement per AZ Department of Revenue); Arizona 811/Blue Stake (call-before-you-dig) compliance required before any excavation; Asbestos surveys and abatement may be required for older structures — contact ADEQ for requirements. If your project isn't listed, confirm with City of Tempe Community Development Department — Building Safety Division / Permit Center at 480-350-4311 before starting work.

The Table 2-A flat fee is $97 per structure for a full demolition permit, and $97 for non-structural interior demolition — both include plan review. Effective July 1, 2025. Source: Table 2-A — Building Permit Flat Fees (library.municode.com/az/tempe/codes/city_code?nodeId=APXASCFECH_TA2UIPEFLFE).

Plan review for a demolition permit in Tempe typically runs 1–5 business days. This is an estimate, not a published figure — confirm current review times with City of Tempe Community Development Department — Building Safety Division / Permit Center at 480-350-4311.

You'll need: Contractor Affidavit. See the required-documents checklist on this page for details on each.

Tempe requires 1 inspection(s) for a demolition permit, in order: Demolition final. Schedule each through City of Tempe Community Development Department — Building Safety Division / Permit Center (480-350-4311).

Apply through City of Tempe Community Development Department — Building Safety Division / Permit Center at City of Tempe City Hall, 31 E. 5th St., Tempe, AZ 85281. Phone: 480-350-4311, email: permitcenter@tempe.gov. Office hours: Contact the Permit Center at 480-350-4311 or permitcenter@tempe.gov for current hours; inspections are conducted Monday–Friday 6:30 AM–3:30 PM (inspection requests received before midnight are inspected the following business day). Official information: https://www.tempe.gov/government/community-development/building-safety/permit-center.

Tempe, Arizona has adopted: 2018 Tempe Building Safety Administrative Code (local administrative provisions) — adopted with Tempe amendments; published on the ICC Safe platform (codes.iccsafe.org/content/AZTEMPEMC2018P2); 2018 International Building Code (IBC) — adopted with Tempe amendments; published on the ICC Safe platform (codes.iccsafe.org/content/AZTEMPEBC2018P1); 2018 International Residential Code (IRC) — adopted with Tempe amendments; published on the ICC Safe platform (codes.iccsafe.org/content/AZTEMPERC2018P11); 2018 International Mechanical Code (IMC) — adopted with Tempe amendments; published on the ICC Safe platform (codes.iccsafe.org/content/AZTEMPEMC2018P11); 2018 International Fuel Gas Code (IFGC) — adopted with Tempe amendments; published on the ICC Safe platform (codes.iccsafe.org/content/AZTEMPEFGC2018P11); 2018 International Energy Conservation Code (IECC) — adopted with Tempe amendments; published on the ICC Safe platform (codes.iccsafe.org/content/AZTEMPEECC2018P1); 2018 International Existing Building Code (IEBC) — adopted with Tempe amendments; published on the ICC Safe platform (codes.iccsafe.org/content/AZTEMPEEBC2018P22); 2018 International Plumbing Code (IPC) — adopted with Tempe amendments; published on the ICC Safe platform (codes.iccsafe.org/content/AZTEMPEPC2018P11); 2018 International Swimming Pool and Spa Code (ISPSC) — adopted with Tempe amendments; published on the ICC Safe platform (codes.iccsafe.org/content/AZTEMPESPSC2018P1); 2018 International Fire Code (IFC) — adopted with Tempe amendments; published on the ICC Safe platform (codes.iccsafe.org/content/AZTEMPEFC2018P1); 2018 International Green Construction Code (IgCC) — adopted with Tempe amendments; published on the ICC Safe platform (library.municode.com/az/tempe/codes/city_code?nodeId=CH8BUBURE_ARTXIINGRCOCO); 2017 National Electrical Code (NEC) — adopted with Tempe amendments; published in the Tempe City Code (library.municode.com/az/tempe/codes/city_code?nodeId=CH8BUBURE_ARTVIII2017NAELCO). Local amendments apply — see the Tempe overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-06-29.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Tempe building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.