Re-Roofing Permit in Sahuarita, Arizona

Required for re-roofing work in the Town of Sahuarita that goes beyond the Town's narrow like-for-like exemption. Governed by the 2024 IRC/IBC roofing provisions; reviewed as part of the general Residential Addition/Remodel process since Sahuarita does not publish a separate standalone roofing checklist.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required for re-roofing EXCEPT: like-for-like replacement of roofing material (same material as existing), and replacement of underlayment/moisture barrier only
  • A permit IS required for: repairs to any portion of roof sheathing or structural members, and any change to tile roofing from another roofing material
  • No permit is required for exterior stucco repairs (relevant to parapet/roof-adjacent stucco work)
  • Submitted and reviewed as a Residential Addition/Remodel scope using the Residential Addition/Remodel Submittal Checklist, since the Town does not publish a dedicated stand-alone re-roofing checklist
  • Apply via Accela Citizen Access (aca.accela.com/TOS/Default.aspx)

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Building Permit Fee — Based on ValuationTown Code § 3.10.080(A); re-roofing is billed under the general Building Permit valuation schedule since no separate roofing fee line is published
Same valuation-based schedule as new construction/remodel: $23.50 (valuation $1-$500) up through $5,608.75 + $3.65 per additional $1,000 above $1,000,000
Plan Review Fee, All StructuresTown Code § 3.10.080(B)(7)(a)
65% of the Building Permit Fee

Review timeline

Plan reviewSahuarita’s published plan-review target
10–20 business days

How long did your Re-Roofing Permit permit actually take in Sahuarita?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Roof Inspection

    Verifies sheathing, structural members, and roofing material change comply with approved plans

See the full Sahuarita inspection guide — scheduling & re-inspection fees →

Tips

  • The only permit-exempt re-roof scopes are like-for-like material replacement and underlayment-only replacement — sheathing/structural repairs or a material change to tile always require a permit.
  • Because the Town does not publish a dedicated roofing checklist, a permit-requiring re-roof is processed under the same 'Residential: Addition, Alteration, New, Model Plan' review-timeframe category as other remodel work: 5 business days administrative completeness, 20 business days first substantive review, 10 business days subsequent review, per the Town's A.R.S. § 9-835 timeframes chart (updated 7/22/2024).
  • Fire sprinkler thresholds (3,600 sq ft) generally do not apply to a pure re-roof unless the project is bundled with other qualifying additions.

Frequently asked questions

Not if you are replacing the roofing material like-for-like or replacing underlayment only — those are permit-exempt. Any repair to roof sheathing or structural members, or a change to tile roofing from another material, requires a permit.

In Sahuarita, the published Building Permit Fee — Based on Valuation is: Same valuation-based schedule as new construction/remodel: $23.50 (valuation $1-$500) up through $5,608.75 + $3.65 per additional $1,000 above $1,000,000. Additional published fees: Plan Review Fee, All Structures — 65% of the Building Permit Fee. These are the jurisdiction's own published figures — see the fee schedule table and source citations on this page.

Re-roofing that requires a permit is processed under the 'Residential: Addition, Alteration, New, Model Plan' category on the Town's A.R.S. § 9-835 Building Permit Review Timeframes chart: 5 business days administrative completeness review, 20 business days first substantive review, 10 business days subsequent review.

You'll need: Residential Addition/Remodel Submittal Checklist; Contractor Form. See the required-documents checklist on this page for details on each.

Sahuarita requires 1 inspection(s) for a re-roofing permit, in order: Roof Inspection. Schedule each through Town of Sahuarita Community Development Department — Building Safety Division (520-822-8866).

Apply through Town of Sahuarita Community Development Department — Building Safety Division at 375 W. Sahuarita Center Way, Sahuarita, AZ 85629. Phone: 520-822-8866, email: buildapps@sahuaritaaz.gov. Office hours: Office hours are not published on the Town's Permits and Inspections, Community Development, or Building Safety Division pages as of this review; permit submittal and inspection scheduling are handled online through Accela Citizen Access (aca-prod.accela.com/tos) rather than in-person counter hours. General phone contact: 520-822-8866. Source: Town of Sahuarita Permits and Inspections page and Building Safety Division staff directory (sahuaritaaz.gov/758/Building-Safety-Division).. Official information: https://sahuaritaaz.gov/848/Permits-and-Inspections.

Sahuarita, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Sahuarita is a general-law municipality that independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division. Source: Town of Sahuarita Building Codes page (sahuaritaaz.gov/789/Building-Codes).; The Town of Sahuarita has adopted the 2024 International Building Code (IBC), 2024 International Residential Code (IRC), 2024 International Mechanical Code (IMC), 2024 International Plumbing Code (IPC), 2024 International Fuel Gas Code (IFGC), 2024 International Fire Code (IFC), the 2018 International Energy Conservation Code (IECC — NOT updated to the 2024 edition), and the 2023 National Electrical Code (NEC), together with associated Town of Sahuarita local amendments. Effective July 1, 2026; until 5:00 p.m. June 30, 2026 the Town accepted plans conforming to either the 2018 or 2024 code sets, but beginning July 1, 2026 all plans must conform to the 2024 codes (Sahuarita is confirmed on 2024 codes as of this review, dated July 6, 2026). Source: Town of Sahuarita Building Codes page (sahuaritaaz.gov/789/Building-Codes), '2024 Code Adoptions and Amendments' section.; Prior to July 1, 2026, the Town enforced the 2018 International Building, Residential, Fire, Mechanical, Fuel Gas, Plumbing, and Energy Conservation Codes, the 2017 National Electrical Code, the 2018 International Swimming Pool and Spa Code, and the 2018 International Property Maintenance Code, each with Town of Sahuarita local amendments; these 2018-cycle amendment documents remain published for reference but are superseded by the 2024 adoption. Source: Town of Sahuarita Building Codes page.; 2024 International Residential Code amendments (Final Draft Red-Line, dated 12/18/2025): Town of Sahuarita is inserted as the named jurisdiction (R101.1); Section R102.7 is added requiring new construction to conform to International Fire Code fire-flow/fire-access provisions (Sections 102.5, 503, 507.3, 3310, 3307.1, 3307.1.1, 3312, 3307.2, Appendices B/C/D as amended); Section R108.2 (Schedule of permit fees) is amended to cross-reference 'The Town of Sahuarita Code' (i.e., Town Code Chapter 3.10) rather than a generic 'applicable governing authority'; Section R110.2 is amended so the building final inspection approval itself serves as the Certificate of Occupancy for detached single-family residences (no separate C.O. document/fee). Source: Town of Sahuarita 2024 IRC Amendments, Final Draft Red-Line, dated 12/18/2025 (sahuaritaaz.gov/DocumentCenter/View/13212).; 2024 International Building Code and International Plumbing Code amendments were also drafted and finalized on the same 12/18/2025 timeline as companion documents to the IRC amendments (Town of Sahuarita 2024 IBC Amendments and 2024 IPC Amendments, Final Draft Red-Line, dated 12/18/2025), adopted via Town Council ordinance as part of the same code-update package effective July 1, 2026. Source: sahuaritaaz.gov/DocumentCenter/View/13206 (IBC) and sahuaritaaz.gov/DocumentCenter/View/13210 (IPC).; Manufactured homes, mobile homes, and factory-built buildings: installation permits are issued per the intergovernmental agreement between the Town of Sahuarita and the Arizona Office of Manufactured Housing, with the Town's own Zoning Clearance and utility-connection fees applying separately (Town Code § 3.10.080(G)). Source: Town of Sahuarita Town Code Chapter 3.10, Building permit fees, subsection G — verified live via real-browser navigation 2026-07-16 at ecode360.com/49024348#49024356 (codepublishing.com/AZ/Sahuarita now redirects to this ecode360.com host; this is codified Town Code text, structurally stable, not a frequently-revised fee resolution).. Local amendments apply — see the Sahuarita overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sahuarita building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.