Demolition Permit in Sahuarita, Arizona

Required for demolition of any residential or commercial structure in the Town of Sahuarita. No Town permit fee is charged, but coordination with Pima County Department of Environmental Quality (air quality/septic) is required, and demolitions are reported to the Pima County Assessor.

Verified 2026-07-06 · Source

When you need this permit

  • Building permit required before demolishing a residential or commercial structure within Town of Sahuarita limits
  • Construction documents must show the existing structure to be removed and existing utilities to be capped, noting the square footage of the structure or area to be removed
  • An Air Quality permit may be required — contact Pima County Department of Environmental Quality (PDEQ)
  • For closure of septic systems, contact PDEQ separately
  • Demolition permits are reported to the Pima County Assessor's Office, which may affect property tax assessment
  • An inspection is required to verify utilities have been capped off before the project is complete

Required documents

Check off what you have — your progress is saved on this device.

Not ready yet0 of 2 required documents checked.

This checker covers one permit. A full project usually triggers several — our paid checklist will assemble all of them, from $29

Fee schedule

Demolition Permit FeeTown of Sahuarita Demolition Submittal Checklist (updated November 2024), explicit note: 'There is no permit fee.'
$0.00 — there is no permit fee

Review timeline

Plan reviewSahuarita’s published plan-review target
10–10 business days

How long did your Demolition Permit permit actually take in Sahuarita?

Anonymous — one question, no email. Answers are combined and only shown once at least 5 people have reported.

Inspection process

  1. 1

    Final / Utility Cap-Off Verification

    Verifies all utilities have been properly capped off at the structure

See the full Sahuarita inspection guide — scheduling & re-inspection fees →

Tips

  • Demolition carries no Town permit fee at all — the only costs are potential Pima County Air Quality / septic-closure fees handled separately by PDEQ.
  • Classified as 'Other Permit Types: Commercial Demolition, Residential Demolition, SFR from Model' on the Town's A.R.S. § 9-835 timeframes chart (updated 7/22/2024): not applicable for administrative completeness review, 10 business days for first substantive review, 10 business days for subsequent review.
  • Demolitions are reported to the Pima County Assessor — contact them directly to understand potential property tax implications.

Frequently asked questions

Sahuarita requires a demolition permit for: Building permit required before demolishing a residential or commercial structure within Town of Sahuarita limits; Construction documents must show the existing structure to be removed and existing utilities to be capped, noting the square footage of the structure or area to be removed; An Air Quality permit may be required — contact Pima County Department of Environmental Quality (PDEQ); For closure of septic systems, contact PDEQ separately; Demolition permits are reported to the Pima County Assessor's Office, which may affect property tax assessment; An inspection is required to verify utilities have been capped off before the project is complete. If your project isn't listed, confirm with Town of Sahuarita Community Development Department — Building Safety Division at 520-822-8866 before starting work.

There is no Town permit fee for demolition, per the Town's Demolition Submittal Checklist. However, a separate Pima County Department of Environmental Quality air-quality permit may be required, and septic system closures must be coordinated with PDEQ separately.

Demolition falls under 'Other Permit Types: Commercial Demolition, Residential Demolition, SFR from Model' on the Town's A.R.S. § 9-835 Building Permit Review Timeframes chart: not applicable for administrative completeness review, 10 business days for first substantive review, 10 business days for each subsequent review.

You'll need: Demolition Submittal Checklist; Contractor Form. See the required-documents checklist on this page for details on each.

Sahuarita requires 1 inspection(s) for a demolition permit, in order: Final / Utility Cap-Off Verification. Schedule each through Town of Sahuarita Community Development Department — Building Safety Division (520-822-8866).

Apply through Town of Sahuarita Community Development Department — Building Safety Division at 375 W. Sahuarita Center Way, Sahuarita, AZ 85629. Phone: 520-822-8866, email: buildapps@sahuaritaaz.gov. Office hours: Office hours are not published on the Town's Permits and Inspections, Community Development, or Building Safety Division pages as of this review; permit submittal and inspection scheduling are handled online through Accela Citizen Access (aca-prod.accela.com/tos) rather than in-person counter hours. General phone contact: 520-822-8866. Source: Town of Sahuarita Permits and Inspections page and Building Safety Division staff directory (sahuaritaaz.gov/758/Building-Safety-Division).. Official information: https://sahuaritaaz.gov/848/Permits-and-Inspections.

Sahuarita, Arizona has adopted: Arizona has NO statewide mandatory building code floor for general construction — code adoption is a per-city/town authority under state enabling statutes (e.g., A.R.S. Title 9 for municipalities). The Town of Sahuarita is a general-law municipality that independently adopts and administers its own construction codes through its Community Development Department / Building Safety Division. Source: Town of Sahuarita Building Codes page (sahuaritaaz.gov/789/Building-Codes).; The Town of Sahuarita has adopted the 2024 International Building Code (IBC), 2024 International Residential Code (IRC), 2024 International Mechanical Code (IMC), 2024 International Plumbing Code (IPC), 2024 International Fuel Gas Code (IFGC), 2024 International Fire Code (IFC), the 2018 International Energy Conservation Code (IECC — NOT updated to the 2024 edition), and the 2023 National Electrical Code (NEC), together with associated Town of Sahuarita local amendments. Effective July 1, 2026; until 5:00 p.m. June 30, 2026 the Town accepted plans conforming to either the 2018 or 2024 code sets, but beginning July 1, 2026 all plans must conform to the 2024 codes (Sahuarita is confirmed on 2024 codes as of this review, dated July 6, 2026). Source: Town of Sahuarita Building Codes page (sahuaritaaz.gov/789/Building-Codes), '2024 Code Adoptions and Amendments' section.; Prior to July 1, 2026, the Town enforced the 2018 International Building, Residential, Fire, Mechanical, Fuel Gas, Plumbing, and Energy Conservation Codes, the 2017 National Electrical Code, the 2018 International Swimming Pool and Spa Code, and the 2018 International Property Maintenance Code, each with Town of Sahuarita local amendments; these 2018-cycle amendment documents remain published for reference but are superseded by the 2024 adoption. Source: Town of Sahuarita Building Codes page.; 2024 International Residential Code amendments (Final Draft Red-Line, dated 12/18/2025): Town of Sahuarita is inserted as the named jurisdiction (R101.1); Section R102.7 is added requiring new construction to conform to International Fire Code fire-flow/fire-access provisions (Sections 102.5, 503, 507.3, 3310, 3307.1, 3307.1.1, 3312, 3307.2, Appendices B/C/D as amended); Section R108.2 (Schedule of permit fees) is amended to cross-reference 'The Town of Sahuarita Code' (i.e., Town Code Chapter 3.10) rather than a generic 'applicable governing authority'; Section R110.2 is amended so the building final inspection approval itself serves as the Certificate of Occupancy for detached single-family residences (no separate C.O. document/fee). Source: Town of Sahuarita 2024 IRC Amendments, Final Draft Red-Line, dated 12/18/2025 (sahuaritaaz.gov/DocumentCenter/View/13212).; 2024 International Building Code and International Plumbing Code amendments were also drafted and finalized on the same 12/18/2025 timeline as companion documents to the IRC amendments (Town of Sahuarita 2024 IBC Amendments and 2024 IPC Amendments, Final Draft Red-Line, dated 12/18/2025), adopted via Town Council ordinance as part of the same code-update package effective July 1, 2026. Source: sahuaritaaz.gov/DocumentCenter/View/13206 (IBC) and sahuaritaaz.gov/DocumentCenter/View/13210 (IPC).; Manufactured homes, mobile homes, and factory-built buildings: installation permits are issued per the intergovernmental agreement between the Town of Sahuarita and the Arizona Office of Manufactured Housing, with the Town's own Zoning Clearance and utility-connection fees applying separately (Town Code § 3.10.080(G)). Source: Town of Sahuarita Town Code Chapter 3.10, Building permit fees, subsection G — verified live via real-browser navigation 2026-07-16 at ecode360.com/49024348#49024356 (codepublishing.com/AZ/Sahuarita now redirects to this ecode360.com host; this is codified Town Code text, structurally stable, not a frequently-revised fee resolution).. Local amendments apply — see the Sahuarita overview page for the full list.

Sources & verification

Verified against official sources. Last reviewed 2026-07-06.

Fees, timelines, and adopted codes are researched from each jurisdiction's published records — see how we verify. Requirements change and vary by project, so always confirm the current details with the Sahuarita building department before you submit. PermitBase is an independent reference and is not affiliated with any government agency.